Rev 05/11/15 jt
ELECTRICAL PERMIT APPLICATION NOTES
Numbers in parenthesis indicate the number of inspections provided.
Commercial plans, which include the technical design analysis, shall bear the seal of a design professional and must include fault current
calculations and a one-line diagram.
Work started prior to securing the required permits are subject to a minimum investigation fee of $200.00. Emergency work, if agreed to by the
Chief Building Official, shall be exempt from the investigation fee.
Only the person performing the work may obtain a permit and schedule inspections.
Payments for all permits must be made prior to requesting an inspection.
Installations requiring inspections must not be covered until approved. Failure to receive approval may result in orders requiring the removal of
such covering.
Installations must be in accordance with NEC, as referenced per RBO and OBC.
Requests for field inspections must be made a minimum of 24 hours in advance and will be scheduled for the next working day.
Applicants on the schedule for the day’s inspections may contact the respective inspectors during the morning from 8:00 am to 8:45 am for
consultation or scheduling time.
An additional $45.00 reinspection fee may be imposed for work that is not properly installed, is not ready for inspection, has changed from the
approved plans or is not accessible at the time of the inspection.
FOR RESIDENTIAL PLAN SUBMITTAL ONLY
SERVICE
SERVICE CABLE
GROUND WIRE TO EARTH
GROUND WIRE TO WATER
LOCATION OF PANEL IN STRUCTURE
PROVIDE ADDITONAL DETAILS OR DRAWING BELOW
All electrical installations must comply with the 2011 National Electric Code
(new system or alteration to existing system)