The boundaries of the curtilage of the building, or the building as extended, and the
size, position and use of every other building or proposed building within that
curtilage;
The width and position of any street on or within the boundaries of the curtilage of the
building or the building as extended;
The provision to be made for the drainage of the building or extension.
The number of storey’s in the building to which the proposal relates.
5. Where the work involves the insertion of insulating material into the cavity walls the
notice should be accompanied with a notice that states:-
The name and type of insulation material to be used.
The name of any European Technical Approval issuing body which approved the
insulating material.
The requirements of schedule 1 in relation to which any body referred to above has
approved the insulating material.
Any national standard of a member state of the European Economic Area to which
the insulating material conforms.
The name of any body which has issued any current approval to the installer of the
insulating material.
6. Where the building work involves the provision of hot water storage system in relation
to which paragraph G3 of schedule 1 (hot water storage) imposes a requirement the
notice should be accompanied by a statement which specifies:-
The name, make model and type of hot water storage system to be installed.
The name of the body which has approved or certified that the system is capable of
performing in a way that satisfies the requirements of paragraph G3 of schedule 1.
The name of the body that has issued any current registered operative identity card to
the installer or proposed installer of the system.
7. The Reversion charge is calculated in accordance with the Stockton Borough Council
current Scheme of Charges and is payable at the time of submission. Please contact
Building Control.
8. Subject to certain provisions of the Water Industry Act owners and occupiers of
premises are entitled to have their private foul and surface water drains and sewers
connected to the public sewers, where available. Special arrangements apply to
trade effluent discharge. Persons wishing to make such connections must give not
less than 21 days notice to the appropriate authority.
9. These notes are for general guidance only.
10. People proposing to carry out building work or make a material change of use of a
building are reminded that separate permission may also be required under the Town
and County Planning Acts.
11. Having Difficulty?
If you have any difficulty completing this form, or require any further advice, please
contact Building Control.