Version 2.1 [4/16/2018]
Date:__________________ _____________________________________________________________
Engineering Division Authorized Signature
Curb Cut Application
Requires 3 WORKING days minimum for review by Engineering Division prior to Construction
Residential Driveway
Alley Approach - 14' Typical Width
Industrial Driveway - 30' Maximum Width
Applicant Name:
Submission Date:
Contact Information (Phone and Email):
Property Address:
1. Does the existing lot meet setback requirements for the governing district?
Yes No
N/A Yes No
2. For lots being improved, has a variance been granted from the Board of Zoning Appeals?
3. Are there any intersections within 50' of the proposed residential drive?
(Industrial approach requires 100' distance from intersections)
Yes
Provide Proximity
No
4. Are there any obstructions near the drive? (i.e light poles, hydrants etc.) If so, list
here: ___________________________________________________________________________
Yes No
Yes No
5. Does the existing property have access to garage via an alleyway?
Yes No
Drawing of proposed work must be included with this application
**Contractor bonded with Public Works shall pull a permit for construction work in the Right of Way
ENGINEERING OFFICE USE ONLY:
Approved Approved as Noted Denied as Noted Traffic Study Required
Comments:____________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
City of South Bend Public Works
Engineering Division
227 W. Jefferson, County City Building 1316
South Bend, IN 46601-1830
Phone: 574.235.9251
Fax: 574.235.9171
Type of Curb Cut:
10' (Single)
16' (Max Width)
Commercial Driveway - 24' Maximum Width
6. Does the proposed work meet clear sight area requirements?
Complete each item:
Additional Comments: ___________________________________________________________________________________________
~New engineering review and approval required after 3 months if no permit has been issued for work~
Email:rowpermitsoffice@southbendin.gov
click to sign
signature
click to edit
Driveway Specifications and Standards
Go to www.southbendin.gov
My Government>Departments>Public Works>Divisions>Engineering
On left side of page see:
Design & Construction Standards & Prevailing Spec for Public Works
Also, See South Bend Municipal Code for zoning and property improvement guidelines.
**Contractor bonded with Public Works shall pull a permit for construction work in the Right of Way.
Permit fees for construction in the Right of Way: