MANUFACTURED
HOME
Permit
#
______________________________
Fee
_______________________
Date
___________________________
OWNER
INFORMATION
Owner
Name :
________________________________________________________________________________
Address :
_ _______________________________________
City :
_______________________
Zip :
_________
Subdivision:
___________________________________________________________
Parcel:
_____________________
Name
of
Company:
______________________________________________________________________________
Main
Contact:
__________________________________________________________________________________
Address:
_______________________________________________
City:
_____________________GA
Zip:
_______
Contact
Phone:____________________________________ Email:
________________________________________
MOVING/SET
UP
PERSON INFORMATION
Business
License
#:
___________________________________
State
License
#:
____________________________
(Copy
of
business
license
and
certification
card
if
applicable
must
be
provided.)
PERMIT
APPLICATION
OFFICE
USE
ONLY
Zoning
Approval
__________________________________
Final
Approval
_________________________________
Use
Classification
____________________________________
Type
_______________________________________
       
              
Pre-Owned
Fee
New Fee
$____________ .20/sf PLUS an Inspection
Fee of
$100
Phone:
___________________________Email:
_________________________________________________________
Manufactured
Home
Dealer
Name:__________________________________________________________________
Address:
______________________________________________
City:
________________________
Zip:
__________
Contact Phone:____________________________________
Email:
________________________________________
I
DEALER INFORMATION
Business License #:
_____________________________________ State License #:
___________________________
Manufacturer:____________________________________________
Model
Name:
____________________________
Serial # ____________________________
Year:
___________________ Decal
#:
______________________________
STRUCTURE
INFORMATION
Total Square Foot::_____________ Length
x
Width:
_______________________
Septic
Permit
# ___________________
Applicant'sSignature:_______________________________________________________ Date:_________________
Applicant's Name: _________________________________________________________
Greene County Building and Zoning Department
ChuckWooley
BuildingOfficial
$____________ .20/sf
1034 Silver Dr., Ste 103, Greensboro, GA 30642 Telephone - (706) 453-3333 - FAX (706) 453-2579
www.greenecountyga.gov/building
Manufactured Home Permit
Process
DO
NOT
move the mobile/manufactured home into the county without
first getting your permit to avoid any penalties.
Address
-
If
you
need
an
address
assigned,
please
advise
our
office
when
applying
for
a
mobile/
manufactured
home
permit.
Greene County Building and Zoning Department
MANUFACTURED HOME
PERMITAPPLICATION
ChuckWooley
BuildingOfficial
Pre-owned
manufactured
home(s)
MUST
BE
INSPECTED
by
the
Building
Inspector/Code
Enforcement
officer
before
entering
the
county.
The
inspection
fee
is
$100.00
and
must
be
paid
in
advance.
Do
not
move
the
mobile/manufactured
home
into
the
county
without
first
getting
your
permit
to
avoid
any
penalties.
The
prospective
owner
must
comply
with
standards
for
install
of
Greene
County's
Code
of
Ordinances
Section
9.2.1.3
Application
Requirements
for
Building
and
Occupancy
Permits
for
Mobile
or
Manufactured
Homes.
The
minimum
square
footage
of
the
mobile/manufactured
home
being
moved
into
Greene
County
must
be
1,000
sf
unless
it
is
being
placed
in
a
mobile
home
park.
Check
the
property's zoning
to
make
sure
a
mobile/manufactured
home
is
allowed on the lot.
The
mobile/manufactured
home
must
NOT
be
put
on
the
lot
until
the
permit
is
approved .
A
$400
fine,
in
addition
to
any
other
permit
fees,
will
be
assessed
for
working
without
a
permit
if
this
occurs.
Putting
the
home
on
the
property
with
out
a
permit
does
NOT
guarantee
that
you
will
eventually
receive
a
permit
and
the
structure
may
have
to
be
removed
at
your
expense.
Electrical
Permit
-
This
must
be
permitted
from
the
Building
and
Zoning
Department.
Power
will
not
be
granted
until
all
code
requirements
have
been
met
at
and
a
Notice
of
Service
sent
to
the
power
company
by
the
Building
and
Zoning
Department.
