PFD P-005A Rev. (12/13/19) Construction Permit Application Page 1 of 2
Pechanga Fire Department
Application for Fire Department Construction Permit
(Submit Application at least 30 business days prior to work)
APPLICANT INFORMATION (PERMITEE)
Name: Title:
Company: License Type and #:
Phone: Email:
I certify that all of the information I have provided is correct, and I agree to comply with any CONDITIONS OF APPROVAL and all
laws pertaining to this permit adopted by the Pechanga Indian Reservation. I understand that any false or misrepresented
information provided or any violation of the conditions or laws may result in the immediate revocation of this permit. I understand
that approval of this permit is valid only for the permittee, work, location, and dates specified on this application.
Signature: Date:
PERMIT INFORMATION
Name of Project: PFD Project #
Address: Building Permit #
Location: Date work begins:
CONSTRUCTION PERMIT TYPE: (check all that apply and enter necessary information)
CONSTRUCTION PERMITSAllows the applicant to construct, install or modify structures, systems and equipment for which a
permit is required by and shall be in accordance with Pechanga Building & Fire Code Ordinance. Construction permits expire after
180 days of inactivity.
PRC
PDC
PTG
Private
FIRE ALARM: New TI
$
BATTERY SYSTEM
$
#devices:
#floors:
CAPACITOR ENERGY SYSTEMS
$
FIRE SPRINKLERS: New TI
$
COMPRESSED GASES
$
CRYOGENIC FLUIDS
$
#heads:
#floors:
EMERGENCY RESPONDER RADIO SYSTEM
$
#systems:
#calc’d areas:
FLAMMABLE & COMBUSTIBLE LIQUIDS
$
#sq. ft.:
FUEL CELL POWER SYSTEMS
$
FIRE PUMP: New TI
$
GATES/BARRICADES IN FIRE APPARATUS ACCESS
$
HAZARDOUS MATERIALS
$
FIRE SERVICE UNDERGROUND:
New TI
$
HIGH PILED STORAGE
$
#risers:
#hydrants:
INDUSTRIAL OVENS
$
STANDPIPES: New TI
$
LIQUID PETROLEUM GAS (LPG)
$
SMOKE CONTROL/EXHAUST SYSTEM
$
#systems:
#calc’d areas:
SOLAR PHOTOVOLTAIC SYSTEM
$
SPECIAL HAZARD SYSTEM: New TI
$
SPRAYING / DIPPING MACHINERY
$
MOTOR VEHICLE REPAIR ROOMS & BOOTHS
$
SPECIAL EVENT STRUCTURE
$
TENT/TEMPORARY MEMBRANE STRUCTURES
$
OTHER:
$
GAS DETECTION SYSTEM: New TI
$
OTHER:
$
PRIVATE FIRE HYDRANT: New TI
$
Standby Service $300 per hour: #engines______ # hours______
ADDITIONAL INFORMATION “REQUIRED”
Provide detailed description of the project/event. Identify systems and explain scope of work to be performed. Attach plans,
diagrams, and other applicable documentation.
click to sign
signature
click to edit
PFD P-005A Rev. (12/13/19) Construction Permit Application Page 2 of 2
FEES
Please refer to the Pechanga Fire Department Fee Schedule. Permit/Inspection Fees include inspections noted in conditions and (1)
reinspection additional reinspections will be charged $75. **Some operational permits require plan review per fee schedule or the
miscellaneous hourly rate.
Total # permits:
Total Permit Fees: $
Plans/Submittals Included: YES NO N/A
Total Plan Review Fee: $
Submit permit applications and (3) sets of plans, when required, with payment:
In person by appointment or mail
Pechanga Fire
Department Fire Station 1
(c/o FIRE MARSHAL), 48240 Pechanga Rd., Temecula, CA 92592, 8AM-NOON Monday-Friday;
By
appointment
Fire Marshal’s Office
, 45421 Pechanga Pkwy., Ste. 217 (Pechanga Resort & Casino Career Center) Monday-Friday.
Online:
https://tinyurl.com/PechangaFD. We accept Visa, MasterCard, Discover, Checks, and Cashier Checks. Sorry we do not accept
Cash or American Express. Make checks payable to “Pechanga Fire Department”.
OFFICE USE ONLY
Date Received: Received by:
Permit Paid in Full: YES NO N/A
Permit Fees Paid: $
Balance Due: $
Plan Review Paid in Full: YES NO
Review Fees Paid: $
Balance Due: $
Plan Review Required: YES NO
Check #
Credit Card
Permit #: Effective Date:
Issued by: Expiration Date:
Approved Approved with Conditions Denied
Approval of this permit shall not be construed to be approval of any violation of any provision of federal, tribal, or other applicable laws.
CONDITIONS: