Operational Permit Application
McKinney Fire Department
Fire Marshal’s Office
2200 Taylor Burk
McKinney, Texas 75071
FOR MFD USE ONLY
Permit Fee Paid
Reviewed By:
Approved
Condition(s) attached
Denied
Date:
Rev. 01-2020
Please complete this application and attach all required documents. This will assist staff with reviewing your request.
Only electronic (pdf) submittals will be accepted. Submittal email: fireplans@mckinneytexas.org
Applicant Information
Business Name
Business Address
Street Address
Suite/Building Number
Business Owner
Installation Company
Contact Person
Phone
Email
Following PER USE Operational Permits require additional Permit Fees based upon Table 107
Amusement Buildings
Carnival and Fairs
Pyrotechnics
Cooking Tent / Tent
Following PER USE Operational Permits do not require addition Permit Fees
Parade Floats
Open Burning
Following ANNUAL Operational Permits do not require addition Permit Fees
Renewal
NO Changes
Renewal
w/ Changes
Aviation Facility
Compressed Gas (incl. CO
2
beverage dispensing)
Dry Cleaning
Explosives
Firefighter Air Replenishment Systems
Flammable and Combustible Liquids
Hazardous Materials
High-Piled Storage
LP-Gas (Storage & Retail)
Mobile Food Prep Vehicle
Motor Fuel Dispensing
Open Flames and Candles
Places of Assembly
Repair Garages
Refrigeration Equipment
Spraying and Dipping
Other Operational Permits shall be renewed and charge appropriate Permit Fees according to Table 107
Other:
I, (print name) ________________________________________________________, am making application for an operational
permit. I understand it is my responsibility to renew said permit based upon the requirement of the code. Failure to obtain and/or
renew operational permits may result in a failed inspection, termination of permit application, additional fees, and/or citations
accessed in accordance with the City of McKinney Codes and Ordinances.
Signature: ____________________________________
Date: ___________________
Application Fee: $100.00 - Additional Permit Fees May Apply
Where multiple Annual Operational Permits are required for a single facility/location, all appropriate operational permits
must be obtained, however, the single facility/location shall only be charged a maximum of $400.00.
click to sign
signature
click to edit