UNIVERSITY OF TAMPA
VENDOR/CONTRACTOR
MANUAL
Updated 11/13/2020
Page 2 | 52
TABLE OF CONTENTS
TABLE OF CONTENTS
SAFETY ............................................................................................................................................................ 5
1.0 SAFETY POLICY ...................................................................................................................................................5
1.1 SAFETY RESPONSIBILITIES .....................................................................................................................................5
1.2 GENERAL SAFETY REQUIREMENTS ..........................................................................................................................5
PROJECT MANAGEMENT GUIDELINES ...................................................................................................... 17
MINIMUM CONTRACTOR’S REQUIREMENTS ............................................................................................ 18
OUTSIDE CONTRACTOR/VENDOR ORIENTATION ................................................................................... 21
CAMPUS PARKING FOR CONTRACTORS ................................................................................................... 22
ENVIRONMENTAL CONTROLS .................................................................................................................... 24
CHEMICAL HAZARD COMMUNICATION .............................................................................................................................. 24
DISPOSAL OF PAINTS AND OTHER PRODUCTS USED ON SITE .................................................................................................. 26
EROSION AND SEDIMENT CONTROL.................................................................................................................................. 26
APPENDIX ....................................................................................................................................................... 28
APPENDIX A: CONTRACTOR ACKNOWLEDGEMENT AND COMPLIANCE STATEMENT FORM .......................................................... 29
APPENDIX B: CERTIFICATE OF INSURANCE REQUIRED ........................................................................................................... 32
APPENDIX C: PERMIT TO WORK.................................................................................................................................... 33
APPENDIX D: JOB HAZARD ANALYSIS & TAKE 5 DYNAMIC RISK ASSESSMENT .......................................................... 35
APPENDIX E: UTILITY OUTAGE/LIFE SAFETY IMPAIRMENT REQUEST FORM (PLANNED OUTAGES).............................................. 40
APPENDIX F: CHEMICAL INCIDENT REPORTING FORM ........................................................................................................... 43
APPENDIX G: CONTRACTOR/VENDOR GOLF CARTS AND LOW SPEED VEHICLES ......................................................................... 46
APPENDIX H: AUTOMATED CLEARING HOUSE FORM ................................................................................................. 49
APPENDIX I: PRE-POST PROJECT REQUIREMENTS ................................................................................................................ 51
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 3 | 52
Numbers to Know
Emergency .............................................................................................................................. 911
Campus Safety .......................................................................................................... 813-257-7777
Facilities ...................................................................................................................813-253-6227
Director of Facilities (Jennifer Isenbeck) ................................................................... 813-731-2203
Maintenance Manager (Angie Jordan) .............................................. 813-257-3034/813-695-0089
UT Design & Construction Manager (Lisa Brachna) ................................................. 813-258-7256
UT Design & Construction Manager (Scott Gossen)………………………………………….813-220-5266
Grounds Manger (Tim Purdy) ................................................................................... 813-767-1788
Safety & Contract Manager (Steve Kim) .…………………………………………………… .... 772-579-3275
Facilities Maintenance Supervisor/Senior Electrician (Jason Foley) ................... ….813-373-1736
Facilities Maintenance Supervisor (Jack Wise) …………………………………………………813-601-3742
TECO/Peoples Gas (Emergency) .............................................................................. 877-588-1010
A&A Electric Locates (Ryan Hunter) ...................................................................... 813-781-9356
Troika Comm Locates (Wayne Harrison) .............................................................. 727-743-9868
Chemical Spills/Environmental Emergencies (Steve Kucera) ............ 813-257-3324/813-842-3528
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 4 | 52
Campus Building Physical Addresses
NOTE: This document is for internal use only and should be used solely for location purposes and not mailing
purposes. All regular University mail should be addressed to the appropriate box number at 401 W. Kennedy
Blvd., Tampa, FL 33606-1490.
BUILDING ADDRESS
Academic Tutoring and Academic Coaching .................506 UT McNeel Court
Aquatic Center ...............................................................507 UT University
Drive Martinez Athletics Center .............................................400 North Blvd.
Austin Hall.....................................................................110 UT Poe Parkway
Bailey Art Studios ..................................................................310 North Blvd.
Barrymore Hotel ...........................................................111 West Fortune St.
Baseball Field .........................................................................601 North Blvd.
Beach Volleyball Complex ......................................................315 North Blvd.
Brevard Hall.....................................................................203 N. Brevard Ave.
Campus Safety ...................................................................820 W. North A St.
Cass Building...................... .......................................611 UT University Drive
Central Receiving ............................................................1049 W. North A St.
Chiller Plant .......................................................................915 W. North A St.
Communication Annex ................................................607 UT McNeel Court
Daly Innovation and Collaboration Building ......................820 W. North A St.
Dickey Health and Wellness Center .................................111 N. Brevard Ave.
East Walker Hall .........................................................509 UT University Drive
Faculty/Staff Offices .....................................................320 W. Kennedy Blvd.
Fairgrounds Offices .......................................701 Frederic H. Spaulding Drive
Falk Theatre..................................................................428 W. Kennedy Blvd.
Ferman Music Center ....................................803 Frederic H. Spaulding Drive
Fitness and Recreation Center ...............................................315 North Blvd.
Gatehouse ...................................................................401 W. Kennedy Blvd.
Graduate and Health Studies Building ..........................350 UT Archway Lane
Grand Central Park Building ......................... 442 W. Kennedy Blvd. Suite 350
Health Sciences and Human Performance Building ................410 North Blvd.
Jaeb Computer Center ...............................................601 UT University Drive
Jenkins Hall.........................................................................730 W. North A St.
McNeel Boat House ......................................................501 UT McNeel Court
Kennedy/Boulevard Building........................................813 W. Kennedy Blvd.
Krusen Building ................................................................1101 W. North A St.
BUILDING ADDRESS
Library Annex ........................................................................1717 W. Cass St.
Macdonald-Kelce Library ..........................................405 UT University Drive
MacKechnie Building ......................................................110 N. Brevard Ave.
Marine Science Field Station...............................5220 W. Tyson Ave. Bldg. A
McKay Hall .................................................................403 UT University Drive
Morsani Hall...............................................................500 UT University Drive
Naimoli Family Athletic and Intramural Complex ............1150 W. North A St.
Naimoli Family Softball Complex ................1005 Frederic H. Spaulding Drive
North Walker Hall ...........................................402410, 450 UT Spartan Lane
Old School House .................................................403 Old School House Way
Palm Apartments .............................................................202 N. Brevard Ave.
Pepin Stadium ....................................................................... 417 North Blvd.
Plant Hall ...................................................................300 UT University Drive
ROTC Leadership Development Course .......1111 Frederic H. Spaulding Drive
Saunders Art Center.......................................805 Frederic H. Spaulding Drive
Scarfone/Hartley Gallery .......................................................310 North Blvd.
Schoomaker ROTC and Athletics Building ....1001 Frederic H. Spaulding Drive
Science Annex.............................................................610 UT McNeel Court
Smiley Hall ....................................................401 Frederic H. Spaulding Drive
Southard Family Building ...........................................401 UT University Drive
Straz Hall ................................................................................521 North Blvd.
Science Research Lab ………………………………………….……909 W. Kennedy Blvd.
Sykes Chapel ……………………………………………. 601 Frederic H. Spaulding Drive
Sykes College of Business .............................515 Frederic H. Spaulding Drive
Thomas Parking Garage ...............................810 Frederic H. Spaulding Drive
Thompson Building...........................................................200 N. Edison Ave.
Urso Hall.......................................................................404 W. Kennedy Blvd.
Vaughn Center ...............................................................200 UT Poe Parkway
West Parking Garage .............................................................514 North Blvd.
Rev.
10/20
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 5 | 52
SAFETY
1.0 SAFETY POLICY
The personal safety and health of University of Tampa Students, Faculty, Staff and Contractors is of
primary importance. The prevention of occupationally induced injuries and illnesses is of such
consequence that it will be given precedence over operating productivity whenever necessary.
Management will provide all mechanical and physical facilities required for the personal safety and
health of each of its employees. injury and illness prevention on the part of the University and its
contractors.
Our concern for safety and health of all human beings is daily, even hourly. We expect every person
who conducts the affairs on University property, no matter in what capacity they function, to accept
this concern and its responsibility. Contractors and University employees are expected to use the safety
equipment provided. Rules of conduct and rules of safety and health must be observed. Safety
equipment cannot be abused or destroyed.
Cooperation between University personnel and contractors in the observance of this policy will ensure
safe-working conditions to minimize the risk of an accident and consequences to people if an accident
should occur. It will also assist in reducing workers' compensation costs (direct costs) and reduce jobsite
down time, material loss and regulatory agency fines (indirect costs).
1.1 SAFETY RESPONSIBILITIES
1. Eliminate potential hazards by providing appropriate safeguards, personal protective equipment and
safe work tasks.
2. Provide necessary personal protective equipment and enforce its use and care.
3. Provide effective training, which is required by the "standards", as a minimum for the employees.
4. Become familiar and comply with applicable OSHA standards (29 CFR 1910, General Industry, and 1926,
Construction) and make copies of medical records as well as all safety and health programs available
for employees to review.
5. Review, consider for approval, and execute appropriate action on safety policies developed by safety
committees or safety director.
6. Ensure a high level of productivity and safety performance and hold project management staff
accountable.
7. Assign an individual(s) [competent person] the authority for the implementation of the safety program
at each worksite.
1.2 GENERAL SAFETY REQUIREMENTS
Strict monitoring of and adherence to safety rules and regulations is important not only to protect the project
workers, but also to protect the students, staff, and the ability of the facility to provide emergency services.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 6 | 52
Important Phone Numbers
Agency/Department Number
Security
813-257-7777
Facilities Main
813-253-6227
Operations and Maintenance
813-257-3034
Chemical Hygiene & Biological Safety Officer
813-842-3528
UT Emergency Operations Website
http://www.ut.edu/emergency/
SAFETY PROGRAM OBJECTIVES
Safety and health programs strive to protect people, property, and the environment. This reference manual is
an effort to provide contractors performing work for UT Facilities with the basic requirements for a site safety
program to protect students, visitors, employees, and other contractors working in and around the University.
The objective of these programs is to:
1) Provide a workplace that is clear of recognized hazards.
2) Compliance with all City, State, Federal and deeming authorities to follow consensus standards.
3) Maintain an effective safety management program that includes workers and management.
4) Develop a cooperative effort between contractors and UT staff to promote workplace safety.
BASIC SAFETY RULES
1) Vehicles must obey the posted speed limit while on University property.
2) Contractors must park in approved Contractor Parking area only.
3) All posted warnings and signs must be obeyed.
4) Smoking is not permitted on University of Tampa property beginning Aug. 1, 2016.
5) Fighting and horseplay is not permitted on University property.
6) Firearms are not permitted on University property, including in vehicles on property.
7) Alcohol is not permitted to be consumed by contractors on property.
8) Work areas must be maintained in an orderly fashion. Exits may not be blocked.
9) Trash must be removed on a daily basis.
COVID 19 MASK POLICY
UT policy reads as follows:
Faculty, staff, students, and visitors, including vendors, are required to wear face masks/coverings in all
common areas of campus facilities including classrooms, and outdoor campus areas where social
distancing is not possible. Exceptions are permitted for the use of dining facilities, participation in athletic
practices and contests and instruction in selected fine arts. Detailed instructions on how best to navigate
these activities will be provided by the respective areas that are reviewed by Dining Services, Athletics,
Fitness and Recreation Center, and the College of Arts and Letters.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 7 | 52
As with all the Spartan Shield Plan requirements, our face mask/coverings policy is grounded in CDC
guidance:
Cloth face coverings are recommended as a simple barrier to help prevent respiratory droplets from
traveling into the air and onto other people when the person wearing the cloth face covering coughs,
sneezes, talks, or raises their voice. This is called source control. This recommendation is based on what
we know about the role respiratory droplets play in the spread of the virus that causes COVID-19, paired
with emerging evidence from clinical and laboratory studies that shows cloth face coverings reduce the
spray of droplets when worn over the nose and mouth. COVID-19 spreads mainly among people who are
in close contact with one another (within about 6 feet), so the use of cloth face coverings is particularly
important in settings where people are close to each other or where social distancing is difficult to
maintain.
