SENSORS
CONTROLLERS
ACTUATORS
FIRE DAMPERS CHECKED
SMOKE DAMPERS CHECKED
FAN
DUCT LEAK TEST
AIR BALANCE TEST
COIL NUMBER
COIL NUMBER
CONTROL DAMPERS
SYSTEM TEST
EXTERIOR OF EQUIPMENT
COMPLETENESS OF ASSEMBLY
EQUIPMENT ROTATION
ELECTRICAL/MECHANICAL INTERLOCKS
INSTRUMENTS
PROPER GROUNDING
PROPER INSULATION
TIGHTNESS OF BOLTED CONNECTIONS
PROPER LUBRICATION
CONDENSATE DRIP PANS
EQUIPMENT IDENTIFICATION
BRACING
LABELING AND TAGGING
SAFETY INTERLOCKS
WORKING SPACE
ANCHORAGE
SYSTEM CLEANED
COMPARISON TO DRAWINGS
CONTROL SYSTEM
FILTERS
1. PLANT 2. LOCATION 3. JOB NUMBER
4. EQUIPMENT 5. AIR LOOP DESIGNATION
6. DATE (YYYYMMDD)
7. TEST EQUIPMENT 8. TESTED BY
9. FAN MANUFACTURER 10. MODEL NO 11. SERIAL NO 12. RATED FLOW
19. NOTES
14. HP @ RPM13. FAN TYPE 15. RATED PRESSURE
VENTILATION SYSTEM INSPECTION CHECKLIST
For use of this form, see TM 5-697; the proponent agency is COE.
SECTION A - CUSTOMER DATA
DA FORM 7479-R, DEC 2002
APD LC v1.00
SECTION B - EQUIPMENT DATA
SECTION C - VISUAL AND MECHANICAL INSPECTION
COND* NOTESCHECK POINT COND* NOTESCHECK POINT
SECTION D - CALIBRATION AND SET POINT
*CONDITION: A=ACCEPTABLE; R=NEEDS REPAIR, REPLACEMENT OR ADJUSTMENT; C=CORRECTED; NA=NOT APPLICABLE
16.
SECTION E - SYSTEM TESTS
17.
DESCRIPTION
NOTES
18.
NOTESOPERATING MODES TEMPERATURES PRESSURES FLOWS LEVELS