VIRGINIASCAN INDUSTRIAL BUILDING
DATA SHEET
To be included on VirginiaScan, the building must have at least 5,000 sq. ft. available and all the fields in blue must be provided.
A sale/lease price or price range is requested.
LOCATION
Property Name: _____________________________________________________________________________________________
Street Address: _____________________________________________________________________________________________
City: ______________________________________ Zip Code: _____________ Locality: ________________________________
Within Corporate Limits: Yes No
Industrial Park _______________________________________________________________________________________________
Research Park _______________________________________________________________________________________________
Virginia Enterprise Zone: Yes No Technology Zone: Yes No Foreign Trade Zone: Yes No
Hub Zone: Yes No New Market Tax Credit Zone: Yes No
OWNERSHIP
Available for Lease: Yes No Available for Lease/Purchase: Yes No Lease Type: ____________________
Minimum Lease Rate (per sq. ft.): ___________________________ Maximum Lease Rate: ___________________________
Available for Sale: Yes No Sale Price: ________________________________ Publicly Owned: Yes No
Owner: ______________________________________________________________ Owner Phone: ________________________
Owner E-Mail: _____________________________________________________________ Date Available: ___________________
Contact: __________________________________________________________________ Phone: _________________________
Address: __________________________________________________________________ Fax: ___________________________
________________________________________________________________ _________ Mobile: _________________________
E-Mail: ___________________________________________________________________
Submitted By: ________________________________________________________ Date Submitted: _______________________
VIRTUAL
Virtual Building: Yes
No Right Now Site Name: _________________________________________________________
Site Plan Approval: Yes
No Preliminary Design: Yes No Construction Schedule: Yes No
Development Team: Yes
No Building Renderings: Yes No Permits and/or Approvals: Yes No
Construction Lead Time (months): ________________
SPECIFICATIONS
Total Building Space (sq. ft.): ____________ Total Available: ______________ Maximum Contiguous: _____________
Manufacturing: _______________ Warehouse: ________________ Office: ________________ Other: __________________
Minimum Space Available: ________________ Building Dimensions: __________________ Number of Floors: __________
Expandable: Yes No Graded Expansion Pad: Yes No Date Vacated: _______________________
Maximum Size of the Building Allowable by Architecturally Designed Expansion: ____________________
Ceiling Height at Eaves: ________ Ceiling Height at Center: _________ Number of Dock Height Doors: ___________
Number of Drive-In Doors: ________ Size of Drive-In Doors: _________________ Number of Rail Doors: ___________
Column Spacing: ____________________ Bay Size: ______________________ Multi-Tenant: Yes
No
Manufacturing Heat: _____________________ Warehouse Heat: _____________________ Office Heat: _________________
Manufacturing A/C: ______________________ Warehouse A/C: ______________________ Office A/C: __________________
Recent Use: ___________________________________________ Best Use: ____________________________________________
CONSTRUCTION
Construction Type: __________________________________________________________________________________________
Construction Year: _____________ Year of Additions: ______________ Roof Type: ______________________________
Sprinkler Type: ______________________ Floor Type: _________________________ Floor Reinforced: Yes
No
Floor Thickness (inches): _____________ Raised Floor: Yes
No LEED Certified: Yes No
Insulation: Yes
No Insulation Location: ______________________________ Insulation Thickness: ________
SITE SPECIFICATIONS
Site Acreage: ___________ Additional Acreage Available: ____________ Conforms to Present Zoning: Yes
No
Zoning Classification: _________________________________________________ Outside Storage Permitted: Yes
No
Zoning Restrictions: ___________________________________________________________________________________________
On-Site Parking: Yes
No Number of Employee Parking Spaces: ___________________
ENVIRONMENTAL
U.S. Army Corps Certified Wetland Study Available: Yes
No
Phase I Environmental Audit Available: Yes
No Phase II Environmental Audit Available: Yes No
Brownfield: Yes
No Nature of Contamination: ____________________________________________________________
Remediation Plan: Yes
No DEQ Status Letter: Yes No
FEATURES
Cranes
Number of Cranes: ___________ Minimum Crane Capacity (tons) ___________ Maximum Crane Capacity: __________
Minimum Clearance Under Hook (feet): _____________ Engineered Crane Capacity: ______________
Food Processing
Refrigeration: Yes
No Refrigeration Space (sq. ft.): ___________________ FDA Approved: Yes No
Freezer: Yes
No Freezer Space (sq. ft.): ______________________ USDA Approved: Yes No
Clean Room
Available: Yes
No Space (sq. ft.): __________________ Class: ____________________
Lab Space
Lab Type: ____________________ Lab Space (sq. ft.): ___________________ Number of Labs: __________________
Most Recent Use of Space: ________________________________________________ Construction Year: _______________
Year of Additions: ______________ Existing Equipment: _______________________________________________________
Shared Services: __________________________________________________ Additional Fit-Out Required: Yes No