1034 Silver Dr., Ste 103, Greensboro, GA 30642 Telephone - (706) 453-3333 - FAX (706) 453-2579
www.greenecountyga.gov/building
MANUFACTURED HOME
PERMIT APPLICATION
_______ Septic System Permit
_______ Plat of Property
_______ PT-41 or Bill of Sale
_______ Mobile Home Permit Application
Manufactured Home Checklist
The
applicant
must
provide
the
following:
If
you
are
going
to
have
a
new
septic
system
or
have
an
existing
system,
you
must
first
contact
the
Health
Department.
There
is
a
fee
for
this
service.
This
could
take
up
to
twenty
working
days
to
complete.
You
cannot
get
a
permit
from
us
until
we
have
a
copy
of
your
permit
from
them
or
a
copy
of
the
approval
for
the
existing
system.
The
Health
Department
can
be
reached
at
706-453-7561.
A
final
inspection
is
required
from
the
Health
Department
before
electricity
can
be
approved
for
the
home.
Chuck
Wooley
Building
Official
A copy of the plat of the property, indicating the setbacks and any existing structure(s). You can
obtain a copy of the plat from the Clerk of Superior Court office (706-453-3340). The fee is for
the
copy only.
PT-41
Form
from
mobile/manufactured
home
dealer.
If
you
are
buying
a
used
home
(other
than
at
a
dealership),
a
bill
of
sale
with
the
size,
serial
number,
year,
make,
model,
along
with
the
purchase
price
and
a
copy
of
the
paid
tax
bill
for
the
previous
year.
If
this
is
not
available,
the
previous
owner's
name,
address
and
the
county
where
the
home
is
located
must
be
provided.
_______ Tax ID Number for the Manufactured Home
You will need a Tax ID Number from the Tax Assessor’s office (706-453-3355).
Greene County Building and Zoning Department
A signed Mobile Home Permit Application with fee. The fee is $0.20/sf and can be calculated
by multiplying the total square feet of the home by $0.20. For example a 1,400/sf home would
have a fee of $280. (1,400 x .20 = $280) The application will be reviewed by the Building and
Zoning Department for fee accuracy.
_______ Deck Permit
If
building
a
landing
larger
than
3'x3'
from
the
two
(2)
exterior
doors
a
Deck
Permit
is
required.
1034 Silver Dr., Ste 103, Greensboro, GA 30642 Telephone - (706) 453-3333 - FAX (706) 453-2579
www.greenecountyga.gov/building
Address of project: _______________________________ City:_______________GA Zip:_________
_______ Electric Permit (Set up account at Power Company)
_______ Driveway Permit
(if
applicable)
_______ Address
Manufactured Home Checklist
Continued
MANUFACTURED HOME
PERMITAPPLICATION
An
Electrical
Permit
will
also
need
to
be
purchased
from
the
Building
and
Zoning
Department
prior
to
any
electrical
work
being
performed.
An
Electrical
Permit
Application
must
be
accompanied
by
a
copy
of
the
state
license
and
county
business
license
of
the
subcontractor.
You
will
be
given
a
Green
Permit
Card
with
the
mobile /manufactured
home
permit
number .
This
card
must
be
posted
at
the
driveway
entrance
so
it
can
be
seen
from
the
road.
The
Inspector
will
sign
the
card
after
each
inspection.
Inspections
will
not
be
performed
without
the
permit
card
present.
All
manufactured
home
installations
must
meet
the
Rules
and
Regulations
of
the
Office
of
Commissioner
of
Insurance
Safety
Fire
Division.
More
information
can
be
found
at
http://rules.sos.ga.gov/gac/120-3-7?urlRedirected=yes&data=admin&lookingfor=120-3-7
ChuckWooley
BuildingOfficial
County______
Road
- If
the
lot
is
located
on
a
county
road,
contact
the
Building
and
Zoning
Department
at
706-453-3333
and
submit
Greene
County's
Driveway
Permit
Application.
State______
Highway
- If
the
property
is
located
on
a
State
Highway,
you
must
contact
the
GA
State
DOT
office
at
706-343-5836
for
their
required
permit
application.
_______ Decal
You must register the home with the Tax Commissioner's Office. In order to register the home
you will need...
PT-41 or Bill of Sale
the Mobile Homer Permit Application from the Building and Zoning Department.
