MINIMUM PERMIT REQUIREMENTS
FOR SCREEN ENCLOSURES
THE FOLLOWING DOCUMENTS MUST BE SUBMITTED IN DUPLICATE
PERMIT APPLICATION COMPLETELY FILLED OUT SIGNED AND NOTARIZED
DOCMENTED PROOF OF COST INCLUDING ALL TRADES
FIRE DEPARTMENT PERMIT FOR MULTI FAMILY DWELLINGS
NOTICE OF COMMENCEMENT OVER $ 2,500.00 IN VALUE
HOMEOWNERS APPROVAL IF REQUIRED
SURVEY SIGNED AND SEALED SHOWING ALL EASEMENTS
DESIGN WINDLOADS SIGNED AND SEALED BY AN ARCHITECT OR ENGINEER
ELEVATION CERTIFICATE, FLOOD ZONE, BASE FLOOD ELEVATION
APPROVAL FROM ZONING DEPARTMENT
PLAN SHOWING LOCATION OF SCREEN ENCLOSURE
PLAN OF SCREEN ENCLOSURE
PLAN OF SLAB SHOWING THICKENED EDGE AND REINFORCEMENT
NOTICE OF ACCEPTANCE FOR FIBERMESH IF USED
PERVIOUS IMPERVIOUS CALCULATIONS IF NEW SLAB
THE PERMIT APPLICATION WILL NOT BE ACCEPTED WITHOUT THE ABOVE MINIMUM DOCUMENTATION
OTHER DOCUMENTS MAY BE REQUIRED DEPENDING UPON THE JOB CONDITIONS
OWNER’S AFFIDAVIT: I certify that all information provided is accurate, and that all work will be performed in compliance with all
applicable laws regulating construction and zoning. No work has been commenced prior to the permit sought by this application,
and all work will be done as indicated in the application and all accompanying document and plans.
NOTICE: In addition, the requirements of this permit, there may be additional restrictions applicable to this property that may be
found in the public records of the county, and there may be additional permits required from other governmental entities such as
water management districts, County, State or Federal agencies.
DISCLAIMER: Issuance of a development permit by a municipality does not in any way create any right on the part of the applicant
to obtain a permit from a state or federal agency and does not create any liability on the part of the municipality for issuance of the
permit if the applicant fails to obtain requisite approvals or fulfill the obligations imposed by a state or federal agency or
undertakes actions that result in a violation of state or federal law.
CONDITION: All applicable state and federal permits must be obtained before commencement of the development.
CONTRACTOR
______________________________
PRINT NAME OF CONTRACTR
________________________________
SINATURE OF CONTRACTOR
STATE OF FLORIDA
COUNTY OF BROWARD
Sworn to (or affirmed) and subscribed before
me this______ day of __________________
20____, by___________________________
NOTARY:____________________________
SEAL:
Personally Known:___________
Or produced Identification______________
Type of Identification Produced__________
OWNER
_______________________________
PRINT NAME OF OWNER
________________________________
SIGNATURE OF OWNER
STATE OF FLORIDA
COUNTY OF BROWARD
Sworn to (or affirmed) and subscribed before
me this______ day of __________________
20____, by___________________________
NOTARY:____________________________
SEAL:
Personally Known:___________
Or produced Identification______________
Type of Identification Produced__________
PERMIT AFFIDAVIT
FOR ACKNOWLEDGEMENT OF COMPLIANCE WITH RESTRICTIVE DEEDS AND COVENANTS
STATE OF FLORIDA:
BROWARD COUNTY:
On this day personally appeared before me, the undersigned officer duly authorized to administer
oaths and take acknowledgments ____________________________________, who being by me first duly
(HOMEOWNER)
sworn, deposes and says:
a/
k/a__________________________________________________________
(Street address)
1. That
I am the legal owner of the property
2. I acknowledge that approval may be required from the following
_______________________________________________________________________________
(Homeowners Association)
Which entities or associations regulate or otherwise govern the community, neighborhood, or development
my property is located.
3. I fur
ther acknowledge that I am responsible for any additional cost that may be assessed by the
Town of Lauderdale by the Sea and/or the entity regulating or governing the subject property as a
result of my not having obtained the necessary approvals from any entity or association that may
regulate or otherwise govern the community neighborhood, development in which my property is
located.
