SS 15.1 - Systems for Communicating Evacuation
Page 1 of 1
SBCG SS15.1 Version January 2018
The information above is used to help generate the compliance schedule. If you are unsure how to complete this
form, please consult an Independently Qualified Person (IQP) who is registered for the system above.
Address:
Building Name:
Provided by (name):
Make
Model
Location
1
2
3
Installation Standard:
(specify date)
NZS 4512:
AS 1851:
AS 2220:1985
Specifically Designed Alternative Solution (please supply)
Other (Historical)_________________________________
Inspections & Maintenance
Standard:
(specify date)
NZS 4512:
AS 1851:
AS 2220:1985
Specifically Designed Alternative Solution (please supply)
Other (Historical)_________________________________
Frequency:
Monthly
Annual
Inspections & Maintenance:
Planned preventative maintenance and responsive maintenance
should be carried out in accordance with the nominated
performance and inspection standard or document, and to ensure
the system will operate as required in an event where the system is
required to provide protection.
Reporting:
The owner must keep records of all inspection, maintenance and
repairs undertaken in the previous 24 months. The records must be
kept on site and as a minimum, include:
Details of any inspection, test or preventative maintenance
carried out, including dates, work undertaken, faults found,
remedies applied, and the person who performed the work.
Details of any other faults found or maintenance and repair
work undertaken to maintain the system in working order,
including dates, work undertaken, faults found, remedies
applied and the person who performed the work.