CS13.1 C Page 1 of 1 Last Updated: 27/09/2018
Revision: 2
CS13.1 Construction of Building on 2 or
more Allotments Checksheet
(ref TS13 and TS19)
Building Consent Number:
Assessment Completed by:
Date:
No
Yes
No
Yes
No
No
Yes
No
Yes
No
Yes
No
No
Yes
Does the PIM/PIC or other process/checks
identify s75 as being relevant?
Is the building work for
1
:
Construction of a new building?
Extension of an existing building over
allotment boundaries
Are the allotments held by the owner in
fee simple
2
?
Does the owner proposed to construct party
wall(s) on the boundary/boundaries?
Does the owner intend to redesign the building
to remove s75 requirement?
Building Consent condition
of grant #42 s77(5)
Has the owner applied to the Registrar-
General of Land under s82?
s75 Construction of Building on 2 or
more allotments not relevant
Consent application to be
considered under s49
Yes
Yes
Has a certificate imposing condition under
s75(2) been received from the owner?
AF13.1
3
Request certificate from owner
1
MBIE Determination: 2014/028 and 2015/036
2
MBIE Determination: 2017/015
3
Authority to Issue Manager Building Services