C4
1"=10'
TOWN OF JACKSON, WY
440 W KELLY CONDOS
LOT 3&4 BLK 6 KARNS ADDN
440 W KELLY AVENUE
NEW UG POWER
~50-LF
0 10 20
9.9' SETBACK
5.79
~2%
6206
10.1' SETBACK
20.2' SETBACK
20.1' SETBACK
EXIST POWER
POLE & OH UTILS
TO REMAIN
TIE NEW SANITARY
SEWER SERVICE
INTO MAIN W/NEW
MANHOLE
5.0'
CONC
SIDEWALK
(TYP)
NEW 6"
SANITARY
SEWER SERVICE
~45-LF
TEMP STOCKPILE AREA
W KELLY AVE
LANDSCAPED LAWN
TEMP STOCKPILE AREA
EXIST C&G
TO REMAIN
REPLACE ~
28-LF EXIST
C&G W/NEW
PED RAMP
REPLACE ~
24-LF EXIST
C&G W/NEW
DRIVEWAY
APRON
20.0' DRIVE AISLE
REPLACE ~
32-LF EXIST
C&G W/NEW
PED RAMP
RAISED PLANTER BOX
CONC PATIO
RAISED PLANTER BOX
CONC PATIO
TEMP STOCKPILE AREA
TEMP STOCKPILE AREA
STORAGE ROOM
MECH ROOM
GROUND FLOOR UNIT
GARBAGE AREA
GROUND LEVEL
PARKING AREA
5,915-SQFT ASPHALT
LANDSCAPED LAWN
LANDSCAPED LAWN
LANDSCAPED LAWN
LANDSCAPED LAWN
INSTALL ~
1020-SQFT NEW
CONCRETE
SIDEWALKS
INSTALL ~
1020-SQFT NEW
CONCRETE
SIDEWALKS
MATCH
TBC
6206
6.60
TBC
5.65
FL
6.15
6.65
FL
6.85
TBC
MATCH
7.70
TBC
7.85
TBC
MATCH
6208.68
TBC
6.16
TBC
7.15
6208.06
6207.72
6206.81
6207
6208
6208
6207
6206.65
6207.67
6205.35
6204.79
6206.16
6208.77
6.40
6.05
8.00
7.50
7.60
7.60
7.25
7.80
7.30
FL
7.90
6.25
8.90
8.00
8.00
8.50
8.50
8.50
8.50
8.00
8.50
8.50
8.50
8.50
~3.75%
~2%
~2%
LANDSCAPE
WALL ~ 2-FT
TALL (PRECAST
CONCRETE
BLOCK 5'X2'X2')
~6.0
~6.0
ELEVATION NOTES
1. FINISHED FLOOR BLDG = 100'-0" 6208.50'
2. FINISHED FLOOR GARAGE = 99'-6” 6208.00'
(NORTH EDGE, THEN SLOPE 1% TO SOUTH EDGE)
SILT FENCE DETAIL
X
X
X
X
X
X
X
X
X
SF
X
SF
SF
SF
X
X
X
X
X
X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
SF
X
X
X
X
X
X
X
X X
X
X
X
X X X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X X X
X
X
X
ROOF
DOWNSPOUT
(TYP)
ROOF
DOWNSPOUT
(TYP)
8.50
GENERAL NOTES:
1. REFER TO GEOTECHNICAL INVESTIGATION REPORT BY SCG, 8/13/2020, FOR EARTHWORK RELATED
RECOMMENDATIONS AND SPECIFICATIONS.
2. INSTALL CONSTRUCTION FENCING AROUND PERIMETER OF PROPERTY WITH ACCESS GATE(S) IN ACCORDANCE
WITH APPROVED CONSTRUCTION MANAGEMENT PLAN.
3. EROSION CONTROL MEASURE TO INCLUDE PERIMETER SILT FENCE OR STRAW WADDLES . SILT FENCE/STRAW
WADDLES, NOT SHOWN FOR CLARITY, SHALL ENCOMPASS ENTIRE PERIMETER OF LIMITS OF DISTURBANCE.
CONTRACTOR RESPONSIBLE FOR MAINTENANCE OF SILT FENCE AND THE TIMELY REMOVAL OF SEDIMENTS AND
MATERIAL THAT MAY TRANSPORT BEYOND THE LIMITS OF DISTURBANCE. CONTRACTOR TO CONDUCT AND
DOCUMENT MONITORING AND INSPECTIONS IN ACCORDANCE WITH THE GENERAL PERMIT.
4. REFER TO CONSTRUCTION MANAGEMENT PLAN (BY OTHERS) FOR THE LOCATIONS OF MATERIAL AND
EQUIPMENT STORAGE AND SOIL STOCKPILE LOCATIONS. CONSTRUCTION EQUIPMENT PARKING AREAS AND
TEMPORARY TOPSOIL/DIRT STOCKPILE AREAS WILL VARY WITHIN THE LIMITS OF DISTURBANCE (PROPERTY
BOUNDARIES) AND BASED UPON PHASED CONSTRUCTION SCHEDULE AND SEQUENCING. IN ALL CASES,
MATERIAL WILL EITHER BE REMOVED FROM THE SITE OR THE STOCKPILE LOCATIONS WILL BE WITHIN THE
PROPERTY.