The Tax Commissioner's Office will issue a decal. We must have a copy of the decal before
we can issue a permit.
Greene County Building and Zoning Department
A Driveway Permit is required for any new driveways intersecting with a public or state right-of
-way before construction of the driveway.
If you need an address assigned, please advise the Building and Zoning Department when
applying for a mobile/manufactured home permit.
1034 Silver Dr., Ste 103, Greensboro, GA 30642 Telephone - (706) 453-3333 - FAX (706) 453-2579
www.greenecountyga.gov/building
MANUFACTURED HOME
PERMIT APPLICATION
ChuckWooley
BuildingOfficial
Greene County Building and Zoning Department
***See note below regarding auxiliary structures.****
Rule 120-3-7-.18 Installation Instructions
(16) Miscellaneous.
(b) Auxiliary Structures: All auxiliary structures (such as porches, decks,
awning, cabanas, stairs, etc., unless provided and approved by the
manufacturer) shall be entirely self- supporting, unless designed and
approved by a professional engineer or registered architect. All such
structures shall be constructed in accordance with the Georgia State
Building Codes or local authority having jurisdiction.
RULES
AND
REGULATIONS
OF
THE
OFFICE
OF
COMMISSIONER
OF
INSURANCE
SAFETY
FIRE
DIVISION
CHAPTER
120-3-7
Rules
and
Regulations
for
Manufactured
Homes
1034 Silver Dr., Ste 103, Greensboro, GA 30642 Telephone - (706) 453-3333 - FAX (706) 453-2579
www.greenecountyga.gov/building
Address of project: _______________________________ City:_______________GA Zip:_________
MANUFACTURED
HOME
PERMIT
APPLICATION
Manufactured Home Inspections
Greene County Building and Zoning Department
ChuckWooley
BuildingOfficial
1st Inspection - Footing: This inspection is performed after the lot has been cleared and graded and before
the footings are ready to be poured. All vegetation must be removed from under where the home is to be
placed. Before electricity will be connected, the lot must be graded so that no water will run under the
house.
2nd Inspection - Set-up: This inspection is performed after the home has been tied down, bonding (if a
double-wide), HVAC, electrical and plumbing must be completed, and the septic tank must be hooked up.
No underpinning may be installed at this inspection. Spacing and location of piers and pads shall be per
manufacturer’s specifications. All other foundations and tie-down requirements shall meet the Georgia
State specification for mobile/manufactured housing according to the Georgia Department of Community
Affairs.
3rd Inspection - Certificate of Occupancy: This inspection is performed when the home is complete and
ready for electrical service. Per Section 9.2.1.3 of the Greene County Code of Ordinances, the following
items must be completed.
Brick
or
masonry
skirting
must
be
installed.
Vinyl
and/or
lattice
will
not
be
approved.
A
minimum
3
x
3
pre-fabricated
or
permanent
landing
with
steps
constructed
of
pressure
treated
lumber,
masonry
or
metal
sufficient
to
provide
safe
ingress
and
egress
from
two
(2)
exterior
doors
of
the
unit.
Individual
landings
shall
meet
Greene
County
building
codes. Any landing larger than a
3'x3' must have a Deck Permit on file.
If
over
30”
above
ground
grade,
rails
are
also
required.
Water
must
be
connected
to
mobile/ manufactured
home.
The
final
inspection
from
the
Health
Department
for
sewage
system
must
be
complete
and
on
file
in
our
office.
Once
all
inspections
are
complete
and
approved,
the
Building
and
Zoning
Department
will
send
a
notice
of
service
to
Rayle
or
GA
Power.
A
CO
will
be
issued
at
this
time.
1034 Silver Dr., Ste 103, Greensboro, GA 30642 Telephone - (706) 453-3333 - FAX (706) 453-2579
www.greenecountyga.gov/building
PERTINENT CODE SECTIONS
Sec. 7.1. - A1 Agricultural District (Intensive Farming).
This zoning district is comprised primarily of open farm land and land used for intensive
agricultural and livestock and poultry production. The intent of the regulations is to encourage the
maintenance of the general rural character of openness and discourage the subdivision of land that
is better suited to agricultural usage. Residential subdivisions are inappropriate in this district. A
farm or farming operation shall not be found to be a public or private nuisance if the farm or farm
operation alleged to be a nuisance conforms to generally accepted agriculture and management
practices. The intent of this ordinance is to prevent the non-agricultural resident from encroaching
on existing, approved, or projected expansion of farms or farming operations.
