02/25/2019 Page 2 of 2
The permit becomes null and void if work or construction authorized by the permit is not commenced within 180 days of
issuance or if construction or work is suspended or abandoned for a period of 180 days at any time after work is
commenced, unless an extension is granted. Issuance of this permit does not give the authority to violate any federal,
state, or local laws or ordinances, or the building code regulating construction. Separate permits (building, plumbing,
mechanical, sewer, water connection, electrical, etc.) may be required for work performed on this site. Additional permits
/plans may be required prior to Certificate of Occupancy issuance. Contact SRCAA at 509-477-4727 and/or visit
www.spokanecleanair.org
to ensure compliance with air quality regulations. The applicant shall be responsible for
obtaining additional permits/approvals from affected agencies. By checking the box below, I certify that I have read and
understand all of the conditions contained herein and I have the authority to sign on behalf of the applicant. Additionally, I
certify that my signature included on the permit, if done by electronic means, provides the same understanding and
authority as if I had signed the permit in person or writing.
BY SIGNING BELOW, I GIVE MY PERMISSION FOR USE OF MY ELECTRONIC SIGNATURE ON THE PERMIT AND I
ACKNOWLEDGE THAT I UNDERSTAND AND AGREE TO THE TERMS DESCRIBED ABOVE.
BUILDING INFORMATION (PLANNING, ENGINEERING & BUILDING OFFICE USE ONLY)
Sq. Ft.: Fire flow requirement for structure:
PROJECT VALUE:
Notes and Conditions
click to sign
signature
click to edit