SS 9 - Mechanical Ventilation or Air Conditioning Systems
Page 1 of 1
SBCG SS9 Version January 2018
The information above is used to help generate the compliance schedule. If you are unsure how to complete this
form, please consult an Independently Qualified Person (IQP) who is registered for the system above.
Address:
Building Name:
Provide by (name):
Make
Model
Location
1
2
3
4
5
Installation Standard:
(specify year)
AS/NZS 3666.2:
AS 1851: (smoke control)
AS 1668.2:
Specifically Designed Alternative Solution (please supply)
Other (Historical) _______________________________
Inspections & Maintenance
Standard:
(specify year)
Compliance Schedule Handbook and AS/NZS 3666.2:
Compliance Schedule Handbook and AS 1851: (smoke
control)
AS 1668.2:
Specifically Designed Alternative Solution (please supply)
Other (Historical) _______________________________
Frequency:
Annually
Six-Monthly
Monthly
Weekly
Inspections & Maintenance:
Minimum maintenance and testing as specified in Compliance
Schedule Handbook, to be performed in conjunction with
maintenance required by applicable standard.
Reporting:
The owner must keep records of all inspection, maintenance and
repairs undertaken in the previous 24 months. The records must be
kept on site and as a minimum, include:
Details of any inspection, test or preventative maintenance
carried out, including dates, work undertaken, faults found,
remedies applied, and the person who performed the work.
Details of any other faults found or maintenance and repair
work undertaken to maintain the system in working order,
including dates, work undertaken, faults found, remedies
applied and the person who performed the work.