7.1.1 Permitted Uses. Within the A1 District, only the following uses are permitted:
7.1.1.2 Individual manufactured home.
Sec. 7.2. - A2 Agricultural-Residential District.
This zoning district is composed primarily of limited agricultural activities in areas where
compatible low density, rural, single-family residential development has occurred or is occurring.
The regulations for this district are designed to provide the landowner an opportunity to engage in
limited hobby type agricultural activities for personal use, with the exception of fresh fruits,
flowers or vegetables raised on the property that may be sold to the public. A farm or farming
operation shall not be found to be a public or private nuisance if the farm or farm operation alleged
to be a nuisance conforms to generally accepted agriculture and management practices. The intent
of this ordinance is to prevent the non-agricultural resident from encroaching on existing,
approved, or projected expansion of farms or farming operations
7.2.1 Permitted Uses. Within the A2 District, the following uses are permitted:
7.2.1.2 Individual manufactured home.
Sec. 7.13. - RM Multi-Family Residential District.
The RM District is composed of areas with existing or proposed high density residential use.
The ordinance is designed to accommodate open space, convenience services, and community
facilities needed for high density living.
7.13.1 Permitted Uses. Within the RM District, only the following uses are permitted:
7.13.1.5 Individual manufactured home.
Greene County Building and Zoning Department
Sec.
9.2.
-
Individual
manufactured
homes
and
mobile
homes.
Greene County Building and Zoning Department
9.2.1
Individual
Mobile
Homes
or
Individual
Manufactured
Homes.
Individual
mobile
or
manufactured
homes
not
meeting
the
definition
of
Dwelling ,
Single-Family,
shall
comply
with
the
following
and
other
applicable
sections
of
this
ordinance:
9.2.1.1
Limitations.
Any
pre-owned
mobile
home
or
manufactured
home,
as
defined
in
this
ordinance, intended
for
use
as
a
residential
dwelling
shall
be
required
to
meet
the
requirements
of
the
Greene
County
Ordinance
for
the
Minimum
Health
and
Safety
Standards
for
Pre-Owned
Manufactured
Homes
if
the
unit
is
to
be
moved
into
or
to
another
location
within
Greene
County.
The
attachment
of
a
mobile
or
manufactured
home
to
an
existing
mobile
or
manufactured
home
is
permitted
only
if
both
units
were
engineered
and
manufactured
for such attachment.
9.2.1.2
Building
and
Occupancy
Permits.
Building
and
Occupancy
Permits
issued
by
the
Greene
County
Building
Official
or
his/her
authorized
agent
are
required
for
any
mobile
or
manufactured
home:
1.
That
is
hereafter
located
to
Greene
County;
2.
That
is
moved
from
one
location
to
a
second
location
within
the
county
where
that
manufactured
housing
unit
will
house
persons
or
property;
3.
Which
has
not
been
occupied
within
the
preceding
six
(6)
months;
4.
That
there
is
a
change
in
use
of
the
manufactured
housing
unit;
or
5.
if
the
mobile
or
manufactured
home
is
added
to
or
structurally
altered
100
sq.
ft.
or
more.
9.2.1.3
Application
Requirements
for
Building
and
Occupancy
Permits
for
Mobile
or
Manufactured
Homes.
An
application
for
permits
for
location
and
occupancy
of
a
mobile
or
manufactured
home
is
required
to
be
filed
by
the
owner
or
the
owner 's
agent
in
the
office
of
the
Greene
County
Building
Official
before
a
Building
or
Occupancy
Permit
is
issued.
A
building
permit
shall
not
be
issued
for
a
mobile
home
containing
aluminu
m
wiring.
Prior
to
issuing
a
building
permit,
it
is
unlawful
to
move,
locate,
relocate,
erect
or
make
utility
connections
of
any
kind
to
a
mobile
or
manufactured
home
in
unincorporated
Greene
County.
