ESTIMATED CONSTRUCTION COST BREAKDOWN- Self Build
Borrower:________________________________________________________________________________________________
Location:_________________________________________________________________________________________________
1. Land - Acquisition Cost $________
2. Development Costs
Site Improvements $________
Total Development Costs $________
3. Building Costs $________
(see total of right column)
4. Soft Costs
Interest (during construction) $______
Legal Fees - Borrower’s $______
Architect/Engineering $______
Estimated Closing Costs $______
Brokerage Fees $______
Total Soft Costs $________
TOTAL ESTIMATED COST $________
Less Deposit Paid to Builder $________
Less Deposit on Land $________
Less Cash Payments Made to Date: $________
___________________________
Net Amount Required to Build $_______
Loan Amount Requested $________
Cash Balance Required to Complete $________
Source of cash balance required: ____________________
_______________________________________________
_______________________________________________
______________________________________
Borrower Signature Date
_______________________________________
Borrower Signature Date
2001Lending/Forms&DisclosuresCabinet/costbreakdowns
Building Costs
PMHI PACKAGE COST: $__________
Demolition $__________
Foundation - basement/garage $__________
Poured concrete $__________
Trench/backfill/waterproofing $__________
Structural steel $__________
Lumber (included in PMHI) $__________
Other Lumber (if applicable) $__________
Rough framing - labor $__________
Trusses (included in PMHI) $__________
Trusses installation labor $__________
Roofing including labor $__________
Sheathing (including in PMHI) $__________
Gutters $__________
Windows (included in PMHI) $__________
Exterior/painting/trim with labor $__________
Doors- interior/exterior $__________
Exterior doors (included in PMHI) $__________
Rough heating $__________
Rough plumbing $__________
Rough electric $__________
Fireplace(s) $__________
Insulation $__________
Furnace/AC Unit $__________
Drywall $__________
Finish carpentry/trim $__________
Acoustical $__________
Wood flooring $__________
Tile flooring $__________
Linoleum/carpet flooring $__________
Interior Painting $__________
Cabinets - kitchen/bathrooms $__________
Finish tile work $__________
Marble Tile $__________
Countertops $__________
Appliances $__________
Plumbing Fixtures $__________
Showers/tubs $__________
Electrical fixtures $__________
Elevator $__________
Propane/oil tank $__________
Fire/security system $__________
Exterior porches/patios/decks $__________
Electric/water/sewer lines $__________
Septic system $__________
Well $__________
Blacktop/sidewalks $__________
Final grading/seeding/landscaping $__________
Other:_________________________ $__________
Contingencies $__________
Total Building Costs $__________
click to sign
signature
click to edit
click to sign
signature
click to edit