PLUMBING APPLICATION
PROPERTY ADDRESS
Town or
Plantation
Street or
Subdivision Lot #
PROPERTY OWNER(S) NAME
Last: First:
Applicant
Name:
Mailing Address of
Owner/Applicant
(if Different)
Owner/Applicant Statement
I certify that the information submitted is correct to the best of my
knowledge and understand that any falsification is reason for the
Local Plumbing Inspector(s) to deny a permit.
_____________________________________
Signature of Owner/Applicant Date
Department of Health and Human Services
Division of Environmental Health
Town/City ____________________________ Permit # ___________
Date Permit Issued ___/___/___ Fee: $__________ Double Fee Charged [ ]
__________________________________L.P.I. # ______________
Local Plumbing Inspector Signature
_________________________________________________________
The Internal Plumbing Fixtures and Piping shall not be installed until a
Permit is issued by the Local Plumbing Inspector. The Permit shall
authorize the owner or installer to install the plumbing system in
accordance with this application and the Maine Subsurface Wastewater
Disposal Rules.
________________________________________________________
Caution: Inspection Required
I have inspected the installation authorized above and found it to be in compliance
with the Maine Plumbing Rules Application.
______________.
Date Approved (Rough-in)
__________________________________ ______________
LPI Signature Date Approved (Final)
PERMIT INFORMATION
This Application is for
1. NEW PLUMBING
2. RELOCATED PLUMBING
Type of Structure to be Served
1. SINGLE FAMILY RESIDENCE
2. MODULAR OR MOBILE HOME
3. MULTIPLE FAMILY DWELLING
4. OTHER-SPECIFY _______________
Plumbing to be Installed by:
1. MASTER PLUMBER
2. OIL BURNERMAN
3. MFG'D HOUSING DEALER / MECHANIC
4. PUBLIC UTILITY EMPLOYEE
5. PROPERTY OWNER
LICENSE # |__|__|__|__|__|__|__|__|__|__|
Hook-Up & Piping Relocation
Maximum of 1 Hook-Up
Column 2
Number Type of Fixture
Column 1
Number Type of Fixture
|__|__| HOOK-UP: to public sewer by
|__|__| Hosebib / Sillcock
|__|__| Bathtub (and Shower)
those cases where the connection
|__|__| Floor Drain
|__|__| Shower (separate)
is not regulated and inspected by
|__|__| Urinal
|__|__| Sink
the local sanitary district.
|__|__| Drinking Fountain
|__|__| Wash Basin
|__|__| Indirect Waste
|__|__| Water Closet (Toilet)
|__|__| HOOK-UP: to an existing subsurface
|__|__| Water Treatment Softener, Filter, Etc.
|__|__| Clothes Washer
wastewater disposal system
|__|__| Grease / Oil Separator
|__|__| Dish Washer
|__|__| Roof Drain
|__|__| Garbage Disposal
|__|__| PIPING RELOCATION: of sanitary
|__|__| Bidet
|__|__| Laundry Tub
lines, drains, and piping without
|__|__| Other: _____________________
|__|__| Water Heater
new fixtures.
|__|__| Fixtures (Subtotal) Column 2
|__|__| Fixtures (Subtotal) Column 1
|__|__| Fixtures (Subtotal) Column 2
OR
|__|__| TOTAL FIXTURES
TRANSFER FEE
[$10.00]
|____|______________Fixture Fee_____________________
|____| Transfer Fee
SEE PERMIT FEE SCHEDULE
FOR CALCULATING FEE
|____| Hook-Up & Relocation Fee
|____| PERMIT FEE (TOTAL)
 Owner  Town Copy  State Copy
PAGE 1 OF 1
HHE-211 Rev. 08/2011