CONDITIONS
1. Upon receipt of the completed application form, the Roads Authority will, if specific site approval is
required, issue the approval, together with a plan and signal timings for use by the applicant (if
required). If site approval is not required, the Roads Authority shall take the application as
notification of the intention to use two way Portable Light Signals and confirm that specific site
approval is not required.
2. The Roads Authority must be notified if:
a. Any change is made to the date or time on the application.
b. The work is in the vicinity of any permanent signals including Pelican crossings.
c. The work is in the vicinity of a level crossing (Network Rail must also be consulted).
3. Where emergency or urgent works require portable light signals to be set up out with office hours,
the Undertaker shall:
a. Obtain verbal approval from the appropriate Roads Authority
b. Provide retrospective notification/application for written approval on the next working day;
and
c. Provide details of the works location, nature of works, portable light signals layout, and
both the Undertaker’s and Contractor’s contact phone numbers to the appropriate Roads
Authority.
4. At least seven working days notice shall be given for all works other than emergency and
urgent works. For emergency and urgent works, (ie when circumstances arise which could result
in immediate danger to the public or serious damage to the road), this notice must be sent within 2
hours of work starting. Where a portable light signal design is requested the minimum design
period is 2 weeks prior to approval of portable light signals. Roads Authority must be notified
within 48 hours of signals being removed from carriageway. Any changes to start and finish
dates must be notified and approved in advance.
5. Wherever signal control is to be used at a works site, which contains or is near a junction, two
scaled plans showing the proposed temporary site layout must accompany this application. It is a
statutory requirement for the Roads Authority to issue written site approval before signals are
installed, in these instances.
6. Signal Operation:
a. Working day is taken to be 0730hrs to 1900hrs
b. 24 hours is taken to be continuous use for duration of the works.
c. Overnight is taken 1900hrs to 0730hrs
d. Off peak is taken to be 0915hrs to 1530hrs (Mon to Fri.)
7. The signal equipment and traffic signs must satisfy fully all the requirements set out in the Traffic
Signs Regulations and General Directions 2002, and all other relevant regulations, directions and
technical memoranda. Procedures, layouts and operations shall be in accordance with "Safety at
Street Works and Road Works - A Code of Practice" and "Traffic Signs Manual - Chapter 8".
8. The mode of operation of the signals shall be "Vehicle Actuated" to the Department of Transport's
booklet "An Introduction to the Use of Traffic Actuated Portable Traffic Signals", (the pink booklet),
unless otherwise agreed by the Roads Authority in writing.
9. All apparatus whether hired or owned by the user will be subject to a "beck and call" maintenance
contract. The user must establish a safe working method of traffic control within 2 hours of
notification of a fault or defect. The apparatus must be inspected and tested before delivery to site
and the user must satisfy the Roads Authority and Police that the equipment meets all the
necessary requirements and that a competent person has made the pre-delivery check. Stop/Go
Boards must be on site, and in a fit state for use, at all times that the site is manned.
10. When the site is in an urban environment, the apparatus must be of a type, which produces a noise
level maintained below the first action level 85 db(A). This will ensure that noise produced is kept
to a minimum thus reducing the risk and any harmful effects to the public.