All
mobile
and
manufactured
homes
must
be
registered
with
the
Greene
County
Tax
Commissioner
and
approval
of
the
septic
system
by
the
Greene
County
Health
Department
must
be
obtained
before
an
Occupancy
Permit
can
be
issued.
Prior
to
issuing
an
occupancy
permit
it
is
unlawful
to
occupy
or
otherwise
use
as
a
residence
a
mobile
or
manufactured
home
in
unincorporated
Greene
County.
The
permit
application
shall
describe
the
mobile
or
manufactured
home
as
to
size,
dimension,
year,
model,
the
zoning
district
and
tax
map
and
parcel
number
of
the
planned
location
of
the
mobile
or
manufactured
home,
the
intended
use
of
the
mobile
or
manufactured
home,
the
name
of
the
owner
and
the
name
of
the
intended
occupants,
and
the
source
of
water
and
type
of
waste
disposal
system.
9.2.1.4
Temporary
Usage.
A
manufactured
home
may
be
used
as
an
office
in
a
subdivision ,
by
a
contractor
during
construction
or
development.
In
other
than
a
subdivision,
a
manufactured
home
may
be
used
as
a
temporary
residence
during
the
reconstruction
of
a
permanent
residence
which
has
been
destroyed
by
fire,
natural
disaster
or
condemnation.
All
of
the
above
uses
must
be
requested
in
writing,
be
for
a
period
not
to
exceed
twelve
(12)
months,
and
have
written
approval
of
the
Planning
and
Zoning
Board .
The
Planning
and
Zoning
Board
may
extend
the
twelve
(12)
month
period
one
time
where
necessary
for
up
to
an
additional
six
(6)
month
period.
Manufactured
homes
may
be
permitted
on
a
lot
in
the
A1
and
A2
zoning
districts
which
contains
another
residential
dwelling
in
the
case
of
health
hardship
provided:
1.
The requirements of Article VIII are met;
2.
All setback requirements are met;
3.
There is only one such use per lot;
4.
A special permit is issued by the Zoning Administrator. The permit must be renewed
annually upon presenting sufficient evidence of such medical hardship as stated in
the original application still exists; and
5.
When the medical hardship originally applied for no longer exists, the Zoning
Administrator will be so notified by the property owner, the special permit will be
withdrawn and the manufactured home removed from the property within sixty (60)
days of the permit withdrawal date or expiration date, whichever occurs first. The
Planning and Zoning Board is authorized to extend the sixty (60) day limit one time
for an additional sixty (60) days for sufficient cause.
Greene County Building and Zoning Department
A site plan showing the location of the mobile or manufactured home , water source ,
septic tank and the primary and alternate drain field will be included with the permit
application.
If the intended use of the mobile or manufactured home is as an accessory use, hardship
use or farm caretaker , then details of such proposed use shall be provided by the
applicant.
Mobile and manufactured homes shall be provided with prefabricated or permanent
stairs and a minimum three (3) feet x three (3) feet landing , constructed of pressure
treated lumber, masonry or metal sufficient to provide safe ingress and egress from two
(2) exterior doors of the unit. Individual or larger landings shall be permitted and meet
Greene County building codes . All mobile and manufactured homes must be
underpinned by a permanent foundation; and meet all other applicable state and county
statutes, regulations and ordinances.
1.
The
requirements
of
Article
VIII
are
met;
2.
All
setback
requirements
are
met;
3.
There
is
only
one
such
use
per
lot;
4.
A
special
permit
is
issued
by
the
Zoning
Administrator.
The
permit
must
be
renewed
annually
upon
presenting
sufficient
evidence
of
such
medical
hardship
as
stated
in
the
original
application
still
exists;
and
5.
When
the
medical
hardship
originally
applied
for
no
longer
exists,
the
Zoning
Administrator
will
be
so
notified
by
the
property
owner,
the
special
permit
will
be
withdrawn
and
the
manufactured
home
removed
from
the
property
within
sixty
(60)
days
of
the
permit
withdrawal
date
or
expiration
date,
whichever
occurs
first.
The
Zoning
Administrator
is
authorized
to
extend
the
sixty
(60)
day
limit
one
time
for
an
additional
sixty
(60)
days
for
sufficient
cause.
Sec.
9.4.
-
Manufactured
home
installation.
