Revised: 2020 122
Foundation
Foundation Wall Width
Height Abv Grade (6” or 4”)
Dampproofing
Footing Size
Drain Tile Loop W/ Sump Pit (Fdn. Plan)
Depth 3’-6” min. (incl. @ window wells)
Sill Plate Treated
Anchorage
Size
Floor
Concrete Slab (w/WWF)
Radon Mitigation per State of IL
Framing Floor Joist Size/Span/Spacing/
Floor Trusses (draftstopping)
Floor Openings (@ stairs, etc.)
Sheathing Type / Thickness
Wall Construction
Framing Stud Size / Spacing / Height
Sheathing Type /Thickness / Bracing
Header Sizes
Wall Covering
Weather Resistant Barrier
Masonry Veneer (incl. anchors / flashing / weeps)
EIFS (drainage plane)/ Stucco Details
Flashing @ Windows/Doors/Wall to Roof / Lintels
Gypsum Board (typical & @ fire rated garage)
Cement Board (@ tubs / showers)
Roof / Ceiling Construction
Ceiling Joist - Size / Spacing / Span
Rafters - Size / Spacing / Span
Roof Trusses
Beams
Sheathing / Thickness
Attic Access Size / Location
Ice Barrier
Roof Venting Area Req’d/provided Calcs
Soffit/Ridge/Box Sizes (free area)
Cathedral Venting
Roof Assemblies
Roof Underlayment (@ high/low slopes)
Ice Barrier Underlayment required
Municipal Amendment #22)
Flat Roof
Solar Panels
Energy Code Compliance – 2015 IECC
Fireplace
Masonry
Plan w/Firebox Width/Depth, Hearth
Extension Width
Section w/ flue/firebox height /hearth ext.,
lintel, surround (mantel) size
Chimney termination above roof
Combustion Air
Sealed doors per IECC (wood burning
fireplace)
Prefab Fireplaces & Chimneys listed & labeled per
UL127 & installed per manufacturer instructions (specs
required for bedroom locations)
Energy Code Compliance – 2015 IECC -
Prescriptive or Performance noted on Cover Sheet
Floor Plan Key Diagrams to illustrate thermal
envelope
All Building Components Identified
Foundation R value (insul. to top of fdn)
Wall R value (above grade)
Roof/Ceiling R value (R above wall plates)
Window/Door/Skylight U value
Furnace AFUE
Window/Door/Skylight U value
A/C SEER
Mandatory Requirements: Ducts Piping
NOTE: No heat allowed to unconditioned spaces
Whole Building Ventilation Method
Blower Door Test Reqd w/report submitted
Mechanical
Mechanical
Identify Combustion Air
Equipment Size based on bldg. loads
Furnace location
Condensate Disposal
Kitchen Exhaust >400cfm
Method of Radon Mitigation
Access/Service Space
Plumbing
Water Service Size (proposed or existing)
Plumbing Walls (5 ½” min.)
Ejector Pit
Floor Drain
Steam Shower
Water Heater(s) (w/pan required above living areas)
Protection from Freezing (see IECC)
Electrical
Identify Electrical Panel & Service Size (Amended
NEC 230.11(B) Service Size)
Lighting locations
Closet/Storage (>6sf)
3 way switching (NBK amend.)
Receptacles: GFCI (kitchen, bath, exterior,
garage, unfin. basement)
AFCI (living areas)
Foundation
Foundation
Floor
Wall Construction
Wall Covering
Roof / Ceiling Construction