Click to
Add Logo
SWPPP COMPLIANCE INSPECTION FORM
Project Name: Address: Date:
Owner: Contractor (Gen/Sub): Start time:
Stop Time:Site Contact: Phone:
UPDES Permit #: Expiration: Weather: Sunny Cloudy Raining Snowing Other
Inspection #:
Date of last rain event: Duration: Approx. Rainfall (in):
Inspected By (Print): Local Jurisdiction or County:
Reason for Inspection: Scheduled Complaint/Tip Random Receiving Waters:
Inspection Code
(Check):
SW sampling
SW non-sampling
Inspector Code
(check):
(S) State
(L) Local Type Code (check):
1-Municpal 2-Industrial 3-State
SWPPP, EROSION, SEDIMENT AND HOUSEKEEPING BMP's INFORMATION
YES NO N/A
1. Is the SWPPP on site and accessible, or is the SWPPP location posted in an obvious place and reasonably accessible (in a short time)?
2. Are erosion control, sediment control, buffer controls and good housekeeping BMP's installed on the site as shown in the SWPPP?
3. Has the SWPPP been updated to reflect the current site conditions (modifications dated & initialed on site map, new BMPs on site map,
discontinued BMPs crossed off site map, new BMP details & spec's in SWPPP, SWPPP amendment Log, etc.)?
4. Are on-site inspections being performed and recorded by a qualified person on a weekly or biweekly basis, reporting items required by permit?
(Inspector name, qualifications and signature, weather, problems/repairs, corrective action, new BMPs, removed BMPs, discharges, etc.)
5. Have all corrective action items from previous inspections been logged, addressed and documented within the time frame allotted?
6. Are SW flows entering and leaving the construction site controlled, managed, or diverted around the site? (e.g. buffer zones perimeter controls,
berms, silt fence, up gradient boundary diversion, down gradient boundary sediment control, etc.)
7. Is there evidence of sediment discharge such as mud flows or soil deposits from the construction site in downstream locations?
8. Is there evidence of vehicles tracking soil off the construction site?
9. Is there soil, construction material, landscaping items, or other debris piled on impervious surfaces (roads, drives) that could be washed with
SW to a storm drain or water body?
10. Is there a need to repair, maintain, or improve erosion control BMPs (temporary stabilization, erosion blankets, mulch, vegetated strips, rip rap,
surface roughening, pipe slope drain, dust control, etc)?
11. Is there a need to repair, maintain, or improve sediment control BMPs (silt fence, check dams, fiber rolls, sediment trap/basin, inlet protection,
waddles, straw bails, curb cut-back, etc?
12. Is there a need to repair, maintain, or improve good housekeeping controls (clean track out pad, sweeping, construction materials management,
litter/trash control, port-o-potties staked down, fueling areas, concrete wash out area, proper curb ramps, spill prevention, etc)?
13. Are there disturbed areas that have not had construction activities for 14 to 21 days without stabilization? (except snow or frozen ground)?
14. Are there places where BMPs are needed and should be installed or not needed and should be removed?
COMMENTS AND CORRECTIVE ACTIONS FOR SWPPP COMPLIANCE
Identify the problem and its location. If appropriate, describe (in general terms) what needs to be completed. However, only if qualified (e.g., you are a designer) should you be
mandating specific BMPs to install. Include the date when corrections are made.
Inspector, please list all applicable SEV codes
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is, to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Inspector (Print Name) Title: Signature: Date:
Operator: (Print Name) Title: Signature: Date:
Date:Signature:Title:Operator: (Print Name)
Updated July 2014
ADDITIONAL COMMENTS AND CORRECTIVE ACTIONS FOR SWPPP COMPLIANCE
Date:
By:
Project Address:Project Name:
DOR11
DOR18
BOR12
BOC17
BOC18
BOR41
EPA Form 3560-3 SEV Codes and Descriptions
COR11
BR19B
BR19A
EOR16
AOR22
DOR12
AOR12
BOR42
Discharge without a permit
Failure to apply for a Notice of Termination
Failure to conduct inspections
Failure to develop any or adequate SWPPP/SWMP
Failure to implement SWPPP/SWMP
Failure to maintain records
Failure to monitor
Failure to properly operate and maintain BMP's
Failure to properly install/implement BMP's
Failure to submit required report (non-DMR)
Narrative effluent violation
Failure to submit required permit information
Numeric effluent violation
Violation of a milestone in an order
Click to Add PhotoClick to Add Photo
Click to Add PhotoClick to Add Photo
Click to Add PhotoClick to Add Photo
Click to Add PhotoClick to Add Photo
Click to Add PhotoClick to Add Photo
Click to Add PhotoClick to Add Photo