HILLSBOROUGH COUNTY PUBLIC UTILITIES
WORKSHEET FOR COMMERCIAL IRRIGATION METER REQUEST
Return this Worksheet with a detailed site plan depicting the irrigation system, the potable water service, and all
proposed modifications to the systems therein. See Notes on back of form.
___ New Project SR#: ___________________ Multi-family ___ Commercial ___ Common Area ___ Industrial
___ Existing Project Account #:____________ Multi-family ___ Commercial ___ Common Area ___ Industrial
Name on Account/ Project Name: Service Request #: (if new development)
Project Location: Folio Number:
Billing Account Name: Type of Business or Facility:
MailingAddress: TIN/EFIN:
Contact Person:
Daytime Phone #:
Street Address of Meter or Service (see notes):
Pressure Requirement: _________ psi
Total Area of Property: ______ Acres __________ SF
Water Requirement:
Net Irrigable Area: ______ Acres __________ SF
(See note 1)
Average Daily Use: ___________ GPD
Peak Use: ________ GPD ________GPM
Anticipated Meter/Service Size: _______ Inch
(See note 3 for Irrigation requirements)
Hours per Day: ______ Hours
Current source of water for irrigation : _____________________ From ____ am/pm to ____ am/pm
Potable (drinking) water wells on site: ____ yes ____ no Days per Week:____; Weeks per Year:___
If yes, please indicate on attached irrigation plan.
GPD = Gallons per Day
GPM = Gallons per Minute
Comments:
________________________________________________
(Print – Authorized Representative/Title)
_________________________________________________
(Address)
_________________________________________________
(City / State / Zip) (Phone)
Return completed form to:
WaterDept@HillsboroughCounty.Org
NW Service Availability Team
Hillsborough County Water Dept.
15610 Premiere Dr.
Tampa, Florida 33624
____________________________________________________ ______________________________
(Signature) (Date)
click to sign
signature
click to edit
C:\Users\macdonaldt\Desktop\TMIrrigation.doc 01/20/12
Notes:
(1) Net Irrigable Area determined by subtracting total impervious area (buildings, parking lots, streets, driveways, patios, tennis
courts, etc.) from the total site acreage.
(2) Street Address of Meter or Service: Use permitted established street address of site. However, if multiple meters are
needed or the meter address is not evident, the Permit Clerk in the Development Services Division will obtain an address
during the Process of obtaining a plumbing permit. (See Item 3 in cover letter.)
(3) The table below illustrates the information needed to determine total flow in terms of rate and average daily flow and
determine meter size.
Example:
Zone
Area
(SF)
Number of
Sprinkler
Heads
GPM per
Sprinkler
Head
Total GPM
per Zone
Minutes
per Zone
per Day
Total
GPD
per
Zone
Number of
Days
p/Week
Gallons
per Week
per Zone
Average
Gallons
per Day
A 4500 20 3.0 60 25 1,500 2 3,000 429
B 1800 30 0.5 15 20 300 3 900 129
C 8000 36 3.0 108 20 2,160 2 4,320 617
Total 14,300
183 3,960 8,220 1,175
Determine Peak Gallons per Minute (GPM): Zones A + B operating together = 60 + 15 = 75 GPM; Zone C operating separately = 108
GPM. Therefor meter is sized for Zone C at a peak rate of 108 GPM: Meter requirement: 2-inch meter.
Complete table listing each zone, the number of sprinkler heads per zone, the flow rate (GPM) of each sprinkler head, total
GPM for each zone, etc. Determine maximum rate (GPM) by identifying which zones are operating together.
Zone
Area
(SF)
Number of
Sprinkler
Heads
GPM per
Sprinkler
Head
Total GPM
per Zone
Minutes
per Zone
per Day
Total
GPD
per
Zone
Number of
Days
p/Week
Gallons
per Week
per Zone
Average
Gallons
per Day
Total
Peak GPM = Zones operating together totaling the maximum instantaneous flow rate (GPM) =
Zone ____ + Zone ____ + Zone ____ = ____ GPM + ____ GPM +____ GPM = ____ GPM peak