5. AREA OF DISTURBANCE WITHIN PROPERTY BOUNDARY = 0.31-ACRE
6. CONCRETE WASHOUT IN AREAS WITHIN THE PROPERTY BOUNDARY, RECOMMENDED WITHIN PARKING AREA,
WHERE DISCHARGE DOES NOT REACH PUBLIC RIGHT-OF-WAY AND STORM SEWER SYSTEMS.
7. CONTRACTOR SHALL MEET WYDEQ NPDES REQUIREMENTS FOR SMALL CONSTRUCTION ACTIVITIES.
8. SCG MUST INSPECT AND CERTIFY FINAL GRADING CONFIGURATION PRIOR TO FINAL TOJ INSPECTION.
RECLAMATION SPECIFICATIONS:
1. MINIMAL SITE GRADING PROPOSED DUE TO RELATIVELY FLAT LOT.
2. ALL DISTURBED AREAS WILL BE LANDSCAPED WITH SOD, TREES, SHRUBS AND IRRRIGATED.
3. SURFACE PREPARATION
3.1. TOPSOIL SHALL BE UNIFORMLY SPREAD ON PREPARED SURFACES PRIOR TO SOD PLACEMENT. HARD
PACKED OR CAKED TOPSOIL SHALL BE SCARIFIED PRIOR TO PLACEMENT.
4. FINAL SURFACE STABILIZATION
4.1. STORMWATER SHEET RUNOFF DETENTION STABILIZATION AND SOIL PROTECTION WILL BE PROVIDED BY
SOD.
4.2. INSTALL PERMANENT IRRIGATION SYSTEMS TO MAINTAIN GROWTH.
5. WEED & PEST MANAGEMENT STRATEGIES
5.1. CONTRACTOR TO COMPLY WITH THESE LAND DEVELOPMENT REGULATIONS:
5.1.1. WYOMING SEED LAW
5.1.2. WYOMING NURSERY STOCK LAW
5.1.3. INVASIVE SPECIES MANAGEMENT
5.2. PRE-CONSTRUCTION PLAN (BY CONTRACTOR):
5.2.1. CONTACT TETON COUNTY WEED & PEST TO PREPARE AN INVASIVE SPECIES MANAGEMENT PLAN.
5.2.2. IF CONSTRUCTION BEGINS PRIOR TO THE GROWING SEASON, KNOWN INFESTATIONS WILL BE
ADDRESSED UNDER THE ACTIVE CONSTRUCTION PHASE.
5.2.3. IF CONSTRUCTION BEGINS DURING THE GROWING SEASON, TREAT ALL KNOWN INFESTATIONS AT
LEAST TWO WEEKS PRIOR TO CONSTRUCTION.
5.3. ACTIVE CONSTRUCTION:
5.3.1. CLEAN ALL CONSTRUCTION EQUIPMENT PRIOR TO ENTERING THE SITE TO PREVENT INTRODUCING
INVASIVE SPECIES.
5.3.2. KEEP ALL AREAS OUTSIDE OF THE CONSTRUCTION ZONE UNDER ACTIVE MANAGEMENT.
5.3.3. ROUTINELY CHECK AND TREAT SOIL STOCKPILES FOR INVASIVE SPECIES.
5.3.4. MINIMIZE DISTURBANCE OF AREAS INFESTED WITH INVASIVE SPECIES AS POSSIBLE.
5.4. POST-CONSTRUCTION:
5.4.1. CONDUCT REVEGETATION IMMEDIATELY AFTER CONSTRUCTION IS COMPLETE TO PREVENT INVASIVE
SPECIES FROM ESTABLISHING IN DISTURBED AREAS.
5.4.2. USE DEALERS LICENSED BY THE WYOMING DEPARTMENT OF AGRICULTURE AND CERTIFIED WEED FREE
SEEDS AND PLANTING MATERIALS.
5.4.3. CERTIFIED WEED FREE STRAW, GRAVEL, AND SOIL ARE RECOMMENDED.
5.4.4. SCHEDULE A POST-CONSTRUCTION INVASIVE SPECIES INVENTORY WITH TCWP
1%
1%
7.50
7.50
7.50
7.50
1%
7.40
7.60
7.20
4%
4%
7.20
1%
1%
STORM
DETENTION
& SNOW
STORAGE
BASIN
6206
6207
6206
6206
5.50
6206
6207
6207
6207
6208
6208
6208
6208
ROOF
DOWNSPOUT
(TYP)
STORM
DETENTION
BASIN
6.0
6206
6207
~2%
~2%
ROOF LINE
OVERHEAD
L.P.
L.P.
L.P.
L.P.
10.0' ESMT