Grove City Building Division
4035 Broadway
Grove City, OH 43123
614-277-3075 (Phone)
614-277-3090 (Fax)
GroveCityOhio.gov
24-Hour Inspection Line: 614-277-1815
For next business day inspections, requests must be called in before noon or contractors may use the online inspection service as late as 8 p.m., seven days a week.
Permit No. ______________________________________________________________________
Method by which you would like your permit returned: o Fax o Email o Pickup
SITE/SIGN INFORMATION
Ground Sign Setback (min. 10’ r.o.w.) _____________ Cost __________________________
Lot Frontage
________ Building Frontage __________ Width of Tenant Space _________
Total No. of existing ground signs on site __________ Total Area ____________________
Total No. of existing wall/window signs on site
_____ Total Area ____________________
PROPERTY INFORMATION
Address _________________________________________________________________________ Unit/Ste. __________ Grove City, OH 43123
Parcel I.D.
_____________________________Development ____________________________________ Zoning _________ HPA ___________
PROPERTY OWNER INFORMATION
Name _______________________________________________________________ Phone ____________________________________________
Address _____________________________________________________________ Email _____________________________________________
CONTRACTOR INFORMATION Registration No. ______________________________________________
Contractor ______________________________________________________________ Contact ________________________________________
Address ________________________________________________________________ City/State/Zip___________________________________
Phone
________________________ Fax __________________________ Email ______________________________________________________
Signature ___________________________________________________________________________________________ o Owner o Agent
OFFICE USE
Receipt # __________________________
o Cash o Card o Check
Ref. #
______________________________
Date Entered ______________________
Date Issued ________________________
APPROVAL
o Approved o Not Approved
o Approved As Noted
By
_______________ Date ____________
FEES
Base Fee (first sign) $ 50.00
____ Additional
Signs x $25 $ ____________
HPA Sign $15 $
A-frame $ 0.00
Subtotal $ ____________
State Fee 3% $ ____________
Total Fees Due $ ___________________
BUSINESS/OCCUPANT INFORMATION
Business Name ________________________________________________________________
Business Contact ______________________________ Phone ________________________
Email__________________________________________________________________________
COMMERCIAL SIGN
PERMIT APPLICATION
Type Style Qty. Dimension
Total
SQ. FT.
Copy/Message Ill.
Checkbox Abbreviations: Type: New (N), Alteration (A) or Replacement (R) Style: Wall (Wa), Monument (M) or Window (Wi)
Illumination: Internal (In) or External (Ex)
q N
q A
q R
q Wa
q M
q Wi
q In
q Ex
q N
q A
q R
q Wa
q M
q Wi
q In
q Ex
q N
q A
q R
q Wa
q M
q Wi
q In
q Ex
Total Square Footage for All Signs
(Excluding Ground Signs)
SUBMITTAL REQUIREMENTS: 2 sets of the following with this application: (1) scaled and dimensioned site plans
showing all existing and proposed signs, their size and height, streets, property lines and buildings on site;
(2) colored, scaled and dimensioned elevations of all proposed signs with applicable foundation and attachment
details and manufacturer’s information for all light fixtures on externally lit signs; (3) scaled and dimensioned
landscape plans for ground signs listing type, size and quantity of plants. • The installer and owner of this sign(s)
agrees to conform to the regulations of Chapters 1145/1138 of the Codified Ordinances of the City of Grove City,
State of Ohio and the National Electric Code pertaining to signs and the installation of signs and to construct the
proposed sign(s) in accordance with the plans and specifications submitted herewith and certify the information and
statements given on this application, plans and specifications are to the best of their knowledge true and correct.
SEPARATE ELECTRIC PERMIT
AND PRE-INSTALLATION
INSPECTION REQUIRED
Revised 12/2019