Cloth face coverings are a critical preventive measure and are most essential in times when social
distancing is difficult. If cloth face coverings cannot be used, make sure to take other measures to reduce
the risk of COVID-19 spread, including social distancing, frequent hand washing, and cleaning and
disinfecting frequently touched surfaces.
All face coverings, whether disposable or reusable, must
be made with at least two layers of breathable material;
fully cover the nose and mouth and secure under the chin;
fit snugly but comfortably against the side of the face; and
be secured with ties or ear loops, allowing one to remain hands-free.
Based on guidance of health authorities, the following are not acceptable face coverings: neck gaiters, open-
chin triangle bandanas, and face coverings containing valves, mesh material or holes of any kind.
We have also been asked about the use of face shields to replace face coverings. The CDC offers this
information:
It is not known if face shields provide any benefit as source control to protect others from the spray of
respiratory particles. CDC does not recommend use of face shields for normal everyday activities or as a
substitute for cloth face coverings. Some people may choose to use a face shield when sustained close
contact with other people is expected. If face shields are used without a mask, they should wrap around
the sides of the wearer’s face and extend to below the chin. Disposable face shields should only be worn
for a single use. Reusable face shields should be cleaned and disinfected after each use.
Therefore, unless a face shield is coupled with a face mask, it is not considered an acceptable masking practice
on our campus.
Please refer to the CDC’s web page on face coverings
for a more complete treatment of this topic. It is
important to note that UT policy may vary from City and County Executive Orders. You may want to refer to
these links as you travel the City and County.
City: https://www.tampagov.net/emergency-management/covid-19/face-covering
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 8 | 52
County: https://www.hillsboroughcounty.org/en/residents/public-safety/emergency-
management/stay-safe/face-coverings-and-masks
CONTRACTOR SAFETY REQUIREMENTS
These subjects have been addressed in an effort to promote coordination between the contractor and the
organization, and to insure the timely and safe completion of projects with minimal impact to the operations
of the University.
Emergency Procedures for any Event (RACE):
Get People Out (Rescue), call 911 if anyone is injured
Call Campus Safety (813-257-7777) to report the incident, then Facilities (Activate Alarm)
Contain the event if possible to do so
Exit, await directions from Campus Safety or Facilities on what to do next.
Training of Employees performing work on campus.
It is up to the individual contractors to ensure that all their employees whether employed directly or
subcontracted are trained on proper procedures. This shall not be limited to Hazardous Analysis as further
detailed in this document, but shall encompass procedures necessary for safe, productive daily
performance.
Employees are not to engage in deceptive behavior or make false statements regarding any aspect of safety
culture on university property. Unless an incident/accident is being investigated by an agency, if asked
about a policy/procedure during an inspection, the employee should direct the person asking the question
to their supervisor. Supervisors shall embrace a culture that encourages openness and honesty about
incidents that occur and working constructively to resolve the problem in a manner that does not create a
culture of fear in reporting incidents or near misses.
Hazard Communication and Chemical Safety
1) Contractors shall always have copies of Safety Data Sheets available at the job site for review . SDS
information should also include a weblink and approximate quantities contained on site. It is also
acceptable to have a thumb drive or access to website with all applicable SDS in the
Superintendent/Foreman’s vehicle.
2) To insure all contractor employees are familiar with the safe handling and operation of hazardous
materials, including use of personal protective equipment, each contractor must establish and
maintain an effective hazard communication program in accordance with OSHA 29 CFR 1926.59 or
29 CFR 1910.1200.
3) The contractor HazCom Program must contain:
a) A written hazard communication program that is consistent with the UT policies/procedures
set forth on http://utweb.ut.edu/ehs
.
b) An inventory of chemicals
c) All chemicals are kept in appropriate containers that are clearly labeled and tightly sealed when
not in use.
d) Employee training and documentation.
4) Upon discovery of any materials that may contain asbestos (Presumed Asbestos Containing
Material PACM), the contractor must stop work immediately and contact the Facilities POC. All
asbestos-related activity shall adhere to the Facility’s Asbestos Management Plan.
5) Before operations on any potential lead containing material, the Facilities POC shall be consulted
to confirm activity.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 9 | 52
6)
University of Tampa has procedures in place to contact the appropriate personnel should PACM,
Lead or other substances that require documented and controlled removal. Steve Kucera,
University of Tampa Chemical Hygiene and Biological Safety Officer shall be contacted
(skucera@ut.edu
, 813-842-3528), cc: Facilities Director (jisenbeck@ut.edu) and Maintenance
Manager (angelajordan@ut.edu).
7) Fluorescent Light bulbs and PCB Containing Ballast Disposal
a) Personnel removing fluorescent light bulbs are responsible for examining the bulb to determine
if the bulb should be recycled due to mercury vapor and lead content and insuring proper
storage until recycling.
i. Note: Green end caps or green writing indicate an environmentally friendly bulb,
which may be disposed of as normal construction waste.
b) The identification of any PCB containing or suspected PCB ballast’s, shall be reported to the
Facilities POC.
8) For more information on Chemical Safety and Emergencies, please refer to:
https://www.ut.edu/academics/environmental-health-and-safety-(ehs)
UNDERGROUND UTILITY LOCATION.
Any proposed excavation, digging, boring, blasting, or earth disturbance requires location of
underground utilities. Contractors shall call 811 for Sunshine request, additionally the University owns
and operates many of the internal utilities such as electric, communications, potable and fire water
and chilled water. Ryan Hunter at A&A Electric (813-781-9356) shall be contacted for electric utility
locates, Mills and Associates for all others, in the event a Communication line needs to be identified,
contact Wayne Harrison at Troika (727-743-9868) and notify Greg Scott (gscott@ut.edu). All
contractors shall document and provide a Permit to Work (Appendix C); to include a Job Hazard
Analysis (Use Appendix D or suitable substitute to be determined by Project Manager) prior to any
excavation work.
UTILITY SERVICE INTERRUPTIONS.
Before any work involving the planned or possible interruption of utilities, such as Fire Alarm, Fire
Sprinkler, electric, domestic water, gas or chilled water services. Extended utility and site work may
require utility locates throughout construction. These locates shall be called in as needed. A Utility
Outage Request (Appendix E) is required, this is also part of the Permit to Work requirements (Roof
permits will be issued in the future). Fire Impairment Requests (FIR; Appendix E) must be submitted and
approved at least 24 hours prior to commencement of work. Utility Outages must be submitted and
approved at least seven (7) calendar days in advance.
If a potable water line that feeds a UT building is broken and the possibility of contamination exists (e.g.
from soil), the public in that building must be protected by adequately notifying them not to drink the
water (i.e. Boil Water Notice). BEFORE restoring potable water flow to the building after the break has
been repaired the Facilities Director must be notified so that the University Leadership and CHBO can
be informed of the situation. Communication can then occur so faculty, staff, students and visitors can
be advised (via Global Email, Text Messaging, Signage on drinking fountains, etc. of the location where
water is not to be consumed for a period of time, to be determined by the CHBO and Facilities Director,
before water flow is restored. Communication will follow that the water is now safe to drink, once that
has been determined to be true.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 10 | 52
EXCAVATIONS AND TRENCHES
1) All trenches and excavations, adjacent areas, and protective systems shall be inspected daily by a
competent person.
2) Trenches greater than 5 feet in depth require shoring and sloping.
3) Substantial barricades to prevent persons from falling into an open trench shall be maintained
around the perimeter of trenches. This is especially important at the end of the workday for
trenches that must remain open overnight.
Note: Plastic ribbon or caution tape is NOT a suitable barricade for this purpose.
4) Ladders will be provided at least every 25 feet for access to trenches over 4 feet in depth.
ELECTRICAL HAZARDS
1) Each contractor and subcontractor shall insure a comprehensive electrical safety program.
Reference for such program shall be OSHA 29 CFR 1910.331 to 29 CFR 1910.333 and 29 CFR 1926
Subpart K.
2) Training in accordance with the electrical safety program shall be recorded and available for review.
3) All ground fault circuit interruption units shall be tested in accordance with a prescribed schedule.
4) All electrical equipment shall be inspected before use to insure proper grounding.
LOCKOUT/TAGOUT
1) The lockout/tagout (control of hazardous energy) standard shall be adhered to at all times. The
standards are referenced at 29 CFR 1910.147 and 29 CFR 1926.417. At a minimum, the standard
requires the following procedures:
2) Use of locks and/or tags on energy isolation devices
3) Special lockout/tagout procedures for jobs requiring multiple lockout/tagout devices may be
required and shall be communicated to Facilities Maintenance and Operations. Jason Foley will be
responsible for all University LOTO locks.
4) Contractors must provide their own lockout/tagout equipment.
5) All contractor employees must be trained on lockout/tagout procedure.
6) Locks and/or tags must not be removed by anyone other than the employee applying them except
under special circumstances and consultation with the Facilities POC
7) All contractors will have a written program for lockout/tagout, prior to commencing work with
hazardous energy sources.
8) Any device that will be locked or tagged out, that may be subject to lockout or tagout by a UT
Facilities employee, shall be pre-approved by Jason Foley or Angie Jordan.
9) The written program shall contain provisions for sanctions against an employee for violation of
lockout/tagout procedures.
10) UT Facilities has the right to conduct routine inspections of lockout/tagout work practices.
CONFINED SPACE ENTRY
1) Confined spaces present serious potential for injuries as a result of oxygen deficiency, toxic
products, flammable vapors, and hazardous energy. Each contractor must establish and maintain
an effective Confined Space Entry program that complies with OSHA 29 CFR 1910.146 and 29 CFR
1926.21(b)(6)
2) Contractors completing confined space work must file a copy of their program with the Facilities
POC.
3) Confined Space Entries shall be documented with the Facilities POC.
4) Contractors must provide all equipment required for safe entry and rescue, when working in
confined spaces.
5) The Fire Department will be notified of confined Space work when it will exceed four (4) hours in
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 11 | 52
duration.
FALL PROTECTION
1) Reasonable fall protection shall be provided to protect personnel from accidental falls associated
with floors, platforms, scaffolds, guardrails, physical barriers, and elevated work locations.
Standard guardrails must be provided for work locations 6 feet or more above the adjacent level, in
accordance with OSHA 29 CFR 1926.500, and fall protection for work over ten feet.
2) All employees working at unguarded locations above 6 feet in construction (10 feet on scaffolds)
must be protected by properly wearing approved fall protection equipment including safety
harnesses and lifelines as specified by supervision.
3) All employees required to wear approved fall protection devices shall be properly trained in their
use.
4) The employer must document proper training and demonstrated proficiency in use of the
equipment.
5) Supervisors shall enforce the use of fall protection devices, as required.
SCAFFOLDS
1) Contractors working with scaffolding equipment shall insure compliance with OSHA 29 CFR 1926,
Subpart L and 29 CFR 1910.28.
2) Access to scaffolds shall be limited to authorized personnel only. After normal working hours, all
efforts shall be made to insure limited access to the scaffolds.
EMERGENCY PROCEDURES
All employees of contractors must know and understand the procedures for reporting an emergency.
Periodic tests will determine the level of knowledge of employees with regard to emergency
procedures.
ACCIDENTS
All accidents, incidents, injuries, and illnesses must be reported to the General Contractor, Facilities
POC, and Facilities Director immediately. A report will also be filed with Campus Safety.
MANUAL MATERIALS HANDLING
Manual materials handling and other physical activities must be performed only by those employees
physically capable of doing so.
ENFORCEMENT
Enforcement of safety matters shall be done at the discretion of the General Contractor, Facilities
Safety Manager, and Facilities Director. Enforcement shall also occur at the subcontractor level.
Discipline may include removal of the employee or employer from the site.
INTERVENTION
Qualified members of the UT Facilities Team, CHBO and Campus Safety has the authority to stop any
work activity that is deemed inappropriate or posing a risk to the safety and well-being of persons or
property.
GENERAL SAFETY PROCEDURES
OSHA General Duty Clause:
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 12 | 52
Hazardous conditions not covered by a specific OSHA standard, may be cited in accordance with the
General Duty Clause, Section 5(a)(1) of the Occupational Safety and Health Act of 1970, which states: “Each
employer shall furnish to each of his employees employment and a place of employment which are free
from recognized hazards that are causing or are likely to cause death or serious physical harm to his
employees.
General Inspections and Training.