FURTHER AFFIANT SAYETH NAUGHT
Date
________________________
__________
________________________________________
Owners signature
__________________________________________________
Owners printed name
STATE O
F FLORIDA
COUNTY OF BROWARD
Aff
irmed and signed before me, on ________________________________the foregoing document was
acknowledged before me affiant, ____________________________________, who personally appeared
before me at the time of notarization, who signed and acknowledged signing the foregoing document, who
did take an oath, and:
Who i
s personally known to me________ or
Who produced the following identification_____________________________
__________
_______________________________Commission Expiration date:
Notary Public
__________
__________________________________ (Seal)
(Printed or typed name)
By my signature below, I acknowledge that the legal description for the property for which I am
applying for a permit is _______________________________________________________________
LOT
BLOCK SUBDIVISION
Time Limits for Construction - NOTICE TO OWNER
Section 6-12 of the Town’s Code of Ordinances requires:
1. The construction of any new structure or new addition to an existing structure
to be completed and all construction material, equipment and debris removed
from the property within 18 months of the date of the issuance of the first
building permit.
2. The exterior elements of any repair or renovation to an existing structure which
requires a building permit shall be completed and all construction material,
equipment and debris removed from the property within six months of the
issuance of the first building permit.
This notification is the minimum 60 day’s notice required in section 6-12.9(g).
The Failure to complete the construction at
____________________________________________________________________________,
by the construction deadline may result in a fine or legal action by the Town.
If there are extenuating circumstances that prohibit the property owner from completing the
construction within the deadline, the owner may seek an extension of time from the Town
Commission. An application for extension of time may be obtained from the Development
Services Department or Town Clerk.
Owner’s Acknowledgement
I acknowledge receipt and understanding of the Town’s code provisions regarding the time
period to complete a construction projects.
Signature: _____________________________________ Date: __________________
Print Name: ____________________________________________
Address of Property: _________________________________________
BUILDING DEPARTMENT
DURING A HURRICANE WATCH & BEFORE THE ONSET OF HURRICANE
VELOCITY WINDS YOU ARE REQUIRED TO
SECURE THIS SITE
IN ACCORDANCE WITH THE BROWARD COUNTY ADMINISTRATIVE PROVISIONS
OF THE FLORIDA BUILDING CODE SECTION 110.13
All loose objects in exposed outdoor locations shall be
lashed to rigid construction or shall be stored inside an
enclosed structure.
Florida Building Code Broward County Administrative Provisions Section
110.13.2.4
NOTICES ISSUED BY THE NATIONAL WEATHER SERVICE OF A HURRICANE WATCH ARE
DEEMED SUFFICIENT NOTICE TO THE OWNER OF REAL PROPERTY UPON WHICH
CONSTRUCTION IS OCCURRING, OR ANY CONTRACTOR RESPONSIBLE FOR SAID
CONSTRUCTION, TO SECURE LOOSE CONSTRUCTION DEBRIS AND LOOSE CONSTRUCTION
MATERIALS AGAINST EFFECTS OF HURRICANE FORCE WINDS
This includes but not limited to:
110.13.2.1 Road Right-of-Way shall remain clear of construction waste and trash
110.13.2.2 Waste and Trash Enclosures Temporary Toilets
110.13.2.3 Loose Construction Debris Forms and Construction Materials
110.13.2.5 Roofing Tile and Materials Construction Shacks
110.13.2.5 (1) Loading of Roof Tile
110.13.2.5 (4) Store the construction materials inside an enclosed structure.
110.13.3 Building materials shall be loaded on a roof no earlier than (200 working days
prior to permanent installation.
Temporary Electric Service Poles
AND PROTECT ALL GLASS AREAS
AFTER RECORDING RETURN TO:
PERMIT NUMBER:
NOTICE OF COMMENCEMENT
The undersigned hereby given notice that improvement will be made to certain real property, and in accordance with Chapter 713,
Florida Statues the following information is provided in the Notice of Commencement.
1.
DESCRIPTION OF PROPERTY (Legal description & street address, if available) TAX FOLIO NO.:
SUBDIVISION BLOCK TRACT LOT BLDG UNIT
2. GENERAL DESCRIPTION OF IMPROVEMENT:
3. OWNER INFORMATION: a. Name
b. Address c. Interest in property
d. Name and address of fee simple titleholder (if other than Owner)
4. CONTRACTOR’S NAME, ADDRESS AND PHONE NUMBER:
5. SURETY’S NAME, ADDRESS AND PHONE NUMBER AND BOND AMOUNT:
6. LENDER’S NAME, ADDRESS AND PHONE NUMBER:
7. Persons within the State of Florida designated by Owner upon whom notices or other documents may be served as provided by Section 713.13 (1) (a) 7.,
Florida Statutes:
NAME, ADDRESS AND PHONE NUMBER:
8. In addition to himself or herself, Owner designates the following to receive a copy of the Lienor’s Notice as provided in Section
713.13 (1) (b), Florida Statutes:
NAME, ADDRESS AND PHONE NUMBER:
9. Expiration date of notice of commencement (the expiration date is 1 year from the date of recording unless a different date is specified): , 20
WARNING TO OWNER: ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT
ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713, PART I, SECTION 713.13, FLORIDA STATUTES, AND CAN
RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE
RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT
WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT.
