W:\Building and Safety forms \Final Inspection Checklist Rev 1/20/11
D. PLUMBING
□ Shut-off's at sinks
□ Steam unit pressure relief
□ 1.6 gal. Toilets
□ Air gap
□ Dishwasher
□ Bidet
□ P-traps
□ Caulking/fixtures/faucets
□ Sewer/cleanout/backwater
valve sketch
□ Final gas test
□ Main shutoff/pressure regulator
□ Water heaters
□ Comb. Air
□ Shutoff
□ Strap
□ P/T valve
□ Insulate hot
□ Fasten vent sections
□ Smitty pans
□ Platform
E. EXTERIOR
□ Locking doors
□ Handrails 34” to 38” high
□ Guardrails 36” min 4” open
□ Spark arresters
□ Required planting
(slope, screen, etc.)
□ Painted ABS pipe
□ Security hinges-outswing doors
□ Stoops and landings
□ Anti-siphons-hose
Bibs/sprinklers
□ Roof vent caps
□ Maximum watts ext. lighting
□ P.W. repairs (curbs, gutters, streets)
□ Weather stripping
□ G.F.C.I.'s
□ Address posted
□ Const. Waste removed
□ Trash yard
□ Mailbox
F. GRADING
□ Compaction Report
□ Grade away from bldg.
□ Final civil engineer certification
□ Drainage statement
□ Grading statement
□ Drainage devices
□ Gutters
□ down spouts
□ area drains
□ swales
G. MISCELLANOUS
□ Required safety glass
□ Required dual glazing
□ Garage fire door/closer
□ Int. handrails/guardrails
□ Stairs/rise/run max. 3/8”
Difference
□ 26 gauge fire wall penetrations
□ Smoke detectors
□ Patch fire wall
□ Fire egress @
□ Master
□ Bedroom # 1
□ Bedroom # 2
□ Bedroom # 3
□ Bedroom # 4
□ Basement
□ Smoke Alarms @
□ Bedroom # 1
□ Bedroom # 2
□ Bedroom # 3
□ Bedroom # 4
□ Hallway # 1
□ Hallway