Time Needed for Fit-Out: ________________ Lease Rate (per sq. ft.): _____________________________________
Other
Computer Room: Yes
No Other Features: _________________________________________________________________
UTILITIES
Electric Power
Name of Primary Supplier: ____________________________________________________________ Redundant: Yes
No
Name of Secondary Supplier: __________________________________________________________ Voltage: _____________
Phase: ________________ Amps: ____________________ Electric UPS: Yes
No Generator: Yes No
Natural Gas
Name of Supplier: ______________________________________________________ Distance from Property (feet): _______
Line Size (inches): ___________ Pressure (psi): ______________ Propane Equipped: Yes
No
Water
Water Provider: ________________________________________________________ Distance from Property (feet): _______
Line Size (inches): ___________ Total Capacity of Treatment Plant (gpd): ___________________________________
Available Capacity to Property (gpd): __________________ Water Tank Capacity (gallons): ___________________
On-Site Treatment Plant: Yes No Well Capacity (gpd): _____________________
Sewer
Sewer Provider: ________________________________________________________ Distance from Property (feet): _______
Line Size (inches): ___________ Total Capacity of Treatment Plant (gpd): ___________________________________
Available Capacity to Property (gpd): __________________
On-Site Treatment Plant: Yes
No Septic System Capacity (gpd): _____________________
Telecommunications
Primary Telecommunications Provider: _________________________________________________________________________
Other Providers: ______________________________________________________________________________________________
Fiber: Yes
No Distance to Fiber (feet): ___________________ Redundant Routes: Yes No
Wireless Broadband: Yes
No Sonet Ring: Yes No
Broadband Speed Level:
Low (under 2 Mbps) Medium (2-6 Mbps)
High (6 Mbps or higher, excluding satellite claiming max speeds of up to 27 Mbps down)
Other: ______________________________________________________________________________________________________
TRANSPORTATION
Rail
Primary Railroad: ______________________________________ Secondary Railroad: __________________________________
Served by Rail Siding: Yes No If no, can rail siding be installed: Yes No Distance (feet): ________
Highway
Distance to Nearest Interstate Interchange (miles): __________ Interstate: ____________
Interchange Name/Exit Number: _________________________________________________________________________________
Distance to Nearest 4-Lane Arterial (miles): ___________ Arterial Name/Route Number: __________________________
Name/Route Number of Highway or Street Serving Property: _______________________________________________________
Air
Distance to Commercial Airport (miles): ____________ Airport Name: ____________________________________________
Distance to General Aviation Airport: ______________ Airport Name: ____________________________________________
Water
Navigable Waterway: Yes No Name: ___________________________________________ Channel Depth (feet): ______
Public Transportation
Bus Rail Water
COMMENTS
___________________________________________________________________________________________________________
___________________________________________________________________________________________________________
___________________________________________________________________________________________________________
___________________________________________________________________________________________________________
To be included in our computerized database, a valid street address or nearest street intersection
ahagy@hopewellva.gov . This form should be returned to:
must be provided, along with an
aerial photograph or tax map showing the boundaries of the site. Site layouts, master plans, site plans, etc. should also be provided.
Digital images are welcome and may be e-mailed to
CITY OF HOPEWELL ECONOMIC DEVELOPMENT
Mr. J. Andrew "Andy" Hagy
Economic Development Director
300 North Main Street
Hopewell, Virginia 23860
PH: (804) 541-2243
Fax: (804) 541-2248
Email:
ahagy@hopewellva.gov
Virtual Building Standards
Preliminary Design Detailed drawings of the layout of each floor of the structure showing openings of the building, interior
partitions, columns, fixtures, etc. In addition to the floor plan, elevations of the building or renderings depicting the exterior of the
building should be available.
Building Specifications A listing and description of building systems, materials and finishes sufficient to provide the basis for firm
construction costs must be provided.
Cost Estimates – Firm cost estimates that have specified time horizons (six months minimum) must be provided.
Construction Schedule A schedule of the construction of the building, associated site work and any utility extensions must be
provided.
Development Team A development team with the appropriate architectural, engineering and construction capability must be
assembled to execute the project.
Building Renderings A three dimensional graphic representation of the exterior of the building showing how the building would be
sited on the lot will be required. A “virtual building” tour of the building is desirable but not required.
Permits or Approvals If the building requires additional permits from the locality prior to the commencement of construction, a
letter from the chief administrator of the locality outlining what permits are required and the timeframes necessary to obtain those
permits is required. If additional permits have been obtained, copies of the permits must be available with any expiration dates
noted.
10/08