COMPREHENSIVE ENERGY SAVINGS WORKSHEET
January 1 through December 31, 2021
The ComEd Energy Efficiency Program offers multiple project options that will allow you to optimize your facility’s
performance and achieve significant energy savings. The comprehensive energy savings offer rewards you with a 20
percent additional project incentive for completing three or more eligible energy efficiency projects within two years.
Here’s what you’ll need to get started:
A list of comprehensive energy savings eligible measure selections, as shown on pages 2 through 6
Standard incentives application form
Incentive worksheets for chosen eligible measures
How to Participate
Select three or more project options in this worksheet. All measures applied for must qualify for standard or
custom measure requirements.
Apply with the standard incentives application form (details below).
Complete your projects within two years.
Receive standard incentives after each completed project.
Earn an additional 20 percent incentive based on the total incentives paid for the three projects.
Details
The following requirements apply in order to qualify for comprehensive energy savings:
1. Eligible measures and energy saving opportunities will be determined by ComEd. The intent of
comprehensive energy savings is to improve your entire suite, floor or facility; the ComEd account number must
be the same for all projects. Proposed projects that do not meet this criteria may not be eligible to receive
comprehensive incentives.
2. Pre-application is required; review instructions on the standard incentives application form. Wait for
a reservation letter before starting your project. Submit a pre-application, a comprehensive energy savings
worksheet and all applicable incentive worksheets for selected measures. Wait until you receive a reservation
letter before starting your project.
3. The comprehensive energy savings project funds are reserved for two years, giving you time to complete all
selected measures.
4. Comprehensive energy savings projects may be completed in phases or all at once. You may submit a final
application for each completed, installed measure and receive your standard incentive payment for that project.
You can use those funds towards your next selected project.
5. The additional comprehensive energy savings incentives are paid after all selected measures are
installed. For example, once you receive final standard incentive payments for three selected options, you will
receive an additional incentive payment. It is calculated by multiplying the final incentive payments for the three
selected options by 20 percent.
January 1 through December 31, 2021
COMPREHENSIVE ENERGY SAVINGS WORKSHEET
2
Directions: Please save a copy of this form to your computer by selecting “File/Save As” before entering text and
numbers. Then fill in your information electronically and select “Save. Note that this form requires Adobe Reader
®
version 11.0 to function properly. Download the most recent version of Adobe Acrobat Reader DC
®
at
http://get.adobe.com/reader.
Specifications
1. A pre-application is required for all selected strategy measures; review instructions on the standard incentives
application form. Wait until you receive a reservation letter before starting your project.
2. In addition to the specifications listed below, projects are required to follow measure-level specifications as noted
on each applicable incentive worksheet. Additional measure requirements may apply.
3. Choose any combination of three options from the list below. Cannot choose more than two options from a single
section.
Lighting
Lighting System
(this option requires the following)
Must be qualified indoor or outdoor LED fixtures or retrofits
Must replace a minimum of 50% of either indoor or outdoor fixtures
Lighting Controls
Minimum of 50% of indoor or outdoor lighting wattage controlled
Networked Lighting System
Must be qualified indoor or outdoor networked lighting system
May use option 1 or option 2 from networked lighting measure
Cannot be combined with Lighting System or Controls options
Lighting Subtotal
(use Total Incentive Requested from Lighting or Networked Lighting incentive worksheet)
January 1 through December 31, 2021
COMPREHENSIVE ENERGY SAVINGS WORKSHEET
3
HVAC
Energy Management System (EMS)
Advanced Roofop Unit Controls
Guest Room Energy Management (GREM)
GREM must be installed in all guest rooms
Demand Controlled Ventilation
Chiller / Roofop Unit / Geothermal
Energy Recovery Ventilation
Installation of an enthalpy wheel or enthalpy plate
Variable Speed Drive (VSD)
VSDs must be installed on primary fans or pumps associated with one of the systems
listed below.
