PART I. BUSINESS INFORMATION
___________________________________________________________________
BUSINESS NAME: PHONE:
BUSINESS ADDRESS:
APPLICANT: JOB TITLE:
BUSINESS OWNER’S NAME:
PART II. Provide a Brief Description of the Proposed Use:
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
THE FOLLOWING REQUIREMENS APPLY TO ALL PERMIT ISSUED FOR THE USE OF THE
TEMPORARY STRUCTURES(S) OR A TEMPORARY USE FOR COMMERCIAL PURPOSES.
1. The maximum length of the permit shall be in 30 days. The first day of the 30-day permit shall be in
the date shown on this permit. A maximum of four permits per calendar may be authorized.
However, at least 60 days shall elapse between the expiration of one permit and the approval of
another.
2. A site plan shall be submitted showing the location of the temporary structure/use. The temporary
structure/use shall not occupy parking spaces, nor interfere with driveway isles, ingress and egress,
sight triangles, required setbacks, or buffer yards. The site plan must show all temporary signs,
electrical connections if applicable. Electrical connections shall be approved by the Building
Inspection Department.