Greene County Building and Zoning Department
9.2.1.5
Accessory
Buildings.
A
mobile
or
manufactured
home
may
be
used
as
an
accessory
building
in
the
A1
and
A2
zoning
districts
provided:
1.
All
appliances,
beds,
lavatories
and
furniture
have
been
removed;
2.
No
more
than
one
such
building
is
permitted
per
lot
or
parcel;
3.
The
building
is
located
between
the
principal
building
(or
any
other
structure
used
as
a
residence)
and
the
rear
of
the
lot,
but
no
closer
than
one
hundred
fifty
(150)
feet
from
the
centerline
of
the
street
providing
access
to
the
lot
or
parcel;
4.
The
building
meets
the
side
and
rear
lot
setbacks
of
the
district
where
located;
5.
The
building's
physical
condition
is
in
keeping
with
other
such
accessory
buildings
in
the
surrounding
area;
6.
The
building
is
supported
and
tied
down
and
underpinned
by
a
permanent
foundation
in
such
a
manner
as
not
to
present
a
safety
or
health
risk
as
determined
by
the
Building
Official,
but
in
no
case
shall
there
be
less
than
three
(3)
diagonal
(frame)
ties
on
each
side
or
two
(2)
over
the
roof
ties,
properly
anchored;
7.
Any
required
electrical
connection
to
an
outside
power
source
must
be
inspected
and
approved
by
the
Building
Official
or
his/her
authorized
agent;
8.
The
building,
if
observable
from
any
street,
requires
a
vegetative
buffer
to
be
planted
between
the
street
and
building;
and
9.
The
building
is
not
used
for
human
occupancy.
9.2.2
Manufactured
Home
Subdivisions/Manufactured
Home
Parks.
Manufactured
home
subdivisions
and
manufactured
home
parks
hereafter
developed
or
expanded
either
by
an
increase
in
acreage
or
in
the
number
of
dwelling
units
must
comply
with
the
Greene
County
Subdivision
Regulations
and
this
ordinance.
9.4.1
Installation.
All
manufactured
homes,
located
to
or
moved
within
Greene
County,
Georgia,
at
or
after
the
adoption
of
this
ordinance
shall
be
installed
and
permitted
by
a
licensed
installer
as
required
by
O.C.G.A.
§
8-2-164,
and
in
accordance
with
the
applicable
manufacturer's
installation
instructions,
specifically
including,
without
limitation,
correctly
installed
tie-downs
and
anchors.
In
the
absence
of
such
instructions,
installations
shall
be
performed
in
accordance
with
the
applicable
rules
and
regulations
adopted
by
the
Georgia
Safety
Fire
Commissioner.
(See
O.C.G.A.
§
8-2-160
et
seq.)
9.4.2
Penalties
for
Improper
Installation.
Failure
by
the
owner
of
a
manufactured
home
to
obtain
and
utilize
tie
downs
and
anchors
for
his
manufactured
home
or
modular
home
placed
in
Greene
County,
Georgia,
after
the
effective
date
of
this
ordinance
shall
constitute
a
misdemeanor,
punishable
by
a
fine
of
not
more
than
$500.00.
9.4.3
Home
Orientation.
All
manufactured
homes
are
subject
to
the
following
conditions:
9.4.3.1
No
manufactured
home
shall
be
located
within
thirty
(30)
feet
of
any
permanent
type
of
building.
9.4.3.3
All
manufactured
homes
shall
meet
the
adopted
building,
gas,
plumbing,
electric,
and
other
codes
and
ordinances
of
Greene
County,
Georgia.
9.4.3.4
No
manufactured
home
shall
be
allowed
to
be
occupied
in
Greene
County,
Georgia,
unless
it
bears
an
insignia
issued
by
the
United
States
Department
of
Housing
and
Urban
Development,
and
the
Building
Official
or
his/her
authorized
agent
of
Greene
County,
Georgia,
finds
that
the
manufactured
home
is
in
compliance
with
all
Greene
County,
Georgia
building
codes,
housing
codes,
mechanical
codes,
plumbing
codes,
gas
codes ,
electrical
codes,
fire
prevention
codes
and
all
ordinances
of
Greene
County,
Georgia.
