WBCG LG-11 SS2 Version 2018-01-26 Page 2 of 2
(address those items that apply)
Specifically designed solutions do not apply if the system has been installed against a specific Standard(s) / document.
Performance /
installation:
NZS 4512, Year: ……………..
AS 1851, Year: ……..………..
Other: ………………………….
Specifically designed solution prepared by a person
who, on the basis of experience and qualifications,
is competent to do so. (Details provided)
Inspections:
NZS 4512, Year: ……………..
AS 1851, Year: …………..…..
Other: ………………………….
Specifically designed solution prepared by a person
who, on the basis of experience and qualifications,
is competent to do so. (Details provided)
Maintenance:
NZS 4512, Year: …………….
AS 1851, Year: ………………
Other: ………………………….
Specifically designed solution prepared by a person
who, on the basis of experience and qualifications,
is competent to do so. (Details provided)
INSPECTIONS, MAINTENANCE AND REPORTING
(address those items that apply)
Minimum
inspection and
maintenance
procedures:
Planned preventative maintenance and responsive maintenance will be carried out in accordance
wit
h the nominated performance and inspection Standard/document, to ensure the system will
operate as required in the event of a fire or other danger.
Inspection
frequency and
responsibility:
Specifically designed
solutions
By IQP
School Security Warning
System (SSWS):
• Monthly: by School Representative
• Six Monthly: by Security Alarm maintenance contractor
• Annual:
IQP
Security Alarm maintenance contractor
Security Based Warning
System (SBWS)
• Weekly: (sounders) by Owner / Representative
• Quarterly: (sounders & smoke detectors) by IQP only
• Annually:(sounders & smoke detectors + annual survey) by IQP
only
Manual warning systems
(Type 2f alarm)
• Monthly: (Sounders) by IQP only
• Quarterly:(Sounders) by IQP only
• Annually: by IQP only
Automatic fire alarm
system (Type 3,
• Monthly: (Sounders) by IQP only
• Quarterly:(Sounders) by IQP only
• Annually: by IQP only
Reporting:
The owner will keep records of all inspections, maintenance and repairs undertaken in the previous
24 months. These will be recorded in the On-Site Log Book, which will remain on the premises with
the most recent compliance schedule, and as a minimum include:
• Details of any inspection, test or preventative maintenance carried out, including dates,
works undertaken, faults found, remedies applied and the person who performed the work.
• Form 12A provided annually by the IQP