CONTRACTOR PERMIT NUMBER
CONTACT NAME CONTACT NUMBER
JOB ADDRESS
STRUCTURAL
Foundation
Exterior Framing
Wall Sheathing
Columns
Tie Beam
Truss/Rafters
Roof Sheathing
Interior Framing
Bucks
Windows/Doors in progress
Insulation
Rock Base/ Forms
Drywall/Screw
Wire Lath
Pool Steel
Ceiling Grid
Above Ceiling Penetrations
Drive way
Tin Cap and Accessories
Mop in Progress
Tile/Shingle in Progress
Garage door
Shutters
Final Pool
Final Fence
Final Roof
Final windows/doors
Demolition
Other__________________
Final
ZONING
Fence
Pool
Rock Base/Forms
Driveway
Slab/Deck/Patio
Dock/Seawall
Sign
Other__________________
Final
PLUMBING
Rough
Water Service
Second Rough
Top Out
Fire Sprinkler Final
Roof Drains
Gas-rough Inside
Gas-rough Outside
200 PSI Test
LP tank
Well
Lawn Sprinkler Rough
Sewer Hook-up
Main Drain
Pool Piping
Backflow Preventer
Interceptor
Catch Basins
Condensate Drains
Medical Gas
Gas Final
Lawn Sprinkler Final
Demolition
Other________________
FINAL
MECHANICAL
Underground Piping
Condensate Drains
Rough Ductwork
Exhaust Fans/Dryers
Fire Dampers
Smoke Dampers
Ceiling Radiation Damper
Hood Systems Rough
Refrigerator/Walk Cooler/
Freezer
Boiler
Tanks Above Ground
Tanks U
nderground
Demolition
A/C Change Out
Spray Booths
Chimneys and Vents
Cooling Towers/ Chiller
Systems
Process Piping
Fireplace Rough/ Ventilation
Fireplace Final
Hood Systems Final
Other__________________
Final
Electrical
Meter Repair
Temporary Pole
30 day Temporary
Pool Grounding
Underground Rough
Slab Grounding
Rough
Ceiling Rough
Telephone Rough
Telephone Final
Television Rough
Intercom Rough
Sound Rough
Central vacuum Rough
Service Upgrade
Miscellaneous Repairs
Pool Niche Light
Wall Rough
Generator Rough
Fire Alarm Rough
Television Final
Intercom Final
Alarm Final
Sound Final
Central Vacuum Final
Demolition
Other__________________
Final
Other not included
• VISIT OUR ONLINE PORTAL TO SCHEDULE YOUR INSPECTION
• INSPECTION REQUEST SHALL BE SUBMITTED PRIOR TO 3:00 PM FOR INSPECTION THE NEXT DAY
• PLEASE CALL BEFORE 9:00 AM THE MORNING OF THE INSPETION FOR A TIME FRAME OR TO CANCEL THE INSPECTION
• ALL NEW CONSTRUCTION, AND ADDITIONS; A SLAB SURVEY AND ELEVATION CERTIFICATE SHALL BE SUBMITTED AND APPROVED
PRIOR TO A COLUMN OR TIE BEAM INSPECTION.
• SWIMMING POOLS, SHALL HAVE A SPOT SURVEY APPROVED AFTER THE POOL IS GUNITED AND PRIOR TO PERIMITER PLUMBING
PRESSURE TEST INSPECTION.
• A FINAL SURVEY IS REQUIRED PRIOR TO POOL BARRIER INSPECTION, DECK AND PERIMETER FENCE INSPETION AND FINAL
ELECTRIC INSPECTION PRIOR TO MARSITING THE POOL