Final Plat Submittal Requirements (Page 2)
Requirement Checklist
Item complete?
(Yes/No or NA)
Proposed name of subdivision, north arrow, scale and date.
Names and addresses of owners, lien holders, subdivider, surveyor and designer.
Primary control points, approved by the city engineer, or descriptions and “ties” to
such control points, to which all dimensions, angles, bearing, elevations and similar
Subdivision boundary lines, side and center lines of streets and other rights of way,
lines of easements, lot lines, lines of all other sites and of all reservations; with
accurate dimensions, bearing or reflection angles, and radii, arcs, and central angles
Location and description of all monuments.
Names and widths of all streets.
Widths and purposes of easements.
Block numbers, consecutive.
Lot numbers, consecutive, starting with the figure “1”, in each block.
Dedication of any sites, in addition to streets, rights of way and easements,
reserved or dedicated and the purposes.
Lines indicating minimum building setback distance on all lots and other sites.
Owner’s statement offering streets, rights of ways, and public areas, for dedication
to the public.
Owner’s agreement to the subdivision by the subdivider, if owner is not the
subdivider.
Certificate of title.
Surveyor’s certificate as to making the survey and its accuracy, as required herein.
Other data, certificate, affidavits and endorsements that may be required by the
planning commission or by the city council.
Accompanying the final plat shall be a final plan of all improvements to be installed
by the subdivider, with grades, and profiles for same as approved by the city
Separate
Document
A certificate by the city engineer that all requirement improvements have been
installed or than, in lieu thereof, a surety bond or certified check, running to the
city in an amount sufficient to cover the cost of completion of all required
improvements, has been posted.
Separate
Document
Accompanying the final plat shall be restrictive covenants in form for recording.