4
Major Preliminary Plat
Please add the following notes as applicable:
• Mailboxes within the road right-of-way shall be of a breakaway design.
• The existing buildings noted to be removed shall be done so prior to final plat approval.
• Access to [insert state highway name here] must be approved by the Iowa Department of Transportation.
• Future development of the property is subject to Article 7, Section 4, "Natural Resource Protection,
Woodlands" of the Polk County Zoning Code, which preserves wooded areas of the property.
• Any subsurface drainage facilities that are disturbed must be restored or rerouted by the property owner.
• Services to all utilities located on the opposite side of the roadway must be bored under the roadway at the
lot owner's expense.
• Maintenance of all drainage easements to be the responsibility of the property owner.
• Culverts to be used for crossing drainage easements must be designed by a licensed professional
engineer.
• [Insert County road Street Lot Letter Here] shall be dedicated to Polk County for roadway purposes. [Insert
County road Street Lot Letter Here] shall be dedicated to Polk County for roadway purposes at such tim
e
t
he roadway has been improved and accepted into the Polk County Secondary Road System by the Polk
County Board of Supervisors.
• Post development runoff will not adversely affect downstream drainage facilities or property owners.
• It shall be the Developer's responsibility to apply for and obtain any storm water discharge permits from the
Iowa Department of Natural Resources.
• The Developer shall be responsible for the maintenance of the pavement on the temporary turnaround until
the next phase of the development.
• Polk County does not require or issue permits for sidewalks and does not accept the liability and/or
responsibility for construction placement, repair, or maintenance thereof of any street sidewalk installed i
n
t
he plat by any home owner.
• Due to soil types, limitations, and disturbance, alternative septic systems may be required. Individual
wastewater treatment systems shall be designed by an Engineer.
• Grading contractor will be required to provide a 4-year maintenance bond for erosion control. The IDNR
Storm Water Discharge Permit will be required prior to grading operations.
• The Homeowner's Association will be responsible for the maintenance and repair of the detention basins
and detention outlet facilities.
• Note utility service providers.
• Access to each lot is restricted to the subdivision road. [Plats with proposed internal streets]
P
olk County Public Works, Planning & Development Division
5885 NE 14
th
Street, Des Moines, IA 50313
▪ Phone (515) 286-3705 ▪ Forms available online http://www.polkcountyiowa.gov/PublicWorks/