Fast Track Interconnection Application
Persons interested in applying for the interconnection of a distributed energy resource to the Utility’s
distribution system through the Fast Track or Study Processes are to fill out this Interconnection
Application. The Interconnection Application is to be filled out completely by the applicant or as noted
in each section of the application. The Utility will contact the applicant within 10 business days once the
Interconnection Application and the corresponding processing fee is submitted to the Utility. The Utility
will then notify the applicant of the completeness of their application. If the application is deemed
incomplete by the Utility, the Utility will provide the applicant with a list of missing material. The
applicant will then have 10 business days to provide the Utility with this information or request an
extension, otherwise the application will be deemed incomplete and the applicant will lose their place in
the queue. Section that are noted with * are required to be filled out.
Checklist for Submission to Utility
The items below shall be included with submittal of the Interconnection Application to the Utility.
Failure to include all items will deem the Interconnection Application incomplete.
Non-Refundable Processing Fee
Fast Track
$100 + $1/kW for Certified Systems
$100 + $2/kW for Non-Certified Systems
Study Process
$1,000 + $2/kW down payment. Additional study fees may apply.
One-line diagram
This one-line diagram must be signed and stamped by a Professional
Engineer licensed in Minnesota if the DER is uncertified greater than 20 kW
AC or if certified system is over 250 kW.
Details required on one-line diagram specified at the end of the
interconnection application.
Schematic drawings for all protection and control circuits, relay current circuits,
relay potential circuits, and alarm/monitoring circuits
Inverter Specification Sheet(s) (if applicable)
Documentation that describes and details the operation of protection and control
schemes
Documentation showing site control
Aerial map showing DER system layout including major roadways and true north
Possible Additional Documentation
If the DER export capacity is limited, include information material explaining the limiting capabilities.