Contractors must establish a site safety inspection program that provides for the regular inspection of the
work site, equipment, and materials to insure they are hazard free. Contractors shall insure all employees
are educated and trained in recognition and avoidance of unsafe conditions and to the regulations and
procedures that pertain to specific activity that is part of the task. The use of any tool, machinery, or
equipment, which is not in compliance with standards and regulations, is prohibited. Contractors shall have
a COVID-19 action plan, to include appropriate PPE and procedures, established and may be required to
provide UT a copy upn request.
a. Medical Services and First Aid
1) In the event of a serious or life-threatening emergency, call 911.
2) In any area where hazardous chemicals are being used, employees shall be provided access to
facilities for quick drenching or flushing of the eyes and body.
b. Hand and Power Tools.
1) Electric power operated tools shall be either approved double insulated, or be properly grounded,
and used with ground fault circuit interrupters where applicable.
2) Only authorized and properly trained employees shall use power tools.
3) Power actuated tools may be operated only by certified individuals. Employees must always
maintain a copy of their certification on site .
4) Hand tools shall be inspected prior to each use for wear and damage.
c. Personal Protective Equipment.
1) Appropriate personal protective equipment must be worn in all operations where there is an
exposure to hazardous conditions or atmospheres.
2) Eye and face protection, in accordance with ANSI Z87.1-1991, shall be provided when machines or
operations present a danger to the eyes or face. Employees involved in welding operations shall be
furnished with filter lenses or plates of at least the proper shade number.
3) Employees exposed to laser beams must be furnished with the proper laser goggles and must
demonstrate proficiency with laser safety.
4) Head protection, in accordance with ANSI Z89.1, shall be in work areas where there is a possible
danger of head injuries from impact, falling or flying objects, or electrical shock and burns.
5) Hearing protection shall be instituted when noise levels exceed those established in accordance
with Table D-2 in OSHA standard 29 CFR 1926.52. Engineering controls shall be applied; however,
if they fail to lower the levels hearing protective devices shall be employed.
6) Hearing protection is required when a noise level is constantly above 85 decibels or impact noise
exceeds 140 decibels.
7) A hearing conservation program shall be required in all cases where the sound levels exceed the
values indicated in the standards.
d. Respiratory Protection.
1) When engineering and administrative controls are not effective in controlling toxic substances,
appropriate respiratory protective equipment will be provided and shall be used.
2) Only those respiratory protective devices approved by the National Institute for Occupational
Safety and Health and Mine Safety and Health Administration for a/the specific contaminant may
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 13 | 52
be used.
3) All employees using respiratory protective devices shall be properly trained in their use and fit-
tested. A written respiratory protection program is required by the contractor and shall be filed with
the Engineering Safety Manager prior to commencement of work tasks.
4) Exposures to toxic gases, vapors, mist, fumes, and dusts at a concentration above those specified
in the most recent “Threshold Limit Values (TLV) of the ACGH, shall be avoided.
5) Administrative controls, engineered practices, or use of respiratory protective equipment must be
used to achieve compliance with the TLV’s.
6) Random sampling of the air may be conducted to ensure compliance with this directive.
e. Electrical.
1) All electrical work shall be conducted in accordance with the current National Electrical Code (NEC)
standards. Only those persons qualified are permitted to work on or near energized conductors or
parts and then only under special procedures that insures proper employee protection. Contractors
will review arc flash protection in each situation requiring working on energized circuits with the
Facilities POC, or designee, prior to working on the live circuit.
2) Unqualified persons shall not be allowed to work within 10 feet of energized overhead power lines.
3) Equipment must not be used or stored within 10 feet of overhead-energized electrical power lines.
4) Extension cords shall be of the three wires, grounded variety. Worn and frayed cords are not
permitted.
5) Bulbs on temporary lights shall be equipped with a guard or deeply recessed in the reflector.
6) Each disconnecting means of motors and appliances and each service feeder or branch circuit at
the point where it originates shall be legibly marked to indicate its purpose, unless located and
arranged in a manner that the purpose is evident.
7) Cable passing through work areas shall be covered or elevated to protect it from damage and avoid
tripping hazard for employees.
8) Boxes for disconnecting means shall be securely and rigidly fastened to the surface, which they are
mounted and be fitted with covers.
9) All extension cords and cord-plug-connected equipment shall be protected by an assigned
equipment grounding conductor program.
10) No employer shall permit an employee to work in proximity to any part of an electric power circuit
that he may contact, unless the employee is protected against electric shock by de-energizing the
circuit and grounding it or by guarding it by effective insulation or other means.
11) In work areas where the actual location of underground utilities is not known, workers using
jackhammers, bars, or other hand tools that may come into contact with energized power lines,
must be provided with insulated protective gloves.
f. Fire Protection.
1) All hot work areas must have additional, portable fire protection prior to commencement of work.
2) Firefighting equipment shall be located in a conspicuous location within the work area.
3) At no time can firefighting or alarm initiating devices be blocked.
4) Fire extinguishers shall be placed every 75 feet in the work area.
5) All fires shall be reported immediately
g. Flammable and Combustible Liquids.
1) Flammable and combustible liquids shall be stored in approved containers and in appropriate
quantities for the job site use.
2) Where applicable, flammable liquid shall be dispensed through grounded and bonded containers.
3) Safety Data Sheets for all Flammable and Combustible liquids must be filed with the Facilities POC
along with applicable SDS weblink.
h. Welding, Cutting and Heating
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 14 | 52
1) All employees shall be instructed in the safe use of welding equipment prior to using this equipment.
2) Proper precautions (isolating welding and cutting, removing fire hazards from the vicinity,
providing a fire watch, etc.) for fire prevention shall be taken where welding or other “hot work” is
being done. No welding, cutting or heating shall be done where the application of flammable paints,
or the presence of any other flammable compounds, or heavy dust concentration creates a fire
hazard. Consider “Hot Work Permit” in occupied buildings.
3) Arc welding and cutting operations shall be shield by noncombustible or flameproof shields to
protect persons from direct arc rays. Visual barrier screens are required for arc welding operations.
4) When electrode holders are to be left unattended, electrodes shall be removed, and the holder shall
be placed or protected so that it cannot make electrical contact with employees or conducting
objects.
5) All arc welding and cutting cables shall be completely insulated and be capable of handling the
maximum current requirements for the job. There shall be no repairs or splices within 10 feet of the
electrode holder except where splices are insulated equal to the insulation of the cable. Defective
cables shall be repaired or replaced.
6) Fuel gas and oxygen hoses shall be easily distinguishable and shall not be interchangeable. Hoses
shall be inspected at the beginning of each shift and shall be repaired or replaced if defective.
7) General mechanical or local exhaust ventilation or airline respirators shall be provided, as required,
when welding, cutting to heating; zinc, lead, cadmium, mercury, or beryllium bearing materials in
enclosed spaces; stainless steel with inert-gas equipment in confined spaces; where an unusual
condition can cause an unsafe accumulation of contaminants.
8) Proper eye protective equipment shall be provided when appropriate.
i. Liquefied Petroleum Gas (LPG).
1) Storage of LP Gas within buildings is prohibited.
2) Each system shall have containers, valves, connectors, manifold valve assemblies, and regulators
or an approved type.
3) All cylinders shall meet DOT specifications.
4) Every container and vaporizer shall be provided with one or more approved safety relief valves or
devices.
5) Containers shall be placed upright on firm foundations or otherwise firmly secured.
6) Portable heaters shall be equipped with an approved automatic device to shut off the flow of gas in
the event of flame failure.
7) Storage locations shall have at least one approved portable fire extinguisher, rated not less than
20-BC.
j. Housekeeping.
1) Form and scrap lumber with protruding nails and all other debris shall be kept clear from all work
areas.
2) Combustible scrap and debris shall be removed at regular intervals, and no less than daily.
3) Containers shall be provided for collection and separation of all refuse. Covers shall be provided on
containers used for flammable or harmful substances.
4) Wastes shall be disposed of at frequent intervals.
5) Lay down areas shall be orderly and free from tripping hazards.
k. Storage.
1) All materials stored in tiers shall be secured to prevent sliding, falling, or collapse.
2) Aisles and passageways shall be kept clear and in good repair.
3) Storage of materials shall not obstruct exits.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 15 | 52
4) Materials shall be stored with due regard to their fire characteristics.
l. Ladders.
1) The use of ladders with broken or missing rungs or steps, broken or split side rails or with other
faulty or defective construction is prohibited. When ladders with such defects are discovered they
shall immediately be withdrawn from service.
2) Portable ladders shall be placed on a substantial base at a 4 to1 pitch, have clear access at top and
bottom, extend a minimum of 36 inches above the landing, or where not practical, be provided with
grab fails and be secured against movement while in use.
3) Portable metal ladders shall not be used for electrical work or where they may contact electrical
conductors.
4) Job-made ladders shall be constructed for their intended use. Cleats shall be inset into side rails ½
inch, or filler blocks used. Cleats shall be uniformly spaced, 12 inches, top-to-top.
5) Except where either permanent or temporary stairways or suitable ramps or runways are provided,
ladders shall be used to give safe access to all elevations.
6) All users of ladders shall be properly trained and documented by the Contractor.
7) Ladders shall be inspected periodically by the Contractor.
m. Flag Person/ Traffic Control.
1) When signs, signals and barricades do not provide necessary protection on or adjacent to a highway
or street, flag persons or other appropriate traffic controls shall be provided.
2) Flag persons shall be provided with and shall wear a red or orange warning garment while flagging.
3) Warning garments worn at night shall be of reflective material
n. Motor Vehicles and Mechanized Equipment.
1) Observe posted speed limits, give pedestrians the right of way, and yield to emergency vehicles.
Unless otherwise posted, there is a campus-wide speed limit of 15 miles per hours.
2) All vehicles in use shall be checked at the beginning of each shift to assure that all parts, equipment,
and accessories that affect safe operation are in proper operating condition and free from defects.
All defects will be corrected before the vehicle is placed in service.
3) No person shall use any motor vehicle, earth moving or compacting equipment having an
obstructed view to the rear unless; the vehicle has a reverse signal alarm distinguishable from the
surrounding noise level or the vehicle is backed up only when an observer signals that it is safe to
do so.
4) Heavy machinery, equipment, or pasts thereof which are suspended or held aloft shall be
substantially blocked to prevent falling or shifting before employees are permitted to work under
or between them.
5) Park only in areas approved for contractor use.
o. Railings.
1) A standard railing used to protect personnel from falls shall consist of top rail, intermediate trail,
toe board, and posts, and have a vertical height of approximately 42 inches from upper surface of
top rail to the floor, platform, etc.
2) The top rail of a railing shall be smooth surfaced, with a strength to withstand at least 200 pounds.
The intermediate rail shall be approximately halfway between the top rail and floor.
3) A stair railing shall be of construction similar to a standard railing, but the vertical height shall be
not more than 34 inches, or less than 30 inches from upper surface of top rail to surface of tread in
line with face or riser at forward edge of tread.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 16 | 52
p. Scaffolds.
1) Scaffolds shall be erected on sound, rigid footing, capable of carrying the maximum intended load
without settling or displacement.
2) Scaffolds and their components shall be capable of supporting, without failure, at least 4 times the
maximum intended load.
3) Guardrails and toe boards shall be installed on all open sides and ends of platforms more than 10
feet above the ground or floor, except needle beam scaffolds and floats.
4) Scaffolds 4 feet to 10 feet in height, having a minimum dimension in either direction of less than 45
inches, shall have standard guardrails installed on all open sides and ends of platform.
5) There shall be a screen with maximum ½ inch openings between the toe board and the guardrail,
where the persons are required to work or pass under the scaffold.
6) All planking shall be Scaffold Grade or equivalent. The maximum permissible span for one 1/4 x 9
inch or wider plank or full thickness is 4 feet, with medium loading of 50 p.s.i.
7) Scaffolding planking shall be overlapped a minimum of 12 inches or secured from movement.
8) Scaffold planks shall extend over their end supports not less than 6 inches or more than 12 inches.
9) All scaffolding and accessories shall have any defective parts immediately replaced or repaired.
10) An access ladder or equivalent safe access shall be provided.
q. Air Tools and Compressed Air.
1) Pneumatic power tools shall be secured to the hose or whip in a positive manner to prevent
accidental disconnection.