However,
a
manufactured
home
that
has
been
continuously
and
legally
located
in
Greene
County,
Georgia
shall
be
allowed
to
remain
if
the
following
conditions
are
met:
1.
All
ad
valorem
taxes
on
the
manufactured
home
have
been
timely paid
in
full;
2.
The
Building
Official
or
his/her
authorized
agent
of
Greene
County ,
Georgia
finds
that
the
manufactured
home
is
in
compliance
with
all
applicable
federal,
state,
and
local
codes.
9.4.3.5
Non-conformance.
Any
manufactured
home
which
does
not
meet
the
requirements
in
the
above
paragraphs
shall
be
removed
after
receipt
of
notice
of
its
non-conformance
from
the
Zoning
Administrator.
Greene County Building and Zoning Department
9.4.3.2 The manufactured home unit must be located on a permanent foundation that
completely encloses the undercarriage, and the unit must be connected to
water
and
sewerage in compliance with the applicable ordinance of Greene
County.
ARTICLE VIII. - AREA, YARD AND HEIGHT REQUIREMENTS
[Sec. 8.1. - Generally.]
This Article is established to show the minimum size, width, and maximum height requirements for
the land uses within each designated district. Lot size shall be based on factors including the size of the
building required for that use, required parking, and ground water flow. The Planning and Zoning Board is
authorized to increase minimum lot sizes and otherwise vary district development standards to
accommodate the need to use septic tanks and/or wells and Health Department regulations in this regard.
The unavailability of public sewer and/or water shall preclude the ability to develop projects which cannot
utilize septic tanks.
District
Minimum Lot Size
See Note
4
Min. Sq. Ft.
per Dwelling
Unit/Min.
Heated Floor
Area
Minimum Yard Requirements
Maximum
Height of
Building
(Feet)
Note
5
Lot
Area
(sq.
ft.)
Lot Size
per
Dwelling
Unit
Lot
Width
(ft.)
Front setback
edge of ROW
Minimum
Side
Yard
Minimum
Rear
Yard
Arterial
and
Collector
Other
Streets
A1/A2
1
65,340 65,340 150 1,000/1,000 50 30 20 40 40
1
R1/LR1
3
without
W or S
65,340 65,340 125 1,000/1,000 40 30 20 40 40
with W
or S
32,670 32,670 125 1,000/1,000 40 30 20 40 40
with W
and S
15,000 15,000 125 1,000/1,000 40 30 20 40 40
R2/LR2
3
One unit
without
W or S
65,340 65,340 100 1,000/1,000 40 30 15 30 40
with W
or S
32,670 32,670 100 1,000/1,000 40 30 15 30 40
with W
and S
15,000 15,000 100 1,000/1,000 40 30 15 30 40
FOR REFERENCE:
65,340/sf = 1.5 acres
32,670/sf
= .75 acres
Greene County Building and Zoning Department
Two
units
without
W or S
65,340 65,340
100
1,000/1,000
40 30 15 30 40
with W
or S
32,670 32,670
100
1,000/1,000
40 30 15 30 40
with W
and S
20,000 10,000
100
1,000/1,000
40 30 15 30 40
RM
2
One unit
without
W or S
32,670 32,670
100
600/600 50 30 20 20 40
with W
or S
20,000 20,000
100
600/600 50 30 20 20 40
with W
and S
15,000 15,000
100
600/600 50 30 20 20 40
Two
units
without
W or S
32,670 15,000
100
600/600 50 30 20 20 40
with W
or S
20,000 10,000
100
600/600 50 30 20 20 40
with W
and S
15,000 7,500 100
600/600 50 30 20 20 40
B1 50 30 20 20 40
B2 50 30 20 20 40
LI/HI/C3
50 50 20 20 40
1
LP
3
50 30 20 20 40
LC
3
50 30 20 20 40
Greene County Building and Zoning Department
S - Public or community sewerage system
W - Public or community water system
1
Excludes buildings for agriculture use
2
All multi-family development must comply with section 9.5
3
No permanent structures allowed within 65 feet of water line at normal level
4
For lots lying by Lake Oconee with on-site sewage management systems, lot sizes shall be exclusive of
that portion of lot lying within 75 feet of the high water line of Lake Oconee
5
Excludes church steeples
Greene County Building and Zoning Department