1101 EAST FIRST STREET SANFORD FL 32771-1468 PHONE (407) 665-7050 FAX (407) 665-7486
Attention Roofing Contractors:
COMMERCIAL B167 Roof in Progress Guideline
1.
A MINIMUM of 50% of the roof must be properly dried-in and flashed at the time of the inspection.
This inspection covers the code requirements for the installation of the underlayment, flashing, drip,
valley linings and roof deck insulation.
2.
A MAXIMUM of 50% of the roof is allowed to have the replacement roof covering installed at your
own risk, prior to this Inspection. In addition, at least one valley must remain open, leaving the
underlayment and valley liner exposed for the inspection.
3.
The product approvals and the installation instructions for all of the materials used for the re-roof,
must be on site for all of the inspections.
4.
The roofing contractor or their representative is required to be onsite for the in-progress inspection,
prepared to expose areas if necessary for the code compliance inspection.
5.
Contractor shall provide access to multi story roofs for all inspections. If ladder is used, it needs to
extend three feet above roof deck, be set at the proper angle and be properly tied off.
All contractors are encouraged to go online to:
https://egov.seminolecountyfl.gov/Click2GovBP/ScheduleInspections.jsp
At this webpage you can schedule your inspection. On the day of your inspection, as early as
7:00am, you can look up your inspection to find your assigned Inspector and their phone number.
You can call them for an estimated time of arrival to your site.
PLEASE NOTE:
A COMPLETED, NOTARIZED, COMMERCIAL ROOF IN-PROGRESS AFFIDAVIT
MUST BE ONSITE AT THE TIME OF THE FINAL INSPECTION
BPCustomerservice@seminolecountyfl.gov www.seminolecountyfl.gov