2) Safety clips or retainers shall be securely installed and maintained on pneumatic impact tools to
prevent attachments from being accidentally expelled.
3) The manufacturer’s safe operating pressure for all fittings shall not be exceeded.
4) All hoses exceeding ½-inch inside diameter shall have a safety device at the source of supply or
branch line to reduce pressure in case of hose failure.
5) Compressed air used for cleaning purposes shall not exceed 30 psi.
6) Compressed air for cleaning will only be used with effective chip guarding and personal protective
equipment. This requirement does not apply to concrete form, mill scale, and similar cleaning
operations.
r. Compressed Gas Cylinders.
1) Valve protection caps shall be in place when compressed gas cylinders are transported, moved, or
stored.
2) Cylinder valves shall be closed when work is finished and when cylinders are empty or moved.
3) Compressed gas cylinders shall be secured in an upright position at all times, except if necessary,
for short periods of time when cylinders are actually being hoisted or carried.
4) Cylinders shall be kept at safe distances or shielded from welding or cutting operations.
5) Cylinders shall be placed where they cannot become part of an electrical circuit.
6) Oxygen and fuel gas regulators shall be in proper working order while in use.
7) Applicable technical portions of American National Standards Institute, Z49.1, Safety Welding and
Cutting, shall be followed.
8) Large gas cylinders should only be transported using an appropriate incline cart designed for this
purpose, with the cylinder secured in the cart.
9) The contents of a gas cylinder shall be treated as a chemical. As such, all chemical policies apply to
gas cylinders.
s. Hoists and Cranes.
1) Comply with the manufacturer’s specifications and limitations for hoists.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 17 | 52
2) Rated load capacities, recommended operating speeds, and special hazard warnings or instructions
shall be posted on cars and platforms.
3) Never move suspended loads directly over personnel.
4) Area surrounding the operation of the crane shall be marked with caution tape to prevent
unauthorized staff from entering the prescribed safety area
5) A Hoist and Crane Safety Plan shall be at the job site and available for review upon request by
University Facilities and Safety personnel.
t. Accident Record Keeping and Reporting Requirements.
Within 8 hours after its occurrence, an accident which is fatal to one or more employees or which results
in the hospitalization of three or more employees shall be reported by the employer to the nearest
OSHA Area Director at:
OSHA Area Director
(813) 626-1177
Reference: https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=12783.
PROJECT MANAGEMENT GUIDELINES
PURPOSE:
Provides the guidelines for maintaining quality, safety, and aesthetics during repairs, construction and
renovation projects.
SCOPE:
All maintenance, repairs, construction and renovation projects throughout the facility.
Projects require a great deal of planning and supervision to ensure the standards are upheld. Facilities
managers play a major role in this process and the successful completion of the projects.
Active preparation and continuous surveillance of safety conditions is a critical component of project
management. The following should be observed:
1. Keep job sites safe and clean at all times. Contractors shall perform a daily clean-up of their site.
This includes trash removal, screen or silt fence maintenance.
2. Keep emergency and handicap accesses open.
3. Contractor shall follow the Fire Impairment Request requirements if any life safety building features are
impaired (see Appendix E). DO NOT call Facilities the day of to take buildings off-line.
4. When Life Safety or egress is inhibited by project work, an Intermittent Life Safety Plan shall be
developed and approved by Facilities Safety Manager and Campus Safety.
5. Utility outages shall be coordinated with University of Tampa Facilities by submitting the Fire/Utility
Outage Request form (Appendix E). All outages (electric, Fire, PW, Chilled Water, storm, sanitary,
irrigation) shall be coordinated with the appropriate University personnel, at the very minimum, Angie
Jordan, Facilities Maintenance Manager.
6. All buildings/rooms should be left secure when work is complete. If you are the last contractor leaving
the site, ensure the site is secure.
Decisions related to aesthetics are normally made well in advance of project start date. They require a focus on
details, outcomes, and university environment/culture as well as:
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 18 | 52
1. Standardize new material and equipment with that currently being used along with specifications
contained in the facilities specification manual and standard color template (where available). UT has
various standardized requirements, coordinate with UT Facilities Point of Contact (POC) to confirm if a
standard exists.
QUALITY AND COMPLIANCE
1. Check the progress of the project often, per predetermined progress and quality inspection (and spot
checks) intervals, to ensure quality of work and adherence to specifications.
2. Invoice Procedures:
a. Please submit invoices upon completion of work and in a timely manner.
b. Vendors must submit detailed invoices which clearly identify the services, portion of services,
items and expenses for which compensation is sought.
c. The University’s standard payment terms is Net 30.
d. The University prefers to pay via ACH (Automated Clearing House)/EFT (Electronic Funds
Transfer; Appendix H)). To receive payments via ACH/EFT, please complete the University’s
ACH Enrollment form which can be obtained from your University contact.
MINIMUM CONTRACTOR’S REQUIREMENTS
PURPOSE:
Provides the minimum requirements expected of contractors prior to, during, and after maintenance,
construction and renovation projects.
SCOPE:
All maintenance, construction and renovation projects throughout the organization.
PERSONNEL SCREENING
The following requirements are to be met by Contractors’ and their subcontractors and vendors while
engaged in construction and maintenance projects at the University of Tampa:
A. A criminal history check shall be performed on all jobsite personnel, including subcontractors and
temporary day laborers, at least once every two years. Prior to personnel entering the Project site, an
initial criminal history background check shall be submitted to and performed by a private company
trained to perform private employment screening. The results of each criminal history check shall be
reported to the Contractor, which shall screen the results for the following disqualifying offenses to
determine a person’s eligibility to work on the University of Tampa’s campus.
1. Drug distribution activity or felony drug possession
2. Sexual offenses, including, but not limited to, indecent exposure and voyeurism
3. Crimes of violence involving physical injury to another person
4. Murder
5. Kidnapping
6. Felony theft
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 19 | 52
B. The following searches shall be performed to document types of convictions listed above that will
render an individual ineligible to perform work on campus:
1. SSN Trace plus address history
2. Sexual Offender database check
3. National Criminal Database search
4. 7-year County Court Check in the employee’s County of residence
C. Contractor shall certify that all personnel have been subject to a criminal background check and shall
continuously track, monitor, and re-certify throughout construction as new trades and personnel
begin work.
D. The cost of the criminal background check shall be borne by the Contractor but is compensable as a
General Conditions expense.
Before work is started - Before beginning a maintenance, construction or renovation project, contractors
will comply with the following requirements:
1. Review all plans, drawings and project specifications as may have been issued. These project documents
include any established infection control measures and/or interim life safety measures as may be required.
2. Within that contract document a description of all project turnover documents that will be owed to the owner
upon the completion of the project.
3. Instructions for cleaning and maintenance of all materials installed.
4. Secure all permits, fees, and licenses necessary for the execution of the work.
5. Furnish all insurance certificates (e.g., Liability Workers’ Compensation) and the attached Contractor
Information Record to the facility’s responsible department.
6. Complete Maintenance pre-construction form (Appendix I) for applicable projects.
Arrange for the delivery of supplies, materials, and equipment to the work site or designated storage areas.
Deliveries must be made during regular working hours 8:00 am 4:00 pm. The Facility, under no circumstances,
accepts responsibility for receiving, unloading, or storing these items.
Material and equipment submittals shall be provided to the Facilities POC to be approved for all installed
products and equipment prior to being ordered. All materials submitted must meet design specification as
required on construction documents, at a minimum all components are to meet current industry standards, UL
approved and meet all local, state, and federal requirements for flame spread and smoke density.
Submit Safety Data Sheets (SDS) to the Facilities POC for any chemical, toxic or hazardous substance (whether
pure or as an ingredient of a mixture) brought into the facility.
During Work - While performing any maintenance, construction or renovation project, contractors will comply
with the - following requirements:
1. Comply with applicable safety regulations of the city, state, and federal codes.
2. All contractors required by state and local requirements to be licensed shall be licensed. Evidence of
individual licensure shall be carried at all times and if asked, shown to the Facilities Department
Managers and/or local building officials as may be required. Contractors using unlicensed personnel are
subject to having their contract revoked.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 20 | 52
3. Deviations from contracted work shall have written approval from POC or other Facilities
representative.
4. Ensure that contractor employees physically check in/check out with Facilities Management and do not
enter facility buildings other than the work site and approved areas. When required, contractors shall
provide their own water closets and lavatories. Unless permitted, contractors SHALL NOT enter
residential floors. Unless specifically requested by Facilities personnel, contractors shall not enter
residential rooms prior to 9:00 AM. Contractors should not enter when the room is occupied unless
Facilities and the occupant has specifically requested to perform the work.
5. Comply with Campus Safety Rules and personnel at all times.
6. Keep the premises free from accumulation of waste materials or rubbish caused by project operations.
7. Any work involving the building roof shall be completely watertight at all times. If roofing work is in
progress, temporary measures shall be taken to ensure it is watertight before leaving the site at the end
of the shift. The applicable respective contractor will be on call 24x7 to respond to any roof leaks during
this time period.
Upon completion of work - Once the maintenance, construction or renovation project is completed, the
contractor will comply with the following requirements:
1. Remove all materials and rubbish from and about the project away from facility property, including
tools, construction equipment, machinery, and surplus materials. Exceptions: Hazardous Waste shall
follow the stipulations under Environmental Control of this Manual.
2. Completion of punch list items is required for substantial completion
3. Facilitating owner occupancy
4. Assembling record drawings for as-built documentation (if required)
5. Warranty, guaranty, and operation and maintenance manuals
6. Pursuing resolution of warranty items
7. Documentation of final pay quantities and costs
8. Preparing contract files for transfer to owner
9. Final payment and contract acceptance
10. Leave the work area in a clean, satisfactory condition.
11. Provide facility with all close out materials as required by the contract.
12. Sanitation: Contractors will use special care in keeping work sites free from debris and food wrappers.
Contractors will provide covered trash containers and are responsible for the sanitary collection and
daily removal of the trash in these containers from the facility grounds.
13. Replacement Stock: For future replacement stock, contractors may be required to provide attic stock
materials. Review with Facilities POC.
14. Final Billing and Punch List Completion Project billing may be withheld until all punch list items
have been completed and as-built, operating, and repair manuals on all equipment systems, hard
and electronic copies, have been delivered to Facilities.
15. Complete post-construction form (Appendix I) for applicable projects.
NOTE: Contract terms will have the authority to reject work which does not conform to the contract documents.
Fire Prevention - Contractors are responsible for fire prevention on the job site and will comply with
requirements indicated in Construction / Renovation Planning and Construction / Renovation Safety.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 21 | 52
Motor Vehicle and Parking Regulations - All persons driving motor vehicles on the facility premises in
connection with contractor business, including employees in their personal vehicles, will abide by the official
facility motor vehicle and parking regulations as a condition of being permitted to enter the premises and as a
part of the contract requirements. Each Contractor/Vendor vehicle shall have the appropriate parking pass to
be issued by Facilities Management. Also refer to Appendix G regarding Contractor/Vendor golf cart/low speed
vehicle use on campus.
Parking - Employees of contractors are not permitted to park in gated Faculty/Staff parking areas of the
University except as approved by Facilities (parking passes will be given out by Facilities). See below for
additional information on approved areas of parking.
Truck Routes - Contractors and sub-contractors will use only designated truck routes for the delivery of
material and other contract operations. Designation of such truck routes shall be required and approved before
the start of construction. Contractors are responsible for notifying all suppliers to make deliveries by the
designated routes and for posting approved signs where necessary.
1. Vehicle Debris - Vehicles operated on facility property in connection with contract work will be loaded
in such a manner as to minimize spillage of dirt, gravel, and other debris. Contractors will remove
inadvertent spillage of nails, construction materials, and/or scrap immediately. Dirt and gravel spillage
or accumulations will be removed as soon as possible, but in every case, they must be removed no later
than the end of each workday. Where dust becomes a problem to facility operations, the contractor is
required to keep the area controlled by sprinkling or other methods approved by FDEP.
2. Accidents - Any vehicular accident on the facility premises must be reported to Campus Security as
soon as possible in person or by telephone. The driver(s) of the vehicle(s) involved will remain on the
premises until released and will furnish required reports of the accident. Campus Security will assist in
determining if TPD has jurisdiction.
OUTSIDE CONTRACTOR/VENDOR ORIENTATION
PURPOSE:
Provides orientation to contractors/vendors of required procedures and expectations for performing work in
respect to safety and client satisfaction.
