Report of Inspection
&
Testing
of Wet Pipe Fire Protection Systems
Quarterly
/ Monthly
ALL QUESTIONS ARE TO BE FULLY ANSWERED
ANO ALL BLANKS TO BE FILLED
Customer:
System ID
Address:
Inspector Name:
Date
Inspection Frequency:
QUARTERLY REPORT OF INSPECTION
OF
WET PIPE SPRINKLER SYSTEM
(For a Quarterly Inspection, complete all items listed on FORM
94-106A "Report of Inspection - Monthly Items To Be Reviewed"
AND
the items listed below.)
5.2 Hydraulic nameplate attached
5.2
Exterior alarms properly identified
13.7 FDC plainly visible
13.7 FDC easily accessible
13.7 FDC swivels non-binding rotation
13.7 FDC caps/plugs in place
13.7 FDC gaskets/signs in place
13.7 FDC ball drip drain drip free
COMMENTS:
QUARTERLY
TESTING REQUIREMENTS FOR
WET PIPE SPRINKLER SYSTEM
5.2
Spkr. Supply Gauge
psi
5.2
Spkr. System Gauge
psi
5.2
Supply Gauge
Main Drain Flow:
psi
5.2
System Gauge Main Drain Flow
psi
5.3
Inspector's Test Flow
psi
5.3
Time to ring alarm from
Alarm Check Valve
min.
sec.
5.3
Time to ring alarm from Flow Switch
min
sec
5.3
Time to ring alarm from Pressure Switch
sec
y
N/A
N
5.3 Gauges appear operating properly
5.1 Did alarm Supervisory Company receive
signal properly?
5.1 Did Alarm Panel reset properly?
5.1 ALARM PANEL CLEAR
SYSTEM LEFT IN SERVICE
COMMENTS
I acknowledge that the listed deficiencies have been discussed with me
I am requesting a quote for the repair of said deficiencies.
Owner/Rep signature:
DAT
E
INSPECTOR 'S
SIGNATURE:
All "NO" answers
must
be
fully
explained.
N
N/A
Y
MFS location:
Monthly
Quarterly Inspection job #:
min
888-762-7642
PRECOAT METALS MMC
9 COZEN COURT
GRANITE CITY
IL
62040
St. Louis
Tony Witt
11/13/2020 01:00pm CST
20000578
56
56
50
50
50
40
11/13/2020 01:00pm CST
Report of Inspection
&
Testing
of Wet Pipe Fire Protection Systems
Quarterly
/ Monthly
ALL QUESTIONS ARE TO BE FULLY ANSWERED
ANO ALL BLANKS TO BE FILLED
Customer:
System ID
Address:
Inspector Name:
Date
Inspection Frequency:
QUARTERLY REPORT OF INSPECTION
OF
WET PIPE SPRINKLER SYSTEM
(For a Quarterly Inspection, complete all items listed on FORM
94-106A "Report of Inspection - Monthly Items To Be Reviewed"
AND
the items listed below.)
5.2 Hydraulic nameplate attached
5.2
Exterior alarms properly identified
13.7 FDC plainly visible
13.7 FDC easily accessible
13.7 FDC swivels non-binding rotation
13.7 FDC caps/plugs in place
13.7 FDC gaskets/signs in place
13.7 FDC ball drip drain drip free
COMMENTS:
QUARTERLY
TESTING REQUIREMENTS FOR
WET PIPE SPRINKLER SYSTEM
5.2
Spkr. Supply Gauge
psi
5.2
Spkr. System Gauge
psi
5.2
Supply Gauge
Main Drain Flow:
psi
5.2
System Gauge Main Drain Flow
psi
5.3
Inspector's Test Flow
psi
5.3
Time to ring alarm from
Alarm Check Valve
min.
sec.
5.3
Time to ring alarm from Flow Switch
min
sec
5.3
Time to ring alarm from Pressure Switch
sec
y
N/A
N
5.3 Gauges appear operating properly
5.1 Did alarm Supervisory Company receive
signal properly?
5.1 Did Alarm Panel reset properly?
5.1 ALARM PANEL CLEAR
SYSTEM LEFT IN SERVICE
COMMENTS
I acknowledge that the listed deficiencies have been discussed with me
I am requesting a quote for the repair of said deficiencies.
Owner/Rep signature:
DAT
E
INSPECTOR 'S
SIGNATURE:
All "NO" answers
must
be
fully
explained.
N
N/A
Y
MFS location:
Monthly
Quarterly Inspection job #:
min
888-762-7642
PRECOAT METALS MMC
9 COZEN COURT
GRANITE CITY
IL
62040
St. Louis
Tony Witt
11/13/2020 01:00pm CST
20000578
60
60
52
52
52
55
11/13/2020 01:00pm CST
I acknowledge that the listed deficiencies have been discussed with me
I am requesting a quote for the repair of said deficiencies.
