Mid-East Ohio Building Department
22 North 5th Street
Zanesville, OH 43701
Phone: 740.455.7905
Fax: 740.455.7907
1. Name of Project:
2. Description of Project:
3. Exact Address of Project:
City:
County:
4. Estimated cost of project:
5.
Is Project incorporated in a city or village?
YES NO
6. Has Zoning been approved? YES NO N/A
7. Has storm water been approved: YES NO N/A
8. Has Plumbing been approved? YES NO N/A
9. Designate Flood plain:
10. Nature of project: NEW
11. Type of Construction: IA IB IIA IIB IIIA IIIB IV VA VB
12. Proposed OBC Use Group: A1 A2 A3 A4 A5 B E F1 F2
H1 H2 H3 H4 H5 I1 I2 I3 I4
M R1 R2 R3 R4 S1 S2 U
13. Current OBC Use Group:
14. Applicant's Name:
Address:
City:
E-mail:
Phone:
15.
16. Project Contact Person:
17. Job Site Contact Person:
Signature of Applicant:
Please fill out three pages
completely.
State:
If you desire to have plans returned to you as opposed to picking them up, please provide the
following: prepaid shipping label and packaging or prepaid packaging.
Cell:
Fax:
Plan Approval Application
Zip:
Zip:
CHANGE OF
OCCUPANCY
Plan Approval Fees are due at time of application. Plans will
NOT be processed until fees are paid.
ADDITION
Please submit three copies of the construction documents.
City of Zanesville projects will NOT be processed without written confirmation that zoning has been notified/approved.
pg 1 of 3
Cell:
Cell:
OHIO
click to sign
signature
click to edit
18. Owner of Building/Project:
Address:
City:
E-mail:
Phone:
19. Person Preparing Plans:
Address:
City:
Email:
Phone:
20. Square footage of new building or of addition or alteration:
Basement
1st Floor
Mezzanine
Other floors (=2+3+4+etc)
Total square footage:
21. Multiplier: round to next highest 100 square footage:
If a Project is an Existing Building, or an Addition or Alteration to an existing building, complete items 22 thru 25.
22. Floor Construction: Roof Construction: Wall Construction:
Wood on wood joist Wood Framed Masonry
Concrete on Steel Joists Steel joist Wood Framed
Reinforced Concrete Reinforced Concrete Metal Stud
Slab Heavy Timber Other
Other Other
Ceiling Construction:
Exposed wood joist Drywall
Exposed Steel Joist Wood
Lay-in Other
23. Are there existing fire rated walls? No
24. Does addition block exits from building? No
25.
Comments:
pg 2 of 3
Yes
If yes, please provide sketch indicating
location.
Yes
If yes, please provide sketch indicating
location.
Zip:
Zip:
Fax:
Fax:
Cell:
State:
State:
Cell:
OHIO
OHIO
0.00
pg 3 of 3
FEE SCHEDULE (to be completed by Applicant)
MID-EAST OHIO BUILDING DEPARTMENT
FEES FOR SPECIAL SITUATIONS SHALL BE
DETERMINED BY THE BUILDING OFFICIAL
PAYMENT: Credit Card, Cash, Check, or Money Order made
payable to Mid-East Ohio Building Department, due at time of
submittal.
(2) Field Inspections, $220
Certificate of Occupancy, $50
(2) Field Inspections, $220
$220 Processing Fee - Electrical
$220 Processing Fee - Structural
Special Pricing per Chief Building Official
$220 Processing Fee - Electrical
Mechanical Field Inspection, $110
Electrical Field Inspection, $110
$220 Processing Fee
$4.95 per 100 sq. ft. of rack
Board of Building Standards fee - 3%
TOTAL:
$500
RETAINING WALL (as part of egress path)
CELL TOWERS (NEW)
CELL TOWERS (ADDITIONS TO EXISTING)
INDUSTRIALIZED UNIT FEE
FENCE (Over 6'-0")
$1.75 PER 100 sq. ft. (foundation)
$220 Processing Fee - Structural
*REFER TO MULTIPLIER PAGE 2, #21.
$220 Processing Fee
(2) Field Inspections, $220
FIELD INSPECTIONS, $110 EACH
RE-INSPECTIONS (failed or not ready) $110
SPECIAL PLANS EXAM, $83 PER HOUR
TEMPORARY OCCUPANCY, $350
SUB-TOTAL:
$0.50 per lineal ft., $110 min.
$110 per installation company
GENERATORS
HVAC DIRECT REPLACEMENT
RACK SPRINKLERS
EXISTING BUILDING CERTIFICATE OF OCCUPANCY (C/O)
WORKING WITHOUT A PLAN APPROVAL
$110 Electrical Field Inspection
$220 Processing Fee
0 - 25,000 sq ft $220
25,001 - 50,000 sq.ft. $330
50,000 - 100,000 sq.ft. $440
$220 Processing Fee
$4.95 per 100 sq. ft.*
$220 Processing Fee
$4.95 per DEVICE
$110 Field Inspection Fee
$220 Processing Fee
$220 Processing Fee
RE-ROOF / ROOF REPLACEMENT FEES
UNDERGROUND FIRE SUPPRESSION FEES
LOW VOLTAGE WIRING
$220 Processing Fee
$8.25 per 100 sq. ft.*
$220 Processing Fee
$4.95 per 100 sq. ft.*
$220 Processing Fee
$4.95 per 100 sq. ft.*
$220 Processing Fee
FIRE ALARM FEES
KITCHEN HOOD FEES
KITCHEN HOOD FIRE SUPPRESSON FEES
OUTSIDE POLE LIGHTING FEES
CONSTRUCTION TRAILER FEES
SERVICE ENTRANCE FEES
$110 per TANK
$220 Processing Fee
$110 Field Inspection Fee
$110 Structural Field Inspection
STRUCTURAL FEES
MECHANICAL FEES
ELECTRICAL FEES
FIRE SUPPRESSION FEES
$220 Processing Fee
$25 per 100 ft of length
$220 Processing Fee
$220 Processing Fee
0.00
0.00
0.00