SCOPE:
All primary contractors and subcontractors competing for and/or performing project work at the University of
Tampa.
1. The Contractor / Vendor Manual emphasizes the responsibility of the contractors/vendors to assure that all
contractor/vendor and subcontractor staff are oriented and trained in proper procedures to mitigate risks
associated with safety and minimize disruptions to University students and employees.
2. A copy of the Contractor / Vendor Manual is presented and reviewed with the primary contractor/vendor at
the semi-Annual Contractor orientation.
3. The primary contractor/vendor is expected to indicate any subcontractors used.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 22 | 52
4. The primary contractor/vendor is also expected to acknowledge receipt of the manual and take
responsibility to assure all contractor/vendor and subcontractor employees will be oriented and trained
according to the contents of the manual. SIGNED RECEIPT OF MANUAL IS DUE TO FACILITIES IN
PERSON OR BY EMAIL (faciloffice@ut.edu) BY Dec. 4, 2020.) Refusal to submit will be followed up by
Facilities personnel and possible dismissal from work on campus.
CAMPUS PARKING FOR CONTRACTORS
A contractor parking pass permit can be obtained from the Facilities Management office. Your company name
and contact phone number MUST be placed on the hang tag. The contact number is in case we need to alert
you to relocate your car or if something has happened. Do not park around any building except to unload
supplies (minimize unloading time). If truck is required to be at a certain location, then Campus Safety is to be
made aware (coordinate with your Facilities POC). NO PERSONAL vehicles are to be used for this purpose.
Facilities Personnel (Project Managers, Supervisors) are not obligated to waive ticket fees. Contractors (or
personnel identified with a particular company or project) will be notified of unpaid tickets.
There is limited parking available for Major Construction projects contact Facilities POC or your
Primary GC for approved locations. Approved locations are all WEST of the railroad tracks.
Contractors/Vendors may park only on the top floor of the West Garage; parking on other floors must
be approved by Campus Safety and/or Facilities POC.
During the school year, contractors are no longer permitted to park in the grass and gravel lots between
Edison Ave. and Delaware Ave.
Contractor parking is NOT permitted on any of the paved parking areas unless approved by the
Facilities Project Manager (PM).
These locations are also applicable for Contractor LSV/Golf Carts.
Park at own risk and lock all valuables.
Never park in Handicap designated spots, avoid blocking handicap ramps when unloading vehicle.
Never park in fire lane without Facilities approval.
Never park on Poe Pkwy unless it is coordinated, and work must be done in Vaughn Center. This is a
FIRE LANE and the City will issue tickets.
Never block a loading dock.
Bollards are all locked. If you need a bollard removed, contact your Facilities POC. Campus Safety is
not obligated to unlock bollards for contractors.
Contractors are not to park on the PH fountain circle unless landscaping.
Be aware of City owned streets around campus (A Street, Edison, Delaware), cars may be ticketed or
towed at Owner’s expense.
Parking along railroad tracks at Cass is not encouraged. Vehicles may be towed at their own expense.
This property is owned by CSX, The University of Tampa is not responsible for any vehicles parked in
this area.
Vehicles WILL BE TOWED when blocking fire lane access or impeding traffic through campus.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 23 | 52
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 24 | 52
ENVIRONMENTAL CONTROLS
CHEMICAL HAZARD COMMUNICATION
UT Chemical and Hazardous Waste Policies, Procedures and Best Practices
Mission
As part of pursuing its mission as an institution of higher learning, certain UT faculty, staff,
students, contracts, and visitors procure, import, sore, and use chemicals and generate
hazardous waste. All such persons shall take professional responsibility for working to create as
safe an environment as possible for themselves and others, in settings in which they are working
and/or directing others, where chemical/hazardous wastes are used, so as to minimize the
likelihood of an accident.
All the aforementioned persona shall follow applicable federal, state, and local regulations, as
well as University policies and procedures regarding chemical usage and the proper storage and
disposal of hazardous waste generated on University property. Toward this end, the University
provides resources that include the Chemical Environmental Health and Safety Coordinator and
the Chemical Hygiene budget, the chemical safety website and an annual training session that
is open to all these individuals to attend.
Vision
Working to create as safe an environment as possible is a shared responsibility, but individuals
are ultimately responsible for their actions and choices. University personnel who serve in
leadership capacities will draw upon their professional training and expertise to train, to the best
of their ability, those who work under their guidance. Outside training resources will be
employed, as necessary, to facilitate efforts to provide sound chemical safety practices. The
University will continually strive to foster a processional climate where its people embrace
pursuing, and learning whenever necessary, best practices regarding the safe use of chemical
and procedures for the generation/storage/disposal of hazardous wastes.
Values
1. The University values educating its employees in the proper handling of chemicals and
hazardous wastes and will make yearly training available to its employees who use and
generate these materials;
2. The University values faculty, staff, and contractors knowing how to respond to chemical
emergencies on University property in order to best ensure their personal safety and the
safety of others. First, attend to your and others personal safety and do not hesitate to
call 911 if you believe it is necessary. Second, contact UT security to notify them on an
accident or emergency involving c\chemicals and ask them to contact Dr. Steve Kucera;
3. The University values learning from unforeseen circumstances and/or human error that
cause an accident and pursing preventative measures and education, whenever such
instances occur, in order to reduce the likelihood of a recurrent event.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 25 | 52
4. The University values and expects full and open disclosure of all activities related to
chemical use and hazardous waste generation and disposal. Fraudulent actions in any
situation or emergency involving chemicals and/or hazardous waste, will not be tolerated.
This University and its employees’ will always cooperate with local, state, and/or/federal
authorities visiting the institution to inspect for compliance with regulations and/or to
investigate an accident.
For specific information, details and procedures regarding Chemical and Environmental Safety
on University of Tampa campus, please visit: http://utweb.ut.edu/chemicalsafety/
If there are injuries due to a Chemical Safety event, call 911 first. All chemical emergencies
shall be reported to Campus Safety 257-7777, no exceptions. Campus Safety will then alert
the appropriate departments and individuals, including Dr. Steve Kucera (UT Chemical
Environmental Health and Safety Coordinator).
Specific Chemical and Environmental topics that are required for Contractors to know:
Painting Quick Tips v3.0 ----- Consejos Rapidos de Pintura v3.0 ---- Paint Waste Disposal
Policy v 5.0 ---- Plaster Trap Change-outs v1.0
Contractor Generated Hazardous Waste Expectations ---- Contractor and Facilities
Hazardous Waste Info v5.0
Facilities General Waste Disposal v2.0 ----- Universal Waste Management ---- Universal
Waste Definition
Should an incident occur while on campus, refer to the Form in Appendix F which will be
required to be filled out.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 26 | 52
DISPOSAL OF PAINTS AND OTHER PRODUCTS USED ON SITE
Painters must not release paint, thinners and other liquids into the stormwater drains. This water is not
treated to remove litter, debris and other pollution before it reaches waterways. Paints, thinners and
pain stripper will cause major environmental problems if they get into the stormwater system. These
highly toxic materials can kill aquatic animals and plants and ruin the habitat.
All paints and hazardous products shall be properly disposed of as required by the City of Tampa and the
Florida Department of Environmental Protection. The University of Tampa will not accept or handle any
waste on behalf of a contractor.
For additional information, contact Facilities.
EROSION AND SEDIMENT CONTROL
The appropriate environmental controls shall be inherited in all construction related activity.
Uncontrolled stormwater runoff from construction sites can significantly impact rivers, lakes, and
estuaries. Sediment in waterbodies from construction sites can reduce the amount of sunlight reaching
aquatic plants, clog fish gills, smother aquatic habitat and spawning areas, and impede navigation.
As part of the City of Tampa Phase II municipal separate storm sewer systems (MS4s), the University of
Tampa is required to develop a program to reduce pollutants in stormwater runoff to the MS4 for
construction sites disturbing one or more acres. This primarily includes developing:
An ordinance,
Requirements to implement erosion and sediment control best management practices (BMPs),
Requirements to control other waste at the construction site,
Procedures for reviewing construction site plans,
Procedures to receive and consider information submitted by the public, and
Procedures for inspections and enforcement of stormwater requirements at construction sites.
Contractors must follow City of Tampa Chapter 21 Stormwater Management
(https://www.municode.com/library/fl/tampa/codes/code_of_ordinances?nodeId=COOR_CH21STMA
)
In addition to the stormwater requirements that Phase II MS4s place on construction sites, construction
operators may also need to apply for NPDES permit coverage, generally if their project disturbs more
than 1 acre and discharges to a waterbody.
For more information regarding BMPs, please visit:
http://www.epa.gov/npdes/national-menu-best-
management-practices-bmps-stormwater#edu
When required, a NPDES permit shall be required on all projects over 5 acres (contact Mills and
Associations for further information). For projects smaller, a NPDES waiver should be applied:
http://www.epa.gov/npdes/stormwater-discharges-construction-activities#waivers.
It is strongly suggested that contractors providing exterior and utility work at the University have at least
one certified Florida Stormwater, Erosion and Sedimentation control certified employee. Training is free
and upcoming workshops are provided at: http://www.dep.state.fl.us/water/nonpoint/erosion.htm
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 27 | 52
The Florida Stormwater, Erosion, and Sedimentation Control Inspector Training &
Certification Program
The Water Quality Restoration Program is currently implementing the Florida Stormwater, Erosion,
and Sedimentation Control Inspector Qualification Certificate Course. The goal of
this educational program is to better educate the inspector on proper Best
Management Practice (BMP) sections, how to layer those BMPs, how to correctly
install, inspection, and maintenance (BMPs) for use during and after construction
to minimize impacts caused by uncontrolled erosion and sedimentation on the
construction site. Likewise, the course will help develop a better knowledge of how
to properly manage the impacts from solids (TSS), turbidity (NTUs), and nutrients
(i.e., nitrogen and phosphorus) and other surface water contaminates. Florida’s
stormwater program is technology based, using performance standards and BMP
design criteria. The use of innovative techniques and specifically designed erosion control systems are
encouraged in order to prevent or limit erosion and sedimentation problems during and after land
disturbance and construction activities.
The program curriculum was originally developed, and the training program began in late 1997. To
date, there are over 35,000 qualified inspectors throughout the state of Florida through our educational
program. FDEP approved instructors voluntarily teach the inspector training class throughout the year.
This allows the instructors flexibility to arrange classes around their schedules.
The objectives of this training and certification program are:
To assure that the desired benefits of stormwater management systems are being achieved.
To assure that both the public and private sectors have enough inspectors trained in the proper
installation and maintenance of BMPs during and after construction.
To assure a consistent level of technical expertise and professional conduct for all individuals
responsible for inspecting erosion and sediment controls, and stormwater management
systems.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 28 | 52
APPENDIX
Appendix A: Contractor Acknowledgement and Compliance statement Form
Appendix B: Certificate of Insurance Required
Appendix C: Permit to Work
Appendix D: Job Hazard Analysis (JHA) and Take 5 Dynamic Risk Assessment
Appendix E: Utility Outage - life safety impairment request Form (Planned Outages)
Appendix F: Chemical Incident Form
Appendix G: Contractor/vendor golf carts and low speed vehicles
Appendix H: Automated Clearing House form
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 29 | 52
APPENDIX A: CONTRACTOR ACKNOWLEDGEMENT AND COMPLIANCE STATEMENT
FORM
By signing below the official representative of the company named below verifies that he/she has
received the University of Tampa Facilities Outside Contractor/Vendor Safety Orientation Manual. The
undersigned also verifies that he/she has read and understands the content of this document and will
ensure that his/her company, its employees, and any/all subcontractors hired by the general contractor
will comply will all provisions contained herein. The undersigned also verifies that he/she understands
that any violation of the guidelines, policies and procedures or regulatory compliance standards may
result in restriction or prohibited access to University of Tampa Facilities and property.
1. The contractor will:
a. Provide Liability and Workers Compensation certificates to the Facilities Director,
Maintenance Manager and/or Construction Manager.
b. Submit the Contractor Information Record to the Facilities Director, Maintenance Manager
Construction Manager.
c. Secure all necessary permits, fees, and licenses.
d. Submit copies of bonds as may be required.
e. Submit Safety Data Sheets (SDS) to the Facilities Director, Maintenance Manager
Construction Manager for any toxic or hazardous substance brought into the facility,
whether the substance is a pure substance or an ingredient of a mixture.