O wne
r
/Rep signature:
DATE
INSPECTOR 'S
SIGNATURE:
All "NO" answers must be fully explained
Report of Inspection
&
Testing
of Dry Pipe Fire Protection Systems
Quarterly Items to be Reviewed
ALL QUESTI ONS ARE TO BE FULLY ANSWERED
AND ALL BLANKS TO BE FILLED
Customer:
Inspection job #
Address:
Inspector Name
Date
Inspection Frequency:
Monthly
Quarterly
Dry Pipe Sprinkler System Inspection
Quarterly Testing
Requirements for a
Dry Pipe
Sprinkler System
13.4
System in service on inspection
13.4
Trim valves in appropriate position
13.7 FDC easily accessible
13.7 FDC swivels non-binding rotation
13.4 Quick opening devices tested during
semi-annual inspections
13.4 Quick opening device test date
13.4 Priming water at proper level
Y N/A
N
13.4 Alarm test valve closed
13.4
Intermediate chamber leak tight
13.4
Valve enclosure secured
13.4
Heater operational
13.4
Compressor operational
13.4
Oil level full
13.4
High/1ow pressure switches
operaitonal
13.4
Auto, air main!. devices operational
13.3 Control valve locked/tamper open
13.3 Backflow valve locked open/tamper
Comments:
13.7 FDC caps/plugs in place
13.7 FDC gaskest/signsin place
13.7 FDC ball drip drain drip free
5.2
Exterior alarms properly identified
5.2
Extra heads in spare head cabinet
13.4 Low point drum drips drained
(as f
requently as needed)
4.1
All valves identified with signage
5.2
Hydraulic nameplate attached
13.2 Main drain flow
test with
valve full open
13.4 Sprinkler supply gauge:
13.4
Sprinkler supply gauge with
main drain flow
13.4 Gauges operating
13.2 Interior building alarms operate
13.2 Exterioralarmsoperate
5.1
Did alarm supervisory company
receive signal?
Did alarm panel reset?
Alarm panel clear
in.
psi
psi
Y N/A N
System
l
e
ft
in
serv
i
c
e
Comments:
Y N/A
N
13.3
Valve area accessible
13.3
Control valves accessible
13.4
Air pressure gauge
psi
13.4
Qui ck opening device gauge
p si
13.4
Water pressure gauge
psi
1 3.4
Water supply gauge psi
A-5.7
Main check valve holding pressure
Y N/A N
13.7 FDC plainly visible
System ID:
MFS location:
888-462-7642
55
11/13/2020 01:00pm CST
45
55
55
50
11/13/2020 01:00pm CST
20000578
PRECOAT METALS MMC
Deluge 2
9 COZEN COURT
GRANITE CITY
IL
Tony Witt
St. Louis
MO
I acknowledge that the listed deficiencies have been discussed with me
I am requesting a quote for the repair of said deficiencies.
O wne
r
/Rep signature:
DATE
INSPECTOR 'S
SIGNATURE:
All "NO" answers must be fully explained
Report of Inspection
&
Testing
of Dry Pipe Fire Protection Systems
Quarterly Items to be Reviewed
ALL QUESTI ONS ARE TO BE FULLY ANSWERED
AND ALL BLANKS TO BE FILLED
Customer:
Inspection job #
Address:
Inspector Name
Date
Inspection Frequency:
Monthly
Quarterly
Dry Pipe Sprinkler System Inspection
Quarterly Testing
Requirements for a
Dry Pipe
Sprinkler System
13.4
System in service on inspection
13.4
Trim valves in appropriate position
13.7 FDC easily accessible
13.7 FDC swivels non-binding rotation
13.4 Quick opening devices tested during
semi-annual inspections
13.4 Quick opening device test date
13.4 Priming water at proper level
Y N/A
N
13.4 Alarm test valve closed
13.4
Intermediate chamber leak tight
13.4
Valve enclosure secured
13.4
Heater operational
13.4
Compressor operational
13.4
Oil level full
13.4
High/1ow pressure switches
operaitonal
13.4
Auto, air main!. devices operational
13.3 Control valve locked/tamper open
13.3 Backflow valve locked open/tamper
Comments:
13.7 FDC caps/plugs in place
13.7 FDC gaskest/signsin place
13.7 FDC ball drip drain drip free
5.2
Exterior alarms properly identified
5.2
Extra heads in spare head cabinet
13.4 Low point drum drips drained
(as f
requently as needed)
4.1
All valves identified with signage
5.2
Hydraulic nameplate attached
13.2 Main drain flow
test with
valve full open
13.4 Sprinkler supply gauge:
13.4
Sprinkler supply gauge with
main drain flow
13.4 Gauges operating
13.2 Interior building alarms operate
13.2 Exterioralarmsoperate
5.1
Did alarm supervisory company
receive signal?
Did alarm panel reset?
Alarm panel clear
in.
psi
psi
Y N/A N
System
l
e
ft
in
serv
i
c
e
Comments:
Y N/A
N
13.3
Valve area accessible
13.3
Control valves accessible
13.4
Air pressure gauge
psi
13.4
Qui ck opening device gauge
p si
13.4
Water pressure gauge
psi
1 3.4
Water supply gauge psi
A-5.7
Main check valve holding pressure
Y N/A N
13.7 FDC plainly visible
System ID:
MFS location:
888-462-7642
56
11/13/2020 01:00pm CST
45
56
56
50
11/13/2020 01:00pm CST
20000578
PRECOAT METALS MMC
Deluge 1
9 COZEN COURT
GRANITE CITY
IL
Tony Witt
St. Louis
MO