The City of Rosenberg has adopted 2018 International Building Codes, 2015 International Energy Code, and 2017
National Electrical Code. All building construction plans must adhere to these building codes and City Ordinances.
SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND MECHANICAL.
APPROVED PERMIT BECOMES VOID IF THE WORK OR CONSTRUCTION AUTHORIZED BY THIS PERMIT
HAS NOT COMMENCED WITHIN 180 DAYS.
General Information:
▪
Permits will only be issued for lots on approved subdivision plat, on file with the Planning Department.
▪
The City of Rosenberg collects water and wastewater impact fees.
▪
Have your structure designed to meet 110 MPH-3 second gust wind speed.
▪
Approved plans must be available on site for the Building Inspectors to view when necessary. Failure to have a
copy of the plans with the City approval stamp available on-site during inspections will result in failed inspections.
▪
Address must be visible from the street. Failure to comply with this safety requirement will result in failed
inspections.
▪
Plan check fees are due upon submittal of information. All other applicable fees for building permits and impact
fees are payable upon final approval of the building permit.
▪
Standard turn around for Plan Review is 10-15 Business Days, non-cumulative. Resubmittals are subject to the
same timeframe
I hereby certify I have read and examined this document and know the same to be true and correct. All provisions of law and
ordinances governing this type of work will be complied with, whether specified herein or not. I further understand that plans
submitted for approval will be subject to a comprehensive review against municipal ordinance and building code. Any set of
plans that must be returned for modifications or corrections in order to come into compliance with ordinance or code will be
subject to rechecking in order of submittal. Under no circumstances will paid fees be refunded or transferred.
Applications and plans will be held for 180 days. After 180 days this application and any associated plans will be
voided and disposed of, unless a valid building permit is issued.
Signature of Owner or Authorized Agent Date
As required for Public or Commercial building by Senate Bill 509 (Effective January 1, 2002)
Was an asbestos survey performed in accordance with Texas Asbestos Health Protection Rules (TAHPR) and the
National Emission Standards for Hazardous Air Pollutants (NESHAP)? □ Yes
Date of Survey: TDH Inspector License No. Copy Attached? □ Yes □ No