Signature of Owner or Print Name and Provide Signatory’s Title/Office
Owner’s Authorized Officer/Director/Partner/Manager
State of Florida
County of Broward
The foregoing instrument was acknowledged before me this day of , 20
By , as
(name of person) (type of authority,…e.g. officer, trustee, attorney in fact)
For . (name of party on behalf of whom instrument was executed)
Personally known or produced the following type of identification:
Notary
(Signature of Notary Public)
Under Penalties of perjury, I declare that I have read the foregoing and that the facts in it are true to the best of my knowledge and belief (Section 92.525, Florida
Statutes).
Signature(s) of Owner(s) or Owner(s)’ Authorized Officer/ Director / Partner/Manager who signed above:
By By
Rev .08-09-07 (S.Recording)
CONTRACTOR PERMIT NUMBER
CONTACT NAME CONTACT NUMBER
JOB ADDRESS
STRUCTURAL
Foundation
Exterior Framing
Wall Sheathing
Columns
Tie Beam
Truss/Rafters
Roof Sheathing
Interior Framing
Bucks
Windows/Doors in progress
Insulation
Rock Base/ Forms
Drywall/Screw
Wire Lath
Pool Steel
Ceiling Grid
Above Ceiling Penetrations
Drive way
Tin Cap and Accessories
Mop in Progress
Tile/Shingle in Progress
Garage door
Shutters
Final Pool
Final Fence
Final Roof
Final windows/doors
Demolition
Other__________________
Final
ZONING
Fence
Pool
Rock Base/Forms
Driveway
Slab/Deck/Patio
Dock/Seawall
Sign
Other__________________
Final
PLUMBING
Rough
Water Service
Second Rough
Top Out
Fire Sprinkler Final
Roof Drains
Gas-rough Inside
Gas-rough Outside
200 PSI Test
LP tank
Well
Lawn Sprinkler Rough
Sewer Hook-up
Main Drain
Pool Piping
Backflow Preventer
Interceptor
Catch Basins
Condensate Drains
Medical Gas
Gas Final
Lawn Sprinkler Final
Demolition
Other________________
FINAL
MECHANICAL
Underground Piping
Condensate Drains
Rough Ductwork
Exhaust Fans/Dryers
Fire Dampers
Smoke Dampers
Ceiling Radiation Damper
Hood Systems Rough
Refrigerator/Walk Cooler/
Freezer
Boiler
Tanks Above Ground
Tanks U
nderground
Demolition
A/C Change Out
Spray Booths
Chimneys and Vents
Cooling Towers/ Chiller
Systems
Process Piping
Fireplace Rough/ Ventilation
Fireplace Final
Hood Systems Final
Other__________________
Final
Electrical
Meter Repair
Temporary Pole
30 day Temporary
Pool Grounding
Underground Rough
Slab Grounding
Rough
Ceiling Rough
Telephone Rough
Telephone Final
Television Rough
Intercom Rough
Sound Rough
Central vacuum Rough
Service Upgrade
Miscellaneous Repairs
Pool Niche Light
Wall Rough
Generator Rough
Fire Alarm Rough
Television Final
Intercom Final
Alarm Final
Sound Final
Central Vacuum Final
Demolition
Other__________________
Final
Other not included
VISIT OUR ONLINE PORTAL TO SCHEDULE YOUR INSPECTION
INSPECTION REQUEST SHALL BE SUBMITTED PRIOR TO 3:00 PM FOR INSPECTION THE NEXT DAY
PLEASE CALL BEFORE 9:00 AM THE MORNING OF THE INSPETION FOR A TIME FRAME OR TO CANCEL THE INSPECTION
ALL NEW CONSTRUCTION, AND ADDITIONS; A SLAB SURVEY AND ELEVATION CERTIFICATE SHALL BE SUBMITTED AND APPROVED
PRIOR TO A COLUMN OR TIE BEAM INSPECTION.
SWIMMING POOLS, SHALL HAVE A SPOT SURVEY APPROVED AFTER THE POOL IS GUNITED AND PRIOR TO PERIMITER PLUMBING
PRESSURE TEST INSPECTION.
A FINAL SURVEY IS REQUIRED PRIOR TO POOL BARRIER INSPECTION, DECK AND PERIMETER FENCE INSPETION AND FINAL
ELECTRIC INSPECTION PRIOR TO MARSITING THE POOL