2. During Construction the contractor will:
a. Follow all safety procedures as provided in Minimum Contractor Requirements and the
Outside Contractor / Vendor Orientation Guide.
b. Arrange for the delivery, receiving, unloading, and storing of supplies.
c. Ensure contractor personnel comply with the orders of uniformed and other healthcare
facility personnel.
d. Use special care in keeping work sites free from debris and food wrappers.
e. Store and use all flammable liquids and/or gases in accordance with applicable state and
local safety codes.
f. Maintain responsibility for fire prevention on the job site.
g. Ensure contractor personnel abide by the official facility motor vehicle and parking
regulations.
3. After Construction the contractor will leave the work area in a clean and satisfactory condition
subject to the approval of the Facilities Design and Construction Manager AND/OR Facilities
Director, Maintenance Manager.
4. Contractor / Vendor representative is required to Complete Form on the next page.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 30 | 52
I understand and agree to comply with the provisions of the Contractor’s Compliance Statement outlined
above:
Vendor/General Contractor Company Name
________________________________________
Vendor Company Authorized Representative:
______________________________ ___________________________
Name (Print or Type) Signature
Date Signed: ___________________________
______________________________ ___________________________
Title Business telephone number
List of all subcontractors to be used (if applicable) and contact person (Attach additional page if necessary):
Subcontractor Company Authorized Representative:
______________________________ _________________________
Name (Print or Type) Signature
______________________________ _________________________
Name of Subcontractor Co. Date Signed
___________________________________ _________________________
Title Business telephone number
Subcontractor Company Authorized Representative:
______________________________ _________________________
Name (Print or Type) Signature
______________________________ _________________________
Name of Subcontractor Co. Date Signed
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 31 | 52
___________________________________ _________________________
Title Business telephone number
Subcontractor Company Authorized Representative:
______________________________ _________________________
Name (Print or Type) Signature
______________________________ _________________________
Name of Subcontractor Co. Date Signed
___________________________________ _________________________
Title Business telephone number
List all additional Subcontractors, contact information accordingly.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 32 | 52
APPENDIX B: CERTIFICATE OF INSURANCE REQUIRED
Please email all certificates of insurance to
CertificatesOfInsurance@ut.edu and include
the type of contract the University has with the Vendor
A $1m Commercial General Liability Insurance is required for all projects. Confirm with your
POC any alterations or adjustments to this value along with any other insurance requirements.
The University of Tampa, 401 W Kennedy Blvd, Tampa, FL 33606 must be the Certificate Holder
with the additional insured endorsement of “The University of Tampa and its employees,
officers and agents are additional insureds on the above listed insurance policies, excepting
the workers' compensation policy”.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 33 | 52
APPENDIX C: PERMIT TO WORK
Please note when filling out this form please use the tab and arrow keys to move between the relevant fields. Ensure you do not use
the return or enter keys. If completing this form by hand, please use BLOCK CAPITALS and black ink.
All sections must be completed, and the certificate singed to confirm that all control measures are in place before commencing work.
1. Description of Work
Location (provide exact details) Details of plant, equipment or area Asset No.
Describe the work to be undertaken and the reason for the work
Between Date: Time: and Date: Time:
2. Precautions
Take 5 Risk Assessment Reference:
Job Hazard Analysis (JHA) Identification:
A Risk Assessment must be carried out for the proposed work stated in Section 1, and the attached detailed written Job Hazard
Analysis (JHA) has been produced to clearly show the measures taken to eliminate or control the risks based on the risk assessment.
The JHA Ref. No has been included above and the Permit number noted above written on the JHA to formally link the Permit and JHA
in case they become detached.
3. Permits / Safe Work Practices Required
Permit Type Job Applicability (Y/N)
Zero Energy State Isolation
Live Electrical Work (50 V 600 V Only)
Hot Work
Working at Height (Scaffolding, Suspended Work Platforms, Roof Work)
Permit Required Confined Space Entry
Non-Routine Lifting Operations
Excavation (Dig Safe)
Task Specific Safe Work Procedures Required Job Applicability (Y/N)
Working in Laboratories
Asbestos Operations (Class III / Class IV Only)
Handling Radioactive Materials & Explosives
Fire Protection Impairment
Breaking Containment of Flammables or Hazardous Materials
Working Near Unguarded Moving Machinery
Working Near or Over Deep Water
Overhead Cranes & Personnel Lifts
High Pressure Systems Testing & Line Breaking
Hazardous Waste Operations
Working Near High Voltage
Any Other High-Risk Operation (see Risk Assessment & JHA)
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 34 | 52
4. Authorization (to be completed by Authorized Person)
I have reviewed the risk assessment and supporting JHA submitted for the tasks described in Section 1. I am satisfied
that all the necessary precautions are in place to effectively manage the risks, and hereby authorize work to proceed. I
will ensure that work is carried out in accordance with the agreed work plan until the remaining parts of this Permit (6 and
7) have been formally completed to complete or cancel the work.
Company
Name:
Name and
Signature:
Date
:
Time
:
5. Acceptance (to be completed by person completing the work)
I confirm all hazards have been identified and the precautions described in the JHA are in place and will be fully and
effectively implemented throughout the duration of the work. The Permit will be kept at the worksite along with the JHA
and all those involved will be properly instructed on how they should implement these precautions. I will stop the work if
anything changes which affects the Permit conditions or supporting arrangements and raise the issue immediately with the
Authorized Person to seek clarification before recommencing the work.
Company
Name:
Name and
Signature:
Date
:
Time
:
6. Clearance (to be completed by person completing the work. Check only one of the following statements)
Work is now complete, and the area made safe and
all personnel under my control have been instructed
to cease work and not to re-enter the area.
Any associated isolation can now be removed
Work is incomplete but the area has been made safe
and all personnel under my control have been
instructed to cease work and not to re-enter the area
until a further permit has been issued
Isolation must remain in place
Company
Name:
Name and
Signature:
Date
:
Time
:
7. Cancellation (to be completed by Authorized Person. Check only one of the following statements)
Work is now complete, and I am satisfied that the
activities have ceased, and the work site is safe and
therefore cancel this permit.
I will arrange for any corresponding isolation to
be removed by completing the certificate detailed
in Section 3 above.
Work is incomplete but I am satisfied that the
activities have ceased, and the work site is safe and
therefore cancel this permit.
However, isolation will remain in place and
therefore the certificate specified in Section 3
above will remain valid.
Company
Name:
Name and
Signature:
Date
:
Time
:
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 35 | 52
APPENDIX D: JOB HAZARD ANALYSIS & TAKE 5 DYNAMIC RISK ASSESSMENT
JOB HAZARD ANALYSIS (J.H.A.) WORKSHEET
INSTRUCTIONS: Complete each section in its entirety. Any questions regarding all topics, definitions, and
controls shall be directed to the Regional Safety Manager. ALWAYS REMEMBER THE FOLLOWING:
Empower each person to understand that they have the right and responsibility to stop any unsafe work activity
without consequence!
Ensure that Incident reports are available to everyone to document any behaviors or conditions relevant to the
task at hand.
Report all incidents and injuries to the Sodexo claims reporting Hotline at (888) 872-5676
JHA Identification:
WORK PLAN-
Complete the following section in order to understand the work task to be performed and
its basic requirements.
DESCRIPTION OF WORK TO BE
PERFORMED:
WORK LOCATION:
DATE & TIME / DURATION
SUPERVISOR(S):
SKILL / LABOR / CERTIFICATIONS
REQUIRED:
TOOLS & EQUIPMENT
REQUIREMENTS:
CHEMICAL OR MSDS
REQUIREMENTS:
TRAINING REQUIREMENTS:
SODEXO SAFETY PROCEDURE
REFERENCE(S) / AVAILABLE:
PRE-WORK HAZARD ASSESSMENT- Identify each hazard that could cause injury or incident when the task is performed. (check all that
apply)
HAZARDOUS CHEMICAL
EXPOSURE
BIOLOGICAL EXPOSURE PHYSICAL EXPOSURE UTILITIES
SITE SECURITY /
WORKPLACE VIOLENCE
CONVEYOR BELTS
ENVIRONMENTAL
EXPOSURE
FLAMMABLE /
COMBUSTIBLE
INSECTS / ANIMALS /
PLANTS
NOISE MACHINERY / GUARDING
HIGH PRESSURE
WASHERS
SLIPPERY SURFACES
HAZARDOUS
WASTE
COLLECTION
CORROSIVE /
OXIDIZER / REACTIVE
/ TOXIC
MOLD / FUNGUS
HEAT / COLD -
TEMPERATURE
POWERED INDUSTRIAL
VEHICLES
HAND / POWER TOOLS
PERSONNEL
TRANSFERS
HAZARDOUS
WASTE SHIPMENT
/ DISPOSAL
INHALATION / EYES &
SKIN
VIRAL / BACTERIAL INCLEMENT WEATHER
MANUAL MATERIAL
HANDLING
LOW ILLUMINATION PROJECTILES / DUST
UNIVERSAL
WASTE
PESTICIDES
RADIOLOGICAL
EXPOSURE
HOT WORK / WELDING /
CUTTING / BURNING
LADDERS /
SCAFFOLDING / AERIAL
LIFTS
CATCH / PINCH / STRIKE
POINTS
ERGONOMIC EXPOUSRE
PHARMACEUTICAL
WASTE
ASBESTOS / LEAD /
CARCINOGENS
NON IONIZING
RADIATION (UV,
SUNLIGHT)
CONFINED SPACES
HIGH TEMP MATERIALS /
SURFACES
ELECTRICITY (110 V OR
LESS)
REPETITIVE MOTION
SPILLS /
DISCHARGES
PAINT
IONIZING RADIATION
(GAMMA, X-RAY)
STORED HAZARDOUS
ENERGY - LOTO
COMPRESSED GASES /
HAZMAT STORGAE
ELECTRICITY (110 V OR
MORE)
BODY STRAIN /
POSITIONING
OTHER:
OTHER: OTHER:
FALLS FROM HEIGHTS /
SAME LEVEL
TRAFFIC / DRIVING GFCI REQUIRED PUSHING / PULLING OTHER:
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 36 | 52
REQUIRED SAFETY EQUIPMENT AND CONTROLS- Identify the appropriate measures taken to reduce or eliminate the risk of injury or incident when
performing the task. (check all that apply)
ENGINEERING CONTROLS ADMINISTRATIVE CONTROLS
MATERIAL SAFETY DATA
SHEETS (MSDS)
PPE HARD HAT
ELECTRICAL INSULATED
FOOTWEAR
CONTINGENCY
PLANNING
GUARD RAILS QUALIFIED FOR TASK
HAZARD WARNING
SIGNS
FILTERING FACEPEICE
RESPIRATOR-DUST
MASK
EAR PLUGS BOOT COVERS
EMERGENCY /
EVACUATION
PLANS
MACHINE GUARDS
TRAINED / CERTIFIED
FOR TASK
FIRE WATCH
ELASTOMETRIC
FACEPEICE
EARMUFFS CUT-RESISTANT GLOVES
EYEWASH /
SHOWER
SOUND BARRIERS /
BAFFLES
WORK PLAN
PROPER TOOLS /
EQUIPMENT
FR RATED CLOTHING
SAFETY GLASSES
W/SIDE SHIELDS
MATERIAL-HANDLING
GLOVES
FIRST AID KIT /
AED
ENCLOSURE / ISOLATION HOT WORK PERMIT COMMUNICATIONS
TYVEK OR SRARNEX
COVERALLS
CHEMICAL GOGGLES NITRILE GLOVES
FIRE
EXTINGUISHERS
FIRE EXTINGUISHERS /
SYSTEMS
CONFINED SPACE
ENTRY PERMIT
PROPER LIFTING
TECHNIQUES
CHEMICAL APRON FACE SHIELD
FOOD HANDLING
GLOVES
SPILL
CONTAINMENT
GFCI / EQUIPMENT
GROUNDING
LOCKOUT / TAGOUT TRAINING PROGRAM
WELDING SHIELD / MASK
& LEATHERS
STEEL-TOE BOOTS
PERSONAL FALL ARREST
SYSTEM
SEVERE
WEATHER
SHELTER
ANTI SKID / ERGONOMIC
MATTING
EQUIPMENT INSPECTION
SHEETS
OTHER: SUNBLOCK / SUNHAT SLIP-RESISTANT SHOES
ARC-FLASH PROTECTION
KIT
PANDEMIC PLAN
JOB SAFETY ANALYSIS- COMPLETE THIS SECTION IN ORDER TO IDENTIFY EACH ACTIVITY, ITS HAZARDS,
CONTROLS AND PERSON ACCOUNTABLE FOR ENSURING SAFE ACTIVITIES.