Central plant pumps
Central air handlers or RTU fans
Cooling Tower pumps/fans
HVAC Subtotal
(use Total Incentive Requested from HVAC incentive worksheet)
January 1 through December 31, 2021
COMPREHENSIVE ENERGY SAVINGS WORKSHEET
4
Compressed Air
New Compressor with Integrated VSD, or
Retrofit VSD on Existing Compressor
Refrigerated dryers
Compressed Air Subtotal
(use Total Incentive Requested from Compressed Air incentive worksheet)
Refrigeration
New Display Case (new construction)
New installed cases must include LED lighting, electronically commutated motors
(ECMs) and eligible controls
Anti-Sweat Heater Controls for closed cases
Retrofit Display Case
Retrofit cases must include LEDs, ECMs and eligible controls
Open cases must be fitted with night covers
Closed cases must be fitted with upgraded doors
Walk-in Coolers or Freezers
Must be equipped with LEDs, EC motors and eligible controls
Remote Cooling Improvements
Must include floating head pressure controls
Refrigeration Subtotal
(use Total Incentive Requested from Refrigeration incentive worksheet)
January 1 through December 31, 2021
COMPREHENSIVE ENERGY SAVINGS WORKSHEET
5
Custom
New custom project
Custom Subtotal
(use Total Incentive Requested from Custom incentive worksheet)
Industrial
Multiple projects count as a single option
Barrel Wraps for Injection Molders and Extruders
Insulated Pellet Dryer Duct
Conversion of DC drives in Plastic Extruders to AC drives
Fiber Laser Cutting Machines
All Electric Injection Molding Machine
Hybrid Injection Molding Machine
Industrial Subtotal
(use Total Incentive Requested from Industrial incentive worksheet)
January 1 through December 31, 2021
COMPREHENSIVE ENERGY SAVINGS WORKSHEET
6
Other Energy Ecient Equipment
Multiple projects count as a single option
Air-side economizer
Chiller water reset controls (if not selected as an EMS control strategy)
Commercial kitchen equipment
Lab filters
Fume hood measures
Lab air changes per hour (ACH) optimization
Other Equipment Subtotal
(use Total Incentive Requested from applicable incentive worksheet)
STANDARD TOTAL INCENTIVE COMPREHENSIVE ENERGY SAVINGS ADDITIONAL 20% INCENTIVE
GRAND TOTAL INCENTIVE REQUESTED
January 1 through December 31, 2021
COMPREHENSIVE ENERGY SAVINGS WORKSHEET
7
Project Timeline
Provide applicable project information
Project 1: Estimated completion date: Estimated project cost:
Project 2:
Estimated completion date: Estimated project cost:
Project 3:
Estimated completion date: Estimated project cost:
Project 4:
Estimated completion date: Estimated project cost:
Project 5: E
stimated completion date: Estimated project cost:
Contractor Contacts
Provide applicable contractor contact information
Lighting
Lighting company name: Contact name:
Mailing address:
City: State: Zip code:
Telephone: Email:
HVAC
HVAC company name: Contact name:
Mailing address:
City: State: Zip code:
Telephone: Email:
January 1 through December 31, 2021
COMPREHENSIVE ENERGY SAVINGS WORKSHEET
8
Refrigeration
Refrigeration company name: Contact name:
Mailing address:
City: State: Zip code:
Telephone: Email:
Compr
essed Air
Compressed Air company name: Contact name:
Mailing address:
City: State: Zip code:
Telephone: Email:
Other
Other company name: Contact name:
Mailing address:
City: State: Zip code:
Telephone: Email:
January 1 through December 31, 2021
COMPREHENSIVE ENERGY SAVINGS WORKSHEET
9
Submit the following
Pre-application
Comprehensive energy savings worksheet
Incentive worksheets
Customer Signature (Required)
I certify that the information provided in this application is true and correct. I have read and understand the program
requirements and terms and conditions set forth in this application and agree to abide by these requirements. I verify
by my signature hereto that I have authority to submit this application.
ComEd customer (Customer) authorized signature: Print name: Date:
Title and/or relationship to company:
Terms and conditions apply. Offers are subject to change.
Actual savings will vary by customer’s energy usage and rate.
© Commonwealth Edison Company, 2021
The ComEd Energy Efficiency Program is funded in compliance with state law.
click to sign
signature
click to edit