FEE SCHEDULE
Effective January 1, 2016
After the Fact Penalty / Double the Fee
INDUSTRIAL: Cost of Construction (Labor & Materials)
New industrial related establishments $250.00
plus $5.00 per $1,000 cost of construction
Additions/Alterations to existing industrial buildings $150.00
plus $5.00 per $1,000 cost of construction
Accessory buildings for existing industrial property $150.00
plus $5.00 per $1,000 cost of construction
Electrical & Plumbing - new, remodeling over $500.00 $150.00 (each)
COMMERCIAL: Cost of Construction (Labor & Materials)
New commercial/business buildings and/or uses $250.00
plus $5.00 per $1,000 cost of construction
Additions/alterations to existing commercial buildings $150.00
plus $5.00 per $1,000 cost of construction
Accessory buildings for existing commercial property $150.00
plus $5.00 per $1,000 cost of construction
Electrical & Plumbing - new, remodeling over $500.00 $150.00 (each)
RESIDENTIAL: Cost of Construction (Labor & Materials)
New residential, replacement, relocated, mobile homes $175.00
plus $25 per 500 sq. ft. of floor area in excess of 1,000 sq. ft.
Additions/Alterations
Habitable $ 75.00
plus $25 per 500 sq. ft. of floor area in excess of 500 sq. ft.
Non-habitable $ 75.00
(For new dwellings & habitable additions see schedule on back sheet)
Accessory buildings
100 sq. ft. to 500 sq. ft. $ 75.00
501 sq. ft. to 1,500 sq. ft. $ 150.00
1,501 sq. ft. and larger $ 250.00
Additions/alterations to existing accessory buildings $ 50.00
Residential Electrical & Plumbing - new, remodeling over $500.00 $ 75.00 (each)
MISCELLANEOUS:
Filling, grading, land use-as a separate use $ 300.00
(Grading of more than 10,000 sq. ft.)
Certified Survey Map Review (Must have County approval first) $ 50.00
Fence $ 50.00
Outdoor Heating Units $ 50.00
DWELLINGS: onsite constructed, manufactured, and mobile homes
Fee is based on total square footage of habitable area. Include second story, third story and loft. Include basements on
tri-plexes or walkouts where the below grade level is heated. Do not include open decks, roofed or screened in porches,
unheated entryways, unheated breeze-ways or attached garages.
C
onditional Use (Planning Commission) $400.00
Zoning Change (Planning Commission) $400.00
Plus actual cost of publication of ordinance
Variance (Board of Appeals) $450.00
Sheet 3 of 4