SEQUENCE OF ACTIVITIES 1 POTENTIAL HAZARD(S) 2 RECOMMENDED SAFE
PROCEDURE(S) 3
ACCOUNTABLE
PARTY(IES) 4
1
Sequence of Activities: Tasks required to complete work
2
Potential Hazards: Inhalation, eye injury, trauma, foot injury, hand injury, head protection, fire, electrical shock, etc.
3
Recommended Safe Procedures: Procedures required to complete work safely
4
Accountable Party(ies): Person(s) responsible for supervising & completing work safely
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 37 | 52
ACKNOWLEDGEMENT / CONCURRENCE: All personnel engaged in the assigned job activity shall acknowledge that a JHA
meeting has been conducted, its objectives and plan clearly stated, and is understood.
NAME, SIGNATURE AND DATE NAME, SIGNATURE AND DATE
1. 9.
2. 10.
3. 11.
4. 12.
5. 13.
6. 14.
7. 15.
8. 16.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 38 | 52
Take 5 Dynamic Risk Assessment
Section 1
STOP
Task to be done: Date:
Task location:
YES NO N/A
BEFORE YOU START (click the appropriate box)
Are you at the correct location for the task?
Do you know the emergency evacuation procedure for the site?
Have you done this job before? Have you been trained?
Have you read the risk assessments associated with this activity?
Do you have all the right documentation for the task?
Do you have the correct tools and equipment?
Has all the equipment been tested and inspected?
Is there a safe means of access/clear working area?
Do you have the correct PPE for the task?
If you have answered no - state the action required in Section 4 & discuss with your line manager
Section 2
LOOK
Assessment - If you feel a hazard in association with the topics below is present - state yes or no. If yes, then state the action required in
Section 4 & discuss with your line manager
Manual handling, (lifting, pushing, carrying etc). Loading/unloading.
Tools/equipment/machinery. Hazardous materials.
Mobile equipment. Chemicals/fluids/oils.
Release of stored energy. Biological.
Electricity - high or low voltage. Dust & fumes.
Confined spaces. Asbestos.
Work at height. Noise/vibration.
Hazardous areas. (e.g. above water). Lighting.
Excavations/created openings. Environmental conditions.
Radiation. Weather.
Hot work. Fire.
Housekeeping. (before, during & after). Other (specify)
Contact with machinery/process. Other (specify)
Vehicles. Other (specify)
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 39 | 52
Section 4
THINK & ACT
Actions
Hazards & Stops
(ticked from Section 1 and 2)
Operational Control
/Precautions Needed
Remaining Risk
(Extreme, High,
Medium, Low)
Low = Proceed/Take Care Medium = Controls Needed High = Stop & Review Task
Extreme= STOP. Do not proceed, contact your line manage
Section 5 REVIEW
After the task
YES NO If you have
answered yes to
either question
state comments
and discuss with
line manager
The Hazard
will affect
(please circle)
The whole
site as
detailed
above
An individual area
within the site
(state)
An individual item/s of plant
(state)
Have any lessons
been learned for
next time?
Has the task/work
done created any
new hazards?
Details of corrective action numbers entered onto Salus by Line Manager
Has the client
been informed of
the hazards?
Employee Name: Sign: Date:
REMEMBER, it is only safe to start work when YOU are satisfied it is safe.
Section 3
HARMS/OSS
What could happen to me or others? (tick the appropriate box)
Slip same level. Contact with electricity.
Trip same level. Ingestion/absorption of hazardous substance.
Fall same level. PPE: not used, incorrect use, defective.
Slip on stairs/steps. Repetitive motion.
Trip on stairs/steps. Hand tool injury.
Fall on stairs/steps. Hit by / Struck against / Trapped / Crushed.
Fall from height/elevation. Caught in, between or under.
Manual handling / Lifting / Carrying / Pulling / Pushing. Exposure to noise.
Vehicle incident / accident. Exposure to low oxygen.
Inhalation of gasses / fumes / vapors. Exposure to sun.
Exposure to hot objects / surfaces / temperatures.
Exposure to radiation.
Exposure to cold objects / surfaces / temperatures. Drowning.
Exposure to fire. Other (specify).
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 40 | 52
APPENDIX E: UTILITY OUTAGE/LIFE SAFETY IMPAIRMENT REQUEST FORM (PLANNED OUTAGES)
If you are a Contractor or Project Manager and need to shut off a utility or request Fire Impairment in order to perform
work, you are required to submit a Utility Shutdown/FIR Request form. This form is routed to key University of Tampa
Operations, Facilities D&C and Maintenance (O&M) staff who will attempt to accommodate the requested dates. A new
date may be suggested, depending on the needs of the occupants. The appropriate Facilities staff member will contact
you to confirm details. In addition to this form, ALL WORK shall have Permit to Work documented (Appendix C).
The Facilities D&C or Maintenance/Operations Project Manager sends out general “Pre-Notification Notice” informing
Departments of upcoming planned interruption in services. Pre-Notification Notice includes suggested date, time frame
and general locating information. Departments are encouraged to respond if the suggested date and time does not work
for them. If the emailed request form is filled out, then a Distribution email will be sent to affected parties. The “Approver”
on the Request Form must be an assigned; typical Facilities Approvers are Lisa Brachna, Scott Gossen, Angie Jordan,
Jennifer Isenbeck, Steve Kim, Tony Fitch, Jason Foley or Jack Wise.
24-hours’ notice required for Fire Impairments (planned), should an emergency Fire Alarm Impairment request be needed,
contact an “Approver” by phone and they will phone/email in the request.
7-day notice required for planned utility shutdowns, includes server rooms, Academic and Residence Halls. If it an
emergency outage, the Facilities or Maintenance POC will provide all coordination and outage confirmation.
O&M receives utility shutdown form and meets with requesting contractor to confirm scope of work, extent of outage,
includes all investigation work to identify departments affected, this is often coordinated through the Facilities Design
and Construction POC.
Fire Impairment Requests (FIR)Facilities Administration staff will arrange calling the monitoring company to remove
the building from “Monitoring”. Should the System Alarm be taken off-line (Alarm silenced during Trouble or
Supervisory alert), the Approver shall only be Facilities GM or Maintenance Manager AND the panel shall have an
attendant monitoring should the building be occupied. The FIR Form should be detailed on the area of work being
performed. Prior to commencing work (FIR/Utility Outage) Jason Foley or a Maintenance Designee shall isolate fire alarm
devices at the panel to keep as much of the building “active” as possible. If the building has limited occupancy or
unoccupied, a Fire Watch shall be in place. Fire Watch shall also be provided when system is in “Test” when the building
is unoccupied, or contractors are only working in limited areas. Refer to Fire Watch Procedures. The Fire Impairment
Request Form shall be submitted to the Facilities POC (Approver) first. Do not assume your request is approved until
either signed or acknowledged via email. Faciloffice @ut.edu will send out the official notice to University Departments.
Contractors shall not send out these confirmations.
Utility Outage Requests:
Facilities sends out “Official Notice” via Campus Global Message, Signage and Postings will be applied if required (e.g.:
Boil Water Notices, No Occupancy Power Outage).
Facilities and optional subcontractors will meet occupants who have expressed concerns or who may need support, ex.
Generator, extension cords, backup power, cooling, etc. Facilities POC and required contractors will perform a Job
Hazard Analysis (JHA), document any potential issues and provide supplemental contingency plans as required.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 41 | 52
Facilities D&C and/or O&M will determine who shuts down utility. Example: turns off the chilled water supply & return
valves and drains the lines, isolate a building transformer.
Facilities returns the utility back to normal operating conditions and confirms functionality throughout the building.
Example: fills the chilled waterlines, opens the valves, checks the automation system, returns the building to operations.
If outage exceeds time identified in “Official Notice” contractor must contact the Facilities POC who will send notice to
required parties (Campus Safety, UTCIO, and Residence Life) via phone or email to building occupants requesting
extension, with expected new duration. If there are potential issues, Action Plans shall be discussed, documented and
reviewed by required parties to enact contingencies. Appropriate University approvals will need to take effect (VP
Operations, VP Finance and Administration, Provost, VP Student Affairs, CIO, President, etc.).
The Project Manager will coordinate with the appropriate Operations and Maintenance staff, including supporting
subcontractors if required (A&A Electrical, Technology, JCI (Simplex Grinnell), etc.) to provide support for request. Any
required fees/costs will be reviewed with the Requestor and UT staff.
NOTE: Shutdown dates requested are subject to change pending availability and University Operations.
ACTIVATION OF FALSE ALARM: In efforts to maintain business continuity, any activation of a False Alarm (such as Fire
Alarm) will result in a documented Root Cause Analysis review. Respective parties, regardless of fault will be asked to be
involved so that expectations are set, and lessons learned can be reviewed.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 42 | 52
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 42 | 52
Fi
re
Impairm
ent
I Ut
ili
ty Outage
Re
quest
This re
qu
est is to ensure the
sa
fety, o
pe
rations a
nd
c
ont
inui
ty
of
se
rv
ic
es
at
th
e
University. All re
.q
uests must inclu
de
re
qu
ired in
fo
rmation. A
ll
re
.q
uests should be
submi
tt
ed with 7
da
ys
ad
va
nc
e notice. Sho
rte
r
du
rations wi
ll
be reviewed u
po
n a ca
se
by ca
se
bas
is. Fire Alarm System I
mpa
irme
nts
sha
.11
have at l
east
24
h
ou
r
not
i
c.e
.
Regue.st Details:
Re
quest or's Name:
______________
Re
quest
Da
t e:
___________
_
Re
quest
or
Con
ta
ct
#:
_____________
Re
que
sto
r Email:
__________
_
Re
quest
or
Co
mpa
ny/D
epanm ent:
_______________________
_
Date request ed f
or
ou
t
age
:
__________
Con
tr
a
ct
or P
OC
during
ou
t age:
__________
_
T
yp
e
of
I
mp
airment (check all
th
at apply}:
--
Fire Ala
rm
Syste
m/
F
S/
FW
Ele
ctr
ic
P
ota
ble Water
Chilled Wat er
Natural
Gas
__
Data/Technolog
y/C
able
__
Other (
li
st
)
Note a
.II
non-
Un
ive
rs
i
ty
of
Tampa
ut
ility re
qu
ests
mu
st
be
t
hr
ough the a
pp
ropriate
ag
ency. The
Un
iversity of Tampa and
a
ff
e
cte
d per
so
nn
el sha
ll
be n
ot
i
fi
ed of prop
os
ed outage re
qu
ests to
th
e
Ci
ty, TECO/Peopl
es
G
as
, Brigh
t
hou
se
, etc.
Co
ntr
actor sha
ll
con
tact
Jason Foley or call Fa
ci
l
it
ies 8
13
-253-6227 to
co
nfirm that
sp
ecified fire alarm d evices have b
ee
n
taken offline prior to
co
mm
encing
.
w
ort
. f
ac
il
e
ffi
ce
@
III
edu
will
co
nt
act
the Mo nitoring Service to remove monitoring
{
mu
st have 24-hrs. not
ic
e}. For ongoing projec
ts
, FIR must be updat ed every 30 days. Occupied
bu
ildings sha
ll
have fire
alarm
se
rv
ic
es
returned back to
se
rv
i
ce
every
da
y when
co
ntra
cto
rs are not working.
Building(s) A
ff
ected:
All Fl
oo
rs (?):
___________________
Lis
t Fl
oo
rs if limited: _
_______
_
Re
as
on for requ
es
t ed outage (co
ns
tr
u
ct
ion, repa
ir
, etc.}:
___________________
_
Duration (be sp
ec
ific; list day,
ho
ur
s,
and approx. time frame}:
________________
_
Is Fire Watch req
uir
ed?:
_______________
If ye
s,
is Fire Watch
to
be provided by
Con
tr
a
ct
or or Univers
ity
of Tampa?
