PLUMBING AND MECHANICAL FEES (PER UNIT) – TABLE 103.4.2 (A)
Commercial plumbing & mechanical permits are required to submit line drawings. A plan review
fee of 65% for plumbing and 25% for mechanical are assessed at the time of submittal. All permits
are subject to a 5% technology fee.
Additional plan review fees / hr.
Dishwasher – residential/
commercial
Grease Interceptor < 1000 gal.
Grease Interceptor 1000 gal. or
greater
Kitchen Sink and/or Disposal
Med Gas Piping<5 inlets/outlets
Med Gas Piping>5 inlets/outlets
(per unit)
PW inspection fee for backflow
Side sewer inspection/install
Sink (bar, service, etc.)
Supplemental Permit Fee
(amend existing permit)
Water installation and/or repair
(includes fire supply lines)
Additional plan review fees/ hr.
Air Cond. Unit < 100 Btu/h
Air Cond. Unit > 100 Btu/h
Air Cond. Unit > 500 Btu/h
Boiler > 1 million Btu/h < 50hp
Boiler > 1.5million Btu/h <50hp
Boiler > 500Btu/h 15-30hp
Forced Air Heat < 100 Btu/h
Forced Air Heat > 100 Btu/h
Gas Piping > 5 units (per unit)
Heat Pump or Condensing unit
Pkg. Units < 100Btu > 100Btu
Refrigeration Unit < 100 Btu/h
Refrigeration Unit > 100 Btu/h
Refrigeration Unit > 500 Btu/h
Supplemental Permit Fee
(amend existing permit)