SECTION II – COMMERCIAL / INDUSTRIAL (Non-Residential) Fill out completely. Be sure
to include all required submittal attachments and to also complete Section IV (signature) to complete
permit application form. Construction plans are required for commercial HVAC and plumbing
application. Please list each occupancy classification and describe what work is being proposed for
each area.
REQUIRED INFORMATION FOR COMMERCIAL / INDUSTRIAL APPLICATIONS:
SITE PLAN:
Site Plans must show the building in relationship to the property and all accessory building and utilities. List
distances to streets, property lines and between buildings. Show the location of all equipment and piping
outside the building.
MECHANICAL AND/OR PLUMBING DIAGRAMS AND PLANS:
Plans must be no smaller than 8.5x11 and includes a scaled floor plan that shows the location and size of
fixtures, equipment, sized fuel gas piping, ducts, shut-offs, return air, exhaust fans, supply and drainage piping,
valves, cleanouts, floor drains, vent risers, grease traps, commercial range hoods, extinguishing systems, duct
and shaft construction, and roof termination.
COMMERCIAL ATTACHMENTS
Site Plan Attached
Plumbing Piping Diagrams and Plans Attached
Mechanical Diagrams and Plans Attached
Uniform Building Code Occupance (1997 U.B.C. Section 301 and Table 3-A for classifications)
SECTION III - FEES
Commercial fees will be determined through plan review
MECHANICAL PERMITS FEE
Mechanical Permit Fee 23.50
FURNACE
<100,000Btu
>100,000Btu
14.80
x____ =$_____
18.20
x____ =$_____
Dryers 9.50 x____ =$_____
Wood/Gas Stoves 9.50 x____ =$_____
Range Hoods 9.50 x____ =$_____
Water Tanks 9.50 x____ =$_____
Misc. (please write in): 9.50 x____ =$_____
Fuel Piping
1-4 fixtures
5 + fixtures
5.00
x____ =$_____
1.00
x____ =$_____
Total Mechanical Fees $_____________________
PLUMBING PERMITS FEES
Plumbing Permit fee 20.00
Fixtures 7.00 x____ =$_____
Total Plumbing Fees $_____________________