Energy Efficiency Design Summary
(for Part 3 Buildings)
Applications After December 31, 2017
December 6, 2017 T:\Building\Resource Conservation\1 - Permit Application\Part 3 EE Forms\Part 3 - 2018\EEDS Form - Part 3 After Dec 31, 2017.doc
This form and the documentation summarized in the table below must be submitted with the permit application for
all new Part 3 buildings and additions submitted after December 31, 2017. All forms are to be completed and
signed by the individual(s) who reviews and takes responsibility for the energy efficiency aspects of this project.
Select
Path
(1)
Compliance Path Description Required Documentation
(2)
Submissi
on
Format
(3)
-
Applies to all projects
Air barrier section and detail drawings
Electronic
Heat loss / gain calculations
Ventilation rate calculations
Electronic
A
Exceed by not less than 17.5% the
energy efficiency levels attained
by conforming to the ASHRAE
90.1-2010 per 12.2.1.2.(2)(a) and
Division 1 of SB-10 1.1.2.1.(1)(b)
MMA “Form A”
ASHRAE 90.1 Mandatory Provision Checklists:
MMA Form 6.4
MMA Form 9.4
Energy simulation output report including:
a. Summary of design inputs
b. Annual energy consumption summary for
proposed and reference buildings
CO
2
e emission calculations
(4)
Peak electric demand calculations
(5)
Electronic
B
Achieve the energy efficiency
levels attained by conforming to
ASHRAE 90.1-2013 and Chapter
2 in Division 3 of SB-10
“Project Information” form
ASHRAE 90.1-2013 Mandatory Checklists:
MMA Form 6.4
MMA Form 9.4
CO
2
e emission calculations
(4)
Peak electric demand calculations
(5)
Electronic
C-1
Exceed by not less than 13% the
energy efficiency levels attained
by conforming to the 2011 NECB
and Chapter 3 in Division 2 of SB-
10 per 12.2.1.2.(2)(a) and Division
1 of SB-10 1.1.2.1.(1)(d)
NECB forms
Energy simulation output report including:
a. Summary of design inputs
b. Annual energy consumption summary for
proposed and reference buildings
CO
2
e emission calculations
(4)
Peak electric demand calculations
(5)
Electronic
C-2
Achieve the energy efficiency
levels attained by conforming to
the 2015 NECB and Chapter 3 in
Division 3 of SB-10
“Project Information” form
2015 NECB forms
CO
2
e emission calculations
(4)
Peak electric demand calculations
(5)
Electronic
D
Achieve the energy efficiency
levels attained by conforming to
Section 7 of ASHRAE 189.1-2014,
excluding Sections 7.2.b, 7.4.7.3,
7.4.8, & 7.5
“Project Information” form
All Relevant MMA Forms
CO
2
e emission calculations
(4)
Peak electric demand calculations
(5)
Electronic