PERMIT PACKAGE DROP OFF CHECKLIST FOR ePlan
Application Number: ______________________ Drop Off Date: ______________________
Received by
County / Initial
Complete a Request for a Permit Application Number in BPOnline
Signed and completed this Drop Off Checklist Form
Required Forms for All Permit Packages at time of Drop Off:
Received by
County / Initial
Permit Application Form, Additional Information Form, or Revision Form
Property Appraiser’s print out with legal description
Signature Acknowledgement Form and/or Limited Power of Attorney Form
Possible Additional Forms may be required prior to Permit Payment:
(These can be uploaded whenever you have a task in your queue along with any other outstanding submittals)
Received by
County / Initial
Historical / Archaeological Form – if breaking ground in any way
Asbestos Notification Form – as applicable
Utility letter – Water & Sewer, if new construction and other than Seminole County Utilities
Fence Estoppel letter – required for all fence permits
Shed Estoppel letter – may be required prior to permit issuance pending Zoning Review
Arbor Application – if applicable. For arbor questions please call 407-665-7371
Recorded copy of Notice of Commencement
Owner Authorization – if applicable (Landlord/Tenant Affidavit / Notarized Letter / Lease)
Plans Required at time of DROP OFF (if applicable for scope of work):
Received by
County / Initial
Construction Drawings (drawings requiring signing sealing must be wet or raised seal)
Product Approval form – as applicable
Gas Plan Worksheet – as applicable
Pool Safety Affirmation letter
If uploaded by ePlan Applicant, the following files can be uploaded as individual multi-
page files (documents requiring signing sealing must be wet or raised seal)
Energy Calculations – as applicable
Truss Package – as applicable
See reverse side of this page for required Drop-Off acknowledgements