Has acco
mm
odations been made for inte
ri
m l
if
e
sa
f ety me
asu
r
es
? If
so
, please descr
ib
e:
UT Facil
iti
es
M anager who appr
ov
ed request:
_______________________
_
(
Th
is must be a Design &
Co
nstruction Man
ag
er, Fa
ci
lities Operations Manager o r Su
pe
rv
i
so
r - Maint enance,
Grounds,
En
ergy or designated indivi
du
al).
Fo
r
Un
i
ve
rsity
app
r
ov
er: All utility out
ag
es sha
ll
be c
oo
rdinat ed wit h a
ppr
opriate
de
partme
nt
s for permi
ss
i
on
and
coo
rdination. A
ll
power out
ag
es sha
.11
inclu
de
In
fo
rmation T
ec
hn
ology and S
ec
urity (utcio@ut.
e.du
) and Campus
Safety. Global com
mun
ic
ation sha
ll
be
s
ubm
it
te
d to al
ert
campus
co
mmunity when appr
op
riate in a timely ma
nn
er.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 43 | 52
APPENDIX F: CHEMICAL INCIDENT REPORTING FORM
Please complete all information as applicable to the incident
Name of Injured
Employee/Student/Visitor:
Social Security Number or
Student/Employee ID:
Date of Birth:
Home Address: Date & Time of Accident:
Location of Incident (please be specific):
Nature of Injury
Describe Affected Body Parts: Phase of Workday at time of injury
First Aid: During Break
Sent to Student Health Center Performing Work Duties
Outside Emergency Care Working Overtime
Fatality Entering or Leaving Work
Other
Department:
Manager: Job Title:
Course Name:
Instructor:
Treating First Responder:
Treating Physician Treating Emergency Facility
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 44 | 52
Names of Witnesses:
To Be Completed by Employee/Student/Visitor
Personal Account of How Incident Occurred:
Signature Telephone: Date
Witness Account of Incident
Witness Signature Date
Manager/Instructor Account of Incident
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 45 | 52
Manager/Instructor Signature Date
Supervisor at Time of Accident: Directly Supervised Indirectly Supervised
Not Supervised Supervision Not Feasible
Corrective Actions
CASUAL FACTORS, EVENTS & CONDITIONS THAT CONTRIBUTED TO THE ACCIDENT:
Corrective Actions: Those that have been or will be taken to prevent recurrence:
Date Due:
Environmental Health & Safety Department
Approved by: Title: Date
Case Number:
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 46 | 52
APPENDIX G: CONTRACTOR/VENDOR GOLF CARTS AND LOW SPEED VEHICLES
Golf Cart and Low Speed Vehicle Safety RulesUT Contractors/Vendors
Low Speed Vehicle is defined as:
Low-speed vehicles may be operated within Campus limits where the posted speed limit is 35 miles per
hour or less, as permitted by and under the conditions established in F.S. Section 316.2122. Pursuant to F.S.
Section 316.2122(1), this does not prohibit a low-speed vehicle from crossing a road or street at an
intersection where the road or street has a posted speed limit more than 35 miles per hour. When not on
campus AND on City of Tampa/FDOT roads, these vehicles shall obey all rules incorporated for Low Speed
Vehicles by the City of Tampa.
According to the requirements set forth in F.S. Section 316.2122, a low-speed vehicle must be equipped
with headlamps, stop lamps, turn signal lamps, reflex reflectors, parking brakes, rearview mirrors,
windshields, seat belts and vehicle identification numbers. A low-speed vehicle must be registered and
insured in accordance with F.S. Section 320.02.
All vehicles shall be marked with contractor’s name or logo. Contractor is responsible for all hazards,
maintenance and with their own personal vehicle. Damage to campus property by a Contractor owned golf
cart/LSV will be charged back to the contractor. It will be at the University’s discretion on how damages are
repaired.
All Golf carts/LSV shall be registered with Facilities Office. Golf carts not reported to and approved by Facilities
contact may be subject to citations from Campus Safety.
Golf carts/LSV shall be equipped with a functional horn, lights and have required hazard sign (triangle on back).
Operators of golf carts which are not equipped with turn signals shall use appropriate hand signals.
Golf carts and low-speed vehicles shall comply with all local and state traffic laws and may be cited for traffic
violations in the same manner as other vehicles. Note LSV shall not exceed 20 mph when driving on Campus.
Enforcement of infractions of this Section shall be as provided in Chapter 316, Florida Statues, as may be amended.
At its option the City or Campus Safety may also issue notices of violation and process those violations through its
code enforcement procedures.
All accidents involving golf carts shall be reported to Campus Safety immediately. Then call Facilities at 253-6227.
Each operator shall be responsible to provide timely notification of safety and maintenance concerns regarding
carts to Facilities or University Staff member in which the golf cart was loaned.
Golf carts/LSV shall be operated in accordance with the following specific rules:
Golf carts/LSV do not have right of way. Always give way to cars and pedestrians.
Golf carts shall not be parked within 6-8 feet of the entrance or exit of any building, except at loading docks.
Golf carts should travel on campus streets when possible; avoid sidewalks and grass areas if possible. Care
shall be taken to park LSV so as not to cause a nuisance to pedestrian or bicycles. Shall not be parked so as to
cause damage to grounds.
Operators shall stop golf carts/LSV at all blind intersections and corners and look both ways before
proceeding, sound horn if necessary. Carts/LSV shall stop at ALL stop signs.
Golf carts/LSV shall not be parked in any manner likely to obstruct or interfere with the flow of pedestrian or
vehicular traffic in any area. Be aware of potential for ADA clearances or required traffic patterns.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 47 | 52
Golf carts/LSV shall not enter into pedestrian only areas, such as DALY plaza and the Chapel area, which have
ornamental pavers. Golf carts/LSV shall not be taken on the track or athletic fields unless SPECIFICALLY
requested by athletic coaches or appointed staff.
Operators shall not stop (bring golf cart to rest for any period of time) in the middle of roads and walkways.
Special care shall be taken while driving golf carts/LSV through parking lots and on walkways. Golf carts shall
not be operated at speeds in excess of 12.5 miles per hour in these areas. LSV shall not be operated at speeds
in excess of 20 miles per hour.
Approved parking locations for golf carts/LSV shall be approved by the Maintenance Manager, Angela
Jordan. If a power supply is required, then a monthly fee may be applied for infrastructure and consumption.
_______________________________ _________________
Signature Date
________________________________
Company
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 48 | 52
Golf Cart / Low Speed Vehicle Registration
for use on The University of Tampa Campus Only
This registration is to ensure the safety of faculty, students, staff and guests at the University.
Failure to comply by University Golf Cart/LSV rules will result in restriction of vehicle use and may
affect selection of services to be provided. ALL GOLF CARTS AND LOW SPEED VEHICLES
UTILIZED BY FACILITIES CONTRACTED VENDORS SHALL BE REGISTERED AT TB 200.
Enforcement of infractions on Campus and off campus property shall be as provided in Chapter 316, Florida Statues, and its current
amendments. At its option the City or Campus Safety may also issue notices of violation and process those violations through its
code enforcement procedures. The contractor is solely responsible for their vehicle. Damage to campus property caused by vehicle
will be assessed and charged accordingly.
Registration Details:
Registrant’s Name: ______________________________ Request Date: ___________________________
Registrant Contact #: ____________________________ Registrant Email: ________________________
Company:_____________________________________________________________________________
Type of Vehicle: _________________________________ Color: _________________________________
Model/Serial # (if available): _______________________
Duration (time vehicle will be on campus): ___________________________________________________
Registration can be obtained for ONE YEAR max.
Return this form to Theresa Pietro, Facilities TB 200
Decal Assigned: ________________________________________________________________________
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 49 | 52
APPENDIX H: AUTOMATED CLEARING HOUSE FORM
ACH ENROLLMENT/CHANGE AUTHORIZATION FORM
In order to allow sufficient time for processing your first payment, complete this form and fax it immediately to 813-
258-7211 or mail it to The University of Tampa - Attn: Pur. Box 25F 401 W. Kennedy Blvd Tampa, FL 33606.
COMPANY hereby authorizes The University of Tampa ("UT") to initiate ACH credit entries to the listed account at the
Depository named below. COMPANY shall comply with and be bound by the rules, as in effect from time to time (the
"Rules") of the National Automated Clearing House Association ("NACHA"). This authorization is to remain in effect until 30
days after UT has received written notification of a change or termination sent via United States certified mail, return receipt
requested, to The University of Tampa - Attn: Pur. Box 25F, 401 W. Kennedy Blvd Tampa, FL 33606
NAME OF COMPANY
:
BY
:
(Authorized signature)
TITLE
:
DATE
: / /
Company:
-Name and address must be exactly as it appears on your W9 Form filed with University of Tampa
-PRINT legiblyyour printed writing must be capable of being read to avoid delay in processing
Company Name
Address
City State Zip Code
Contact Name
Telephone Number
Email address to receive Remittance notice
DEPOSITORY FINANCIAL INSTITUTION:
Bank Name
Bank Address
City State Zip Code
Transit/ABA Routing Number (B)
Bank Account Number (C)
Name on Bank Account
File format (check only one) CCD CTX
To make sure that COMPANY account is properly credited, attached is a
VOIDED
check or a
BANK LETTER
from the COMPANY's bank
noting the ABA and Account Number of the account where COMPANY payments will be deposited. Please attach the required
documentation write the word “
VOID
” on check and tape it over the sample below. This must remain a one-page document for accuracy
of processing. (Forms will not be processed without a
VOIDED
check or above mentioned
BANK LETTER
to verify the account number.)
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 50 | 52
No. 2476
XYZ Company
20
- Sample Check-
1-2/218
808
PAY TO THE
ORDER OF :
$
DOLLARS
The ABC Bank, NA
1 Plaza, New York, N.Y. 10020
1-800-555-5555
:_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
(A) Check # (B) Transit/ABA No. (C) Account No.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 51 | 52
Appendix I: Pre/Post Construction Form
APPENDIX I: PRE-POST PROJECT REQUIREMENTS
UNIVERSITY OF TAMPA, FACILITIES MANAGEMENT
PRE-PROJECT REQUIREMENT LIST
DOCUMENT REC'D: Y, N, N/A Completion Date
1 Proposal - to include complete Scope of Work
2 Contractor Documents: Certificate of Insurance (per project), W-9, and
Automated Clearing House (ACH) form when applicable.
3 Request applicable Purchase Order and/or Project Number
4 List of Sub-Contractors and Project Managers - to include name, phone
number, and e-mail.
5 Define Schedule of Project
6 Defined Schedule of Payment: scheduled value of payments, retention of 5%
for completion, and ensure PO/PJ # are included.
7 Executed UT FM Contractor/Vendor Safety Manual
8
Letter certifying a criminal history check was conducted with applicable reporting.
9 Completed Permit to Work (if applicable)
10 Completed FIR/Utility Outage request (if applicable)
11 M.O.T. documentation: D.O.T., City of Tampa, 811-documents.
12 811 considerations
13 Set pre-construction/pre-project meeting
14 Special Considerations - Grounds, Housekeeping, Maintenance, and/or Set-
Ups.
All documents have been received and saved in the project file: Date: By:
This pre-project requirement list is to identify the minimum requirements for all projects occurring at the University of Tampa. All
documents shall be required prior to commencement of the project.
The University of Tampa, Facilities
Contractor/Vendor Manual, School Year 2020-2021
Page 52 | 52
UNIVERSITY OF TAMPA, FACILITIES MANAGEMENT
POST-PROJECT REQUIREMENT LIST
DOCUMENT REC'D: Y, N, N/A Completion Date
1 Contractor/Vendor created punch list
2 Follow up with Facilities for edit/amendments of final punch list
3 Provide all equipment owner & operator manuals
4 Provide schedule for specialized transitional training.
5 Provide requested drawings, to include: as builts, shop drawings, and/or
6 All NEW SYSTEMS shall require documents to provide updates of the system
to update drawings and provide training to current employees.
7 Provide required color charts, finish charts, floor plans/graphics, control
updates and any other information to assist in future maintenance.
8 Provide all applicable OEM & Cut Sheets related to the project.
9
Provide final invoice for payment with appropriate PO# or PJ#
10 General housekeeping of work site: removal of trash, debris, unused
All documents have been received and saved in the project file: Date: By: