ASBESTOS DUST MITIGATION PLAN APPLICATION
BAY AREA AIR QUALITY MANAGEMENT DISTRICT 375 Beale Street, Ste. 600, San Francisco, CA 94105
Page 2 of 5
4. Additional Information
The following information MUST be included:
Map(s) clearly indicating:
If available, please attach the
following information:
Property lines / boundaries
Rights of way / easements
Areas to be cleared or graded
Trenching areas
Excavation sites
Storage areas / piles
Track-out control
Staging areas for removal
Truck routes
On-site parking lots
Geologic Information
Topographical Maps
Meteorological Data
CONSTRUCTION AND GRADING OPERATIONS CHECKLIST FOR
PROJECTS GREATER THAN AN ACRE
ELEMENTS THAT MUST BE INCLUDED:
Each of the following sources of dust emissions MUST be addressed in the Asbestos Dust
Mitigation Plan:
Track-out onto the paved public road;
Active storage piles;
Inactive disturbed surface areas and storage piles;
Traffic on unpaved on-site roads;
Earthmoving activities;
Off-site transport of materials; and
Post-project stabilization of disturbed soil surfaces.
ASBESTOS AIR MONITORING PLANS:
If required by the District, complete an Asbestos Air Monitoring Plan for District approval.
An air monitoring plan MAY BE
required if one or more of the following lies within a quarter mile (400
meters) of any boundary of an area to be disturbed:
Residence;
School / Daycare center;
Industrial Facility
Business;
Park / Playground;
Hospital / Nursing Home
Development of an Asbestos Air Monitoring Plan does not constitute a requirement to
implement air monitoring.
However, if the District would like to determine the effectiveness of the application of the dust
mitigation measures listed in your dust mitigation plan, the plan would be required to be implemented
within one business day of notification from the District.