Georgia Residential Energy Code Compliance Certificate*
Builder/Design
Professional:
Phone:
Envelope Summary:
List the R-Value for the following components:
Flat ceiling/roof: Sloped/vault ceiling:
Exterior wall: Above grade mass wall:
Attic kneewall:
Attic kneewall sheathing:
Basement stud wall: Basement continuous:
Crawlspace stud wall:
Crawlspace continuous:
Foundation slab: Floors over unconditioned space:
Cantilevered Floor: Other insulation:
Fenestration Components:
Window U-factor: Window SHGC:
Skylight U-factor: Skylight SHGC:
Glazed Door U-factor:
(<50% glazed)
Building Envelope Tightness (BET):
BET test conducted by: _________________________________ Phone:____________
Fan Flow at 50 Pascals=____________CFM
50
Total Conditioned Volume =____________ft
3
ACH
50
= CFM
50
x 60 / Volume= __________________ ACH
50
(must be less than 7 ACH
50
)
Low Rise Multifamily Visual Inspection Option
(The visual inspection option may be conducted by a third-party instead of the BET test for R-2 buildings only.)
Visual inspection conducted by: ___________________________________Phone:___________
Mechanical Summary:
Water Heater Energy Factor: ______ ___Ef Fuel type: Gas Electric Other
Number of Heating and Cooling Systems: ______
Heating System Type (choose one):
Gas: __________ AFUE Air-Source Heat Pump: _________ HSPF
Other: ________________ Efficiency: __________
Cooling System Type (Standard DX, Heat Pump, Geothermal, etc.):______________
Cooling System Efficiency: ________________ SEER EER Other
Heating/Cooling Load Calculations Performed by: ____________________Phone: __________
Total Heating Load
(Based on ACCA Man. J or other approved methodology):____________ Btu/h
Total Cooling Load
(Based on ACCA Man. J or other approved methodology):____________ Btu/h
Cooling Sensible Load:_____________
Btu/h Cooling Latent Load :__________ Btu/h
Total Air Handler CFM
(based on design calculations):_________________CFM
Duct Tightness Test Conducted by:
______________________ Phone:___________
CFM
25
per 100 ft
2
of conditioned floor area = CFM
25
x 100 / Conditioned floor area served
If all ducts are not located within conditioned space, builder must verify that either the postconstruction duct leakage to outdoors
(PCO) is 8 cfm/100 ft
2
, the post construction total duct leakage (PCT) is 12 cfm/100 ft
2
, or the rough-in test (RIT) with air
handler installed is 6 cfm/100 ft
2
. State which method was used to conduct the duct tightness test:
duct blower (DB), modified blower door subtraction method (MBDS), or automated multipoint blower door (AMBD).
System
Method (DB, MBDS, AMBD) Test (PCO, PCT, RIT)
CFM
25
Area served (ft
2
) Test Result
1
2
3
*Note: This permanent certificate shall be posted on or in the electrical distribution panel. Certificate
shall be completed by the builder or registered design professional. Where there is more than one
value for each component, certificate shall list the value covering the largest area.