CITY OF WHITEWATER
312 W. Whitewater Street
P.O. Box 178
Whitewater, WI 53190
(262) 473-0540
www.whitewater-wi.gov
NEIGHBORHOOD SERVICES
Electrical Permit
Application
Project Address
Permit No.
Address Phone No.
Address Phone No.
S C H E D U L E O F P E R M I T F E E S
Qty. Fee
NEW
ONE
/
TWO
FAMILY
Base fee ..................................................................... $30.00
RESIDENTIAL
Plus........................................................................ .03/sq. ft.
for all areas
SQUARE FOOTAGE DOES NOT INCLUDE SERVICES. ALL SERVICES MUST BE LISTED BELOW.
REPLACEMENT, MODIFICATIONS AND MISC ITEMS
Qty Item Ea. Fee Qty. Item Ea. Fee
Light switch, outlet, and light fixture
or
communication
device
$
.40
Power
receptacle
over
150
volts
5.00
over 30 amps 6.00
Service
or
switch
alteration
35.00
over 200 amps - addl. per 100 10.00
Refrigerating unit - per hp
1.00
(
$5 min)
Heating
furnace,
water
heater
5.00
Electric unit heating device
(incl remote thermostat)
2.00
Feeder
&
sub-feeder
$
5.00
per 100 amp capacity
Each
motor
-
per hp
.50
Dispenser-gas, fuel oil, permanent
vending
machine
&
well
pump
6.00
Swim
pool
wiring
&
grounding
25.00
Neon
sign,
florescent
sign
.50
per transformer ($4 min)
Wireway, busway, under floor raceway
or auxiliary gutter -
per ft
Air
conditioning
-
per ton 1.00
($5 min)
Light poles
Other
TOTAL LINE
ITEMS
BASE
FEE
+ $30.00
GRAND
TOTAL
DUE
Re-inspection fee 30.00
Special inspection fee 75.00
IF WORK IS STARTED BEFORE PERMIT IS ISSUED, FEES ARE DOUBLE.
Signature of Applicant Date License No.
Approved by: City of Whitewater Date
Revised 02/13
click to sign
signature
click to edit