Infrastructure Project Checklist/Information
□ Upon submittal of the Initial Infrastructure Application
the following must be submitted:
Two (2) sets of plans
One (1) set of plans in an electronic format
Plan review fee (reference fee schedule
attached to application)
□ Please allow at least 10-15 business days for review of
your plans
□ Once plans have been approved, a Pre-Construction
Meeting will need to be scheduled by contacting Debbi
Eben at Jones|Carter (281-762-6531). The Contractor
as well as the Engineer should be present at this
meeting.
□ Prior to the issuance of the Contractor’s Permit, the
following must be submitted:
Spec Books & Plans - 3 CD’s (PDF Format)
4 full size sets of signed plans (5, if Capital
Improvement Project)
4 half size sets of signed plans
3 Copies of Pre-Con sign in list
2 Copies of NTP (Notice to Proceed)
Copy of Executed Agreement (between Owner
and Contractor) with Contract Amount
□ If the project is disturbing one acre of land or more
(within the City Limits) you will be required to apply for
a Land Disturbance Permit. In order to apply, the
following MUST be received by the permit office:
Proof of filing Notice of Intent with the State
(through TCEQ)
Complete, BOUND copy of the SWPPP (Storm
Water Pollution Prevention Plan)
□ Once project is completed, the following must be
submitted:
As-Built/Record Plans - 2 Full Size
As-Built/Record Plans - 2 Half Size
As-Built/Record Plans – 3 CD’s (PDF & *GIS
Data or CAD Format; See Provided Details)
Final Inspection Letter from Engineer