THE SIGNED APPLICANT AGREES
1. that all alternate possibilities have been exhausted for accessing the construction site without using the Minneapolis Parkway;
2. to bear all costs of policing, cleaning and restoring park property and parkways including removal of erosion control measures after
stabilization is complete as associated to the Park Board permit;
3. to reimburse the Park Board for all such costs incurred by the Park Board;
4. that the Applicant is responsible for obtaining all necessary permits from other agencies in addition to this construction permit;
5. that if the information provided in this application is found to be misleading or inaccurate, especially vehicles and equipment weight, it
may result in suspension of permit, administrative action, imposition of fine(s), and the rejection of future right-of-entry;
6. that failure to abide by the terms of the permit or any other applicable permits laws, rules or city, county, and state regulations,
including truck idling restrictions, may result in revocation of the permit;
7. that the permit applicant shall be solely responsible for any and all fines, civil liability, and criminal prosecution arising from applicable
laws, rules or city, county, and state regulations;
8. Park Board permits are issued for six (6) weeks maximum. Permits can be extended one time at no charge for two (2) weeks due to
inclement weather or unforeseen circumstances. A new permit and fee will be required after this extended period has ended;
9. if a longer duration construction permit is initially sought (more than 6 weeks), the Applicant must obtain prior approval from Cliff
Swenson, Director of the Minneapolis Park Board Design and Construction Management Division, before a longer duration permit can
be processed;
10. that the Applicant must adhere to MnDOT Spring Weight Restriction Requirements and verify restriction dates;
11. that the Applicant, its consultants, subcontractors, design professionals and agents hereby agree to hold harmless, defend and
indemnify the Minneapolis Park Board and its agents from and against any liability, loss, claims, suits, losses, costs, and legal fees caused
by, or damage arising out of and resulting from the work performed pursuant or occurring in connection with the work herein. This
indemnity is intended to allocate to the Applicant the responsibility for personal injury (including death) caused by the Applicant, its
subcontractors and design professionals/consultants during the course of the project encompassed in this permit;
12. it is further agreed by and between the parties that as a condition precedent to the Applicants obligations to indemnify the
Minneapolis Park Board, the Applicant shall: promptly notify the Minneapolis Park Board Design and Construction Management
Division in writing of any alleged claim, loss or damage for which indemnification is sought; within ten (10) days of receipt of notice to it
of such claim, loss or damage, forward to Cliff Swenson, Director of the Minneapolis Park Board Design and Construction Management
Division, the names and addresses of the claimants, the names and addresses of any witnesses, the damages alleged, the date of the
alleged occurrence, and any other information available to the Applicant regarding the claim/loss and to cooperate fully with the
Minneapolis.
MPRB PERMIT CATEGORIES & FEE SCHEDULE
Note: Typical construction permits are based solely on vehicle or equipment weight. Additional fees may apply.
STANDARD PERMIT CATAGORIES
1. TYPE 1 CONSTRUCTION (residential, commercial or institutional)…………..……………………………..……………..….... $210
Construction Vehicles or Equipment with a 7,000 GVW (Gross Vehicle Weight) or less
2. TYPE 2 CONSTRUCTION (residential, commercial or institutional)…………………….….……..……….…………...….…… $420
Construction Vehicles or Equipment with a 5 ton per axle maximum weight (weight verification required)
RESTRICTED PERMIT CATEGORY - HEAVY EQUIPMENT (see also Type 3 Construction Notes)
3a. TYPE 3 CONSTRUCTION - WINTER - HEAVY EQUIPMENT (residential, commercial or institutional)……….............…..... $525
Construction Vehicles or Equipment over 5 ton per axle maximum weight during winter from Mid-December to Mid-March
(Assuming the ground is still frozen before and after this time frame)
3b. TYPE 3 CONSTRUCTION - SEASONAL - HEAVY EQUIPMENT (residential, commercial or institutional)……….…….……. $525*
Construction Vehicles or Equipment over 5 ton per axle maximum weight during Spring, Summer and Fall after Mid-March thru Mid-
December (Assuming the ground is not frozen during this time frame)
* Type 3b Pavement Damage; if the Minneapolis Park Board parkway pavement is damaged by the applicant/licensee during access
to their construction site from a Minneapolis Park Board Parkway a minimum 2” pavement mill and 2” bituminous overlay will be
required from the Parkway Access point to the Parkway Exit point. Refer to Type 3 Construction Notes for added information.
This 2” Bituminous Mill and Overlay replacement shall meet MnDOT Specification 2360, SPWEB540L, Level 5, wearing surface and
Minneapolis Code of Ordinances 429 & 430. Minneapolis Paving Engineer, Larry Matsumoto, 612-919-1148
Applicant shall provide with this application one of the two (2) options listed below for a 2” mill & overlay, whichever is greater;
* 3b Permit Fee plus the amount of the 2” Mill & Overlay Price Quote or a 50,000 “Construction Bond” or “Letter of Credit”