Division C
B-2.4.3.
SCHEDULE C-2
Assurance of Professional Field Review and Compliance
See Subsection 2.4.3. of Division C of the Alberta Building Code
To: The authority having jurisdiction
Date:
Address
Postal Code
Name of project
Address
Legal description
Permit number
(a) I have fulfilled my obligations for field review as outlined in Sentence 2.4.4.1.(1) of Division C of the
Alberta Building Code (ABC) and as outlined in the previously submitted Schedule B-1;
(b) I
me on which the building permit was issued for this project;
(c) Those components of the project opposite my initials in Schedule B-2 substantially comply with
(i) the applicable requirements of the Alberta Building Code, and other regulations made pursuant to
the Safety Codes Act and
(ii) the plans, specifications and other documents submitted in support of the application for the
building permit; and
Alberta Building Code 2014 Volume 1 Division C B-13
B-2.4.3.
Division C
Schedule C-2 - Continued
Note: 1. This letter must be submitted by all of the registered professionals of record after completion of the project
to the coordinating registered professional .
2.
In this letter the words in italics are defined in the Alberta Building Code.
3.
This letter must be signed by the registered professional.
4.
The term “substantially comply” is used in field review because a registered professional does not
supervise t
he actual construction.
5.
The constructor is responsible for safety of the public and workers at the project site.
The Alberta Building Code defines a registered professional as an individual who qualifies as a
a)
registered architectural professional,
b) registered engineering professional, or
c) licensed interior designer.
Registered Professional of Record
Signature
Date
Note: affix seals over signature
I,
, have signed on behalf of
Firm
Name
Address
Postal Code
B-14 Division C Alberta Building Code 2014 Volume 1
click to sign