Energy Efficiency Design Summary
(for Part 3 Buildings)
Applications After December 31, 2017
December 6, 2017 T:\Building\Resource Conservation\1 - Permit Application\Part 3 EE Forms\Part 3 - 2018\EEDS Form - Part 3 After Dec 31, 2017.doc
Project Address:
Application Number:
This form and the documentation summarized in the table below must be submitted with the permit application for
all new Part 3 buildings and additions submitted after December 31, 2017. All forms are to be completed and
signed by the individual(s) who reviews and takes responsibility for the energy efficiency aspects of this project.
Select
Path
(1)
Compliance Path Description Required Documentation
(2)
Submissi
on
Format
(3)
-
Applies to all projects
Air barrier section and detail drawings
Electronic
Heat loss / gain calculations
Ventilation rate calculations
Electronic
A
Exceed by not less than 17.5% the
energy efficiency levels attained
by conforming to the ASHRAE
90.1-2010 per 12.2.1.2.(2)(a) and
Division 1 of SB-10 1.1.2.1.(1)(b)
MMA “Form A”
ASHRAE 90.1 Mandatory Provision Checklists:
MMA Form 5.4
MMA Form 6.4
MMA Form 7.4
MMA Form 8.4
MMA Form 9.4
MMA Form 9.5
Energy simulation output report including:
a. Summary of design inputs
b. Annual energy consumption summary for
proposed and reference buildings
CO
2
e emission calculations
(4)
Peak electric demand calculations
(5)
Electronic
B
Achieve the energy efficiency
levels attained by conforming to
ASHRAE 90.1-2013 and Chapter
2 in Division 3 of SB-10
Project Information” form
ASHRAE 90.1-2013 Mandatory Checklists:
MMA Form 5.4
MMA Form 6.4
MMA Form 7.4
MMA Form 8.4
MMA Form 9.4
MMA Form 9.5
CO
2
e emission calculations
(4)
Peak electric demand calculations
(5)
Electronic
C-1
Exceed by not less than 13% the
energy efficiency levels attained
by conforming to the 2011 NECB
and Chapter 3 in Division 2 of SB-
10 per 12.2.1.2.(2)(a) and Division
1 of SB-10 1.1.2.1.(1)(d)
NECB forms
Energy simulation output report including:
a. Summary of design inputs
b. Annual energy consumption summary for
proposed and reference buildings
CO
2
e emission calculations
(4)
Peak electric demand calculations
(5)
Electronic
C-2
Achieve the energy efficiency
levels attained by conforming to
the 2015 NECB and Chapter 3 in
Division 3 of SB-10
Project Information” form
2015 NECB forms
CO
2
e emission calculations
(4)
Peak electric demand calculations
(5)
Electronic
D
Achieve the energy efficiency
levels attained by conforming to
Section 7 of ASHRAE 189.1-2014,
excluding Sections 7.2.b, 7.4.7.3,
7.4.8, & 7.5
Project Information” form
All Relevant MMA Forms
CO
2
e emission calculations
(4)
Peak electric demand calculations
(5)
Electronic
Energy Efficiency Design Summary
(for Part 3 Buildings)
Applications After December 31, 2017
December 6, 2017 T:\Building\Resource Conservation\1 - Permit Application\Part 3 EE Forms\Part 3 - 2018\EEDS Form - Part 3 After Dec 31, 2017.doc
If the building is exempt from the energy efficiency requirements of Part 12 and MMAH Supplementary Standard
SB-10, please describe the reason and provide the relevant Ontario Building Code reference (see document
“Buildings Exempt from Compliance with Supplementary Standard SB-10):
Notes:
1. Part 12 and MMA Supplementary Standard SB-10 (December 22, 2016) outline the compliance path options
for Part 3 building permit applications made after December 31, 2017.
2. The MMA SB-10 compliance checklist forms for use after December 31, 2017 are available for download to
patrick.andres@guelph.ca or via the link on the City of Guelph website: http://guelph.ca/building
3. All documents must include the permit application number and project address. Electronic copies of
documentation must be submitted to patrick.andres@guelph.ca
at the time of initial permit application. Please
provide files as PDFs.
4. Annual CO
2
e emission requirements for paths B, C-2 and D are deemed to be satisfied if the prescriptive
requirements set in 1.1.2.2.(2), (3), or (4) are met. If energy efficiency compliance is demonstrated using A-2,
C-1, either the Energy Cost Budget Method of ASHRAE 90.1- 2013 or the Building Energy Performance
Compliance Path of the 2015 NECB, calculations for annual CO
2
e emissions must be determined in
accordance with good engineering practice and using the CO
2
e emission factors listed in Division 3, 1.1.2.2 of
MMAH Supplementary Standard SB-10.
5. Peak electrical demand requirements for paths B, C-2 and D are deemed to be satisfied if the prescriptive
requirements set in 1.1.2.3.(1), (2), or (3) are met. If energy efficiency compliance is demonstrated using A-2,
C-1, either the Energy Cost Budget Method of ASHRAE 90.1- 2013 or the Building Energy Performance
Compliance Path of the 2015 NECB, peak electrical demand must be calculated and shall not exceed the
peak electric demand of the corresponding budget or reference building.
OR
Demonstrate that the prescriptive requirements set in 1.1.2.1 have been met for energy efficiency of cooling
equipment, fan power limitations for cooling and ventilation systems, and interior lighting power density,
where the building’s peak electric demand happens in summer or the space and water heating equipment,
fans, pumps and interior lighting power density, where the building’s peak electric demand happens in winter.