THE TULALIP TRIBES
INFORMATION FOR GRADING PERMIT APPLICATION
Filing Procedure:
1. Send all submittal requirements to permits@tulaliptribes-nsn.gov
Note: Paper submittals can be accepted on a case by case basis if there is a hardship.
Submittal requirements:
1. GRADING PERMIT APPLICATION. Please ensure the application is signed and dated. Write
“N/A” for those questions that do not pertain to your proposal.
2. PROPERTY OWNERSHIP DOCUMENTATION such as a Title or Lease to the property.
3. SITE PLAN. See example on page 2. The Site Plan includes the grading area, property
boundaries, all existing buildings and structures, dimensions, distance to property lines, roads,
right-of-ways, driveways, utilities, and waterbodies (i.e. lakes, streams, wetlands).
4. GENERAL LOCATION MAP. The map must show an area at least 500 feet in all directions
from the project boundary.
5. WETLAND DELINEATION. If there is a wetland within 200’ of the grading area, a wetland
delineation survey is required.
6. PLAN REVIEW FEE: $50. Additional permitting fees may be assessed based upon the
complexity of the project. Please mail a check payable to “Tulalip Tribes” to the following
address: Tulalip Tribes, Attn: Planning Dept, 6406 Marine Drive, Tulalip, WA 98271.
Note 1: Your submittals will be reviewed by multiple Tribal Departments for consistency with Tulalip
Tribal Codes and 2012 IBC Appendix J. You are also required to contact the following departments
and Utility Companies before commencing any grading activity within the Tulalip Reservation:
Power: Puget Sound Energy (888) 225-5773 Gas: Snohomish County PUD (425) 783-8272
Water/Sewer Tulalip Utilities Department (360) 716-4840 Telephone/Cable: Salish Networks (888) 799-8079
Telephone/ Cable: Frontier (800) 961-0470 Tulalip Tax & Licensing Department (360) 716-4211
Tulalip Cultural and Archeological Resources Department: (425) 239-0182
Note 2: Depending on the nature of the proposal, other submittals may be required after review of
your application such as:
ENVIRONMENTAL CHECKLIST
TOPOGRAPHIC MAP
STORMWATER POLLUTION PREVENTION
PLAN
SITE DEVELOPMENT PLAN
GEOTECHNICAL REPORT
MITIGATION OR RESTORATION PLAN
CULTURAL SURVEY
DRAINAGE PLAN
PROPERTY SURVEY
LIQUEFACTION STUDY