Construction Site Stormwater Management
Quiz
Project Name ______________________________________
Company Name ____________________________________
Contact Name _____________________________________ Job Title ________________
Cell # _________________ Quiz Score _____ % NWA Video ________ Excal Video _______
Please mark the best answer for each question.
What do you call the devices and structures present at construction sites that prevent
stormwater pollution?
o BMPs
o Silt fences
o Site grading
o EPAs
Which of the following are types of stormwater BMPs?
o Erosion control measures
o Sediment control measures
o Waste Management measures
o All of the above
The SWPPP is a legal contract to meet EPA an ADEQ requirements.
o True
o False
A SWPPP must be submitted ADEW for all sites no matter the size of disturbance.
o True
o False
How do most sediment control BMPs like silt fence work?
o By ponding water to allow sediments to settle out of runoff
o As a filter
o By scraping vehicle tires
o By preventing exposure of materials to stormwater
Over
The University of Arkansas System Division of Agriculture offs all its Extension and Research programs
and services without regard to race, color, sex, gender identity, sexual orientation, national origin,
religion, age, disability, marital or veteran status, genetic information, or any other legally protected
status, and is an Affirmative Action/Equal Opportunity Employer.
Where should cement truck wash out after delivering their load?
o Anywhere on the construction site
o In the nearest stream or creek
o At the designated wash out area
o Cement trucks should never wash out
Which of the following is not required to be posted/available on site?
o Notice of intent
o Notice of coverage
o Stormwater Pollution Prevention Plan
o Completed inspection forms
Why must silt fence be trenched in?
o To prevent runoff flowing underneath it
o To prevent wind erosion
o So it cannot be easily pulled out of the ground
o To hold up the stakes
Local jurisdictions that have municipal stormwater permits may require additional
permitting procedures beyond ADEQ requirements.
o True
o False
How often must you inspect your construction site?
o At least once every day
o At least once every week
o At least once every month
o It depends on what is listed in the sites SWPPP (at least once every 7 days OR at
least once every 14 days and within 24hrs of the end of a ¼” rain event)