CLINTON COUNTY
SECONDARY ROAD DEPARTMENT
TILE CROSSING/OUTLET PERMIT
This permit allows the applicant the right to have a drainage tile constructed within the right-of-
way of a Clinton County secondary road subject to the following conditions:
1. All work must be performed in accordance with the Clinton County Secondary Road
Ditch Cleaning and Tile Crossing Policy.
2.
The landowner is responsible for ensuring that all work complies with wetland legislation
as determined by the Natural Resources Conservation Service and/or the Corps of
Engineers and obtaining all necessary permits. Clinton County will not review or
coordinate these activities on the landowner's behalf.
3.
Schedule 40 PVC pipe or corrugated metal pipe shall be used for all crossings. Drop
inlets or risers are required five feet inside of the ROW line. Any material or labor to be
billed to the county must be pre-approved in writing and separate from any billing for
other work completed. Private individuals or their contractors installing tile must have an
approved permit and notify the county 48 hours in advance of the crossing installation.
Finished tile must be inspected prior to placement of backfill.
4.
The county will provide any rock necessary to restore the condition of the road surface.
The landowner will be responsible for the material and labor cost for repair or
replacement of paved surfaces on new tile line installations.
5.
No filling will be permitted in the right-of-way other than that necessary to maintain the
natural flow of surface water.
6.
Stipulations and requirements contained herein are not intended to waive greater
requirements of local zoning ordinances.
7.
Tile size:__________ Location:___________________________________________
Material Type:_________________________________________________________
Signed________________________________ Date_________________________
(Applicant)
Address______________________________________________________________
Approval_______________________________ Date_________________________
(County Engineer)
Note: Construction in ROW Permit Also Required.