Please return form to:
City of Creve Coeur
Building Division
300 N New Ballas Rd
Creve Coeur, Mo. 63141
City of Creve Coeur
Demolition Permit and Guidelines
Application Date _________________ Residential _____ Commercial _____
Property Owner Name ______________________________________________________
Property Owner Address _____________________________________________________
Property Owner Telephone ___________________________________________________
Property Owner Email _______________________________________________________
Contractor Name ____________________________________________________________
Contractor Address _________________________________________________________
Contractor Telephone ______________________________ Fax ______________________
Contractor Email ____________________________________________________________
Does hereby make application to demolish the structure commonly known as and located at:
_________________________________________________________________________
Please check all that apply:
Entire Structure _____ Septic System _____
Potable well _____ Swimming Pool _____ Accessory Structures _____
Interior Commercial Demolition ______ Interior Residential Demolition ______
Provide 2 sets of plans for the scope of work for commercial AND residential interior demolition.
Demolition Start Time & Date: ___________________________________________
*Demolition Work Shall Be Completed Within Thirty (30) Days After The Date Of Issuance Of The Demolition Permit.
*See The Inspection Card For Required Inspections.
BY ______________________________________________
( ) owner ( ) agent / contractor
Permit Number
Permit Fee $200.00
Refundable Escrow $2000.00
APPROVED BY
DATE ISSUED
Office Use Only
Date of Final Inspection
Escrow Deduction & Reason
Release
Permit #
Copy of Payment
City of Creve Coeur
Demolition Permit Requirements
Two complete sets of the following:
1. Written utility disconnect notices:
a) Ameren UE
b) Laclede Gas
c) Missouri American Water (licensed plumber required to destroy tap)
Excavation permit required from the Creve Coeur Dept. of Public Works if in ROW
Applicant must provide St. Louis County PERMIT number for plumbing permit
d) Metropolitan Sewer District (licensed plumber required to destroy connection at the wye of the main
sanitary sewer line.)
Excavation permit required from the Creve Coeur Dept. of Public Works if in ROW
Applicant must provide St. Louis County PERMIT number for plumbing permit
e) 1-800-DIG-RITE confirmation number.
2. Asbestos abatement report / permit from St. Louis County. Contact Keith Street at St. Louis County,
615-8913, for further information. See attached form.
3. Waste Disposal Authorization from St. Louis County. Contact Alan Reinhardt at St. Louis County,
615-4112, for further information.
4. Potable wells must be properly sealed by a licensed well drilling company and reported to the
Department of Natural Resources in Rolla, MO.
5. Septic Systems shall be destroyed by a licensed plumber:
a) Septic tank shall be evacuated by a licensed special waste hauler.
b) Septic tank shall be completely removed and hauled away.
6. Provide a site plan which shows the following:
a) All property lines, building address and all right-of-ways
b) All buildings / structures / sidewalks to be removed
c) Locate trees to be preserved and provide temporary fence at drip line
d) Locate trees to be removed
e) Show location of ingress and egress for equipment / trucks
f) Temporary construction access (when existing curb cut / driveway not used) must obtain temporary
road permit from the Creve Coeur Department of Public Works
7. Provide enlarged details or notes which address the following:
a) Site protection excavations, trenches, debris piles shall be fenced with a 48” safety fence at any
time the site is unattended. Support rods located 10’ O.C. minimum.
b) Erosion Control siltation control shall be established to prevent damage to adjacent public and/or
private property. Provide detail of siltation control method.
c) Site Restoration method of re-vegetation, finish grade to 3:1 slope or less.
Site shall not be required to be restored if building permit and construction activity begins within
thirty (30) days of demolition.
Backfill of excavations shall not include ANY wood or construction debris. All fill material shall
be clean dirt or rock unless prior approval for alternative fill material is granted by the Building
Official (Steve Unser, 872-2500).
Repair of R.O.W. if necessary.
d) No heavy equipment shall be loaded or unloaded on public street or right of way without prior
approval from the Creve Coeur Department of Public Works.
e) Dust Control method of controlling blowing and drifting debris shall be specified by the Building
Department.
Debris may be required to be watered-down while loading. Permit to tap hydrant required on site.
f) Project Schedule provide a detailed estimate of starting date, working dates, inspection dates
and completion date.
ALL REQUIREMENTS OUTLINED ABOVE SHALL BE SATISFACTORILY ADDRESSED
PRIOR TO THE ISSUANCE OF A DEMOLITION PERMIT. FAILURE TO INCLUDE THE
NECESSARY INFORMATION WILL RESULT IN A DELAY IN PERMIT ISSUANCE.