TOWN of MILTON, VT | DEVELOPMENT REVIEW APPLICATION
If you have any questions, call (802)893-1186 or visit us in the Milton Municipal Complex at 43 Bombardier Road, Milton, VT 05468
Town of Milton, VT | Development Review Application | Last Revised October 10, 2017
Page 1 of 2
FINAL SUBDIVISION FORM, UDR 340 & 440
Final Plan Checklist
Check here to verify that the proposal conforms to the layout shown on the sketch plan or preliminary plat plus any
recommendations made by the DRB in its decision
Check here to verify that you understand final approval by the DRB shall not be deemed to constitute or be evidence of
an acceptance by the Town of any street, easement, utility, park, recreational area or open space shown on the final plat.
Such acceptance may only be accomplished by formal resolution of the Legislative Body.
Check each box below to verify that your final plat drawing includes the following:
The Final Subdivision Plat shall consist of one or more sheets of drawings prepared by a license surveyor which
conform to the following requirements:
The size of the sheets shall be either 18 inches x 24 inches or a multiple thereof.
Such sheets shall have a margin of one (1) inch outside the border along three sides and of one and one-half (1-1/2) inch
on the binder side.
Space shall be reserved thereon for endorsement by all appropriate agencies.
THISFINALPLATHASBEENAPPROVEDBYRESOLUTIONOFTHEDEVELOPMENTREVIEWBOARDOFTHETOWNOFMILTON,VERMONT,
THIS______DAYOF______________________,20__,SUBJECTTOTHEREQUIREMENTSANDCONDITIONSOFSAIDRESOLUTION.
SIGNEDTHIS______DAYOF_________________,20__,
The final plat for a major subdivision shall conform in all respects to the preliminary or sketch plat as approved by the
DRB. The subdivision plat shall show:
Proposed subdivision name or identifying title, the name of the Municipality, the name and address of the record
owner and subdivider, the name, license number and seal of the licensed land surveyor, the boundaries of subdivision
and its general location in relation to existing streets or other landmarks and scale, date and true north point.
Street names, as approved by the DRB, and lines pedestrian ways, lots, reservation, easements and areas to be
dedicated to public use.
Sufficient data acceptable to the DRB to determine readily the location, bearing and length of every street line, lot line,
boundary line, and to reproduce such lines upon the ground. When practicable these should be tied to reference points
previously established by a public authority.
The length of all straight lines, the deflection angles, radii, length of curves and central angles of all curves, tangent
distances and tangent bearings for each street.
By proper designation on such Plat, all public open space for which offers of cession are made by the subdivider and
those spaces title to which is reserved by him.
Lots within the subdivision numbered in alternating order within the blocks.
The location of all the improvements referred to in Article VIII and in addition thereto the location of all fire protection
devices, utility poles, sewage disposal systems, and rough grading and other devices and methods of draining the area
within the subdivision.
Permanent reference monuments and lot corner markers shall be clearly indicated.
Monuments shall be set at all corners and angle points of the boundaries of the subdivision, and for new roads at all
street intersections, angle points in street lines, points of curve and such intermediate points as shall be required by the
DRB.
Deed reference, tax map reference.
Check each box below to verify that you have attached the following:
Copies of the proposed deeds, agreements or other documents showing the manner in which streets, open space,
including park and recreational areas served and maintained and a certificate from the Legislative Body or Town
Attorney that these documents are satisfactory. Such certificate shall not be construed, however, as acceptance by the
Town of Milton of any areas proposed to be dedicated to the Town.
Your preferred form of performance bond (if applicable) to secure completion of any improvements and their
maintenance for a period of two (2) years.
Any other documents required by the DRB as a result of